Monthly Operating Rept for Nov 1981
ML20065T932
Person / Time
Site: Millstone 
Issue date: 12/02/1981
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20065T930 List:
References
NUDOCS 8211030259
Download: ML20065T932 (5)


Text

..

OPERATING DATA REPORT 50-336 DOCKET NO.

DATE 12-2-81 COMPLETED BY G. H. Howlett TELEPHONE (?O3) da7-1791 x4431 OPERATING STATUS Millstone 2 Notes

  • Items 21 & 22
1. Uni Name:

Cumulative are computed November 1981

2. Reporting Period:

mg a MgMed average.

3. Licensed Thermal Power (MWt):

27nn 909

4. Nameplate Rating (Gross MWe):

870

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 816 864
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None None

9. Power Level To Which Restricted,1f Any (Net MWe):

None

10. Reasons For Restrictions,If Any:

f t

lhis Month Yr to Da:e Cumulative 720 8,016 52,008

11. Hours In Reporting Period 720 7,235 38.484.3
12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hours 0

0 2.076.9 720 7,131 36,900

14. Hours Generator On-Line 0

0 468.~2

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,942,822 18.912.805 92.140.126
17. Gross Electrical Energy Generated (MWH) 632,050,_. 6.241.610 29.914.527 609,928 6,011,221 28,673,267
18. Net Electrical Er.ergy Generated (MWH)
19. Unit Service Factor 100 89.0 71.0 100 89.0 71.9
20. Unit Availability Factor 98.0 86.8 66.3
21. Unit Capacity Factor (Using MDC Net) 97.4 86.2 65.1
22. Unit Capacity Factor (Using DER Net) 0 11.0 20.7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:

Refuel Outage, December 5,1981, 8 weeks.

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed

\\

N/A N/A INITIA L CRITICA LITY N/A N/A INITIA L ELECTRICITY COMMERCIAL OPER ATION N/A N/A P8/77 3 8211030259 811209 PDR ADOCK 05000336 R

PDR

Avt r.4GE D uty es113.Oh1 R LEVEL Docxtr so, _ 50-336 UNIT Millstone 2 12-5-81 DATE CO'.fPLE TED By G H. Howlett III A

TELEPHONE {203)447-1791 x 443T~

November 1981 MONm DAY AYERAGE DAILYl'OWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Nes) iMWe Nes) 1 850 17 845 851 2

is 845 851 3

19 846 851 846 4

20 s

851 846 21 850 6

22 845 fj 851 7

23 844 850 g

24 846 049 9

25 846 849 10 26 846 849 847 r

13 27 12 849 28 847 848 13 29 847 846 34 30 846 845 g3 31 845 16 JNSTRUCTIONS On this formn.!!st the avenge daily s: nit power leselin.'.:We. Net for each dayin the reponin;:n.mth. Comp::ie io

he r.nresi 4 hole mepwatt.

\\

con 2s l

g

---m-r,

==e n-.

W t

~#

MM N

Df

+rN 3

DFwl O *-

"a O.[ EN hC

+r a

w iv w

,u za r

I

\\

I'W 1JC E* *-

Om

.m-5

?

2$maE

!ti g

.m O

3

>C O c s.c O3k H 2 C gg m

>n-gH E

P-N>E

[

m fC NM E

O E

n w C

O 7

OL C

O 1-J M

1 D"t E

O 2

O

)c y

g 5edoC tnenopmoC g

C C

O m

rt

=

E 4edoC K

z metsyS O

5-c b

E o

S o"

g Mz w

3 :

T H

s a e o

5

=

gm a M

3 m

=

m w

c N

G iu 4

rotcaeR nwoD 3

z gnittuhS c

n fo dohteM m

.Q DC 2nosaeR 5-DC Vo

)sruoll(

noitaruD s-C D(

epyT l

Q u

5c 3

c c

>v Z

Docket No.

50-336 Page 1 of 1

Date 12-7-81 Unit Name G. H. Howlett III Completed By (203) 447-1791 X4431 Telephone CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Mon'th-OCTOBER 1981 DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/81 No major corrective maintenance was required during this time period.

h Dockst No.

50-336 Date:

12/1/8' Completed By: G.H. Howlett III Telephone:

203/447-1971 X364 REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown:

Commenced refuel outage December 5, 1981.

3.

Schedule date for restart following refueling: February 1, 1982 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

It is anticipated that Cycle 5 operations will require Technical Specification changes or other License amendments.

5.

Scheduled date(s) for submitting licensing action and supporting information:

Licensing documentation will be provided a minimum of 90 days i

prior to start-up of Cycle 5 or as documented in the R.A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes'in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) iri the core and (b) in the spent fuel storage pool:

l (a)

In Core:

217 (b) _

216 l

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

l 667 1

9.

The projected date of the last refueling that can be discharged to the spent l

fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.

l

-