ML20065T787

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Page to Revision 7 of Procedure FNP-0-EIP-16L,consisting of Emergency Plan Equipment & Supplies Checklist
ML20065T787
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/22/1982
From:
ALABAMA POWER CO.
To:
NRC
Shared Package
ML20065T782 List:
References
NUDOCS 8211020706
Download: ML20065T787 (1)


Text

Document Tranm.ittal Form Farley Nuclear Plant

'Productibn Department-Document Control

%IabamaPower A To Date f MD Q CC 9-22-A2

/

i

'h. As:

y This sheet was omitted from the Master Copy when it was revised.

6 d - b b, Piense 4,qere in en your cene-n11 ert cenv.

TRANSMITTED RETURN REQ'STED REMARKS NO.

REV.

Copy NO.

REV.

COPY TITLE ANO/QR NUMBER CP S.

NO.

NO.

CPS.

NO.

N O.

FITP-0-EIP-16L le 7

OSS h O@

Pane 1 of 2 i

_jm Xms' (D.

(

/

Cidd500T 000722 0~

AOOCR 00000000

-GF-INSTRUCTloNS TO ADDRESSEE

1. Vstify the documr.ets received agree with the above description.
2. Incorporate the transmitted documents ento your files.
3. Documents or portions thereof presentty in your possessionwnien are superseded by the documants hereby transmitted must be clearly marked " VOID" or

' troyed, if return of superseded documents is requested in the above " Return Requested" cclumn, attach the superseded documents to this form prior to rning it.

4l'.q'n in the sosce befow indicating that you have completed these instructions and return the routing copy of this forr, to the below address.

Alabama Power Company WSilTE -

ROUTING COPY P. O. Drawer 470 Ashford, Al 36312 signature of Accressee YELLOW SUSPENSE CCPY Attention: Document Control Supervisor 8211020706 821013 PDR ADOCK 05000348

- F PDR

- ~

~ ~ ~ ~.

~ ~ ~ ~ ~ ~~

~'

"'~

. -.