Confirms 821027 Transmittal of Listed Documents to NRC to Be Used in Upcoming Integrated Design Insp of Auxiliary Feedwater Sys.Proprietary Listings of Design Contractors & off-project Technical Audits Withheld (Ref 10CFR2.790)
ML20065T824
Person / Time
Site: Callaway 
Issue date: 10/29/1982
From: Seiken S
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Allison D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19268B273 List:
References
SLNRC-82-043, SLNRC-82-43, NUDOCS 8211030113
Download: ML20065T824 (2)


Text

  • ~.. g

.a.

4 SNUPPS Standardized Nuclear Unit

  • '*"#~

October 29, 1982 5 Choke Cherry Road "N[0NE'*"d **

SLNRC 82 043 FILE: 0492.13.4 SUBJ:

Integrated Design Inspection SNUPPS/Callaway Plant Mr. Dennis Allison Division of Engineering & Quality Assurance Office of Inspection and Enforcement US Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Allison:

This letter will confirm transmittal to NRC (Norkin) on Oct. 27, 1982 of the following documents to be used (by NRC) in the upcoming Integrated Design Inspection of the SNUPPS/Callaway Auxiliary Feedwater System:

1.

Bechtel Power Corporation proprietary and confidential documents listed in the Bechtel letter of October 27, 1982, copy attached.

2.

Westinghouse Project Information Package (PIP) Subsection 7--Auxil-iary Feedwater System.... designated by Westinghouse as proprietary and confidential.

l 3.

SNUPPS Administrative Control Procedures ( ACP) Manual, Rev. 58 (uncontrolled).

4.

Bechtel Drawings M-02AL01 M-03AL01 M-03ALC2 M-03ALO3 M-03ALO4 M-03AL05 5.

Bechtel System Description M-00AL, Auxiliary Feedwater System, Rev. 3.

6.

Final Safety Analysis Report, Rev.10.

l 7.

Bechtel Project Engineering Organization Charts (Note: Organization Charts of Union Electric and SNUPPS organizations were previously furnished to the NRC).

8.

Chapter 17.1, Rev. 4, QA Programs for Design and Construction, DOOl o

8211030113 821029 PDR ADOCK 05000483 G

PDR l

SLNRC 82-043 -

Page Two 9.

Specified Bechtel Project Engineering (EDPI) Procedures and Proce-dures Index.

A listing of design contractors (2) utilized by Bechtel in the perfor-mance of design and design analyses is cttached; QA manuals prepared and used by each organization in the prosecution of their respective work activities have been requested and will be available the week of Nov. 1st. A listing of Off-Project Technical Audits performed for SNUPPS is also attached.

If you would like to receive copies of any of these audits, please let us know.

If we can be of further assistance in this matter, please advise.

Very truly yours, Iu S.8.Seiken Quality Assurance Manager SJS/dck/8bl4

Enclosures:

As indicated above cc:

D. W. Capone, UE w/o B. L. Meyers, B-w/o J. H. Smith, B w/o R. L. Stright! Staff w/o l