ML20065T748
| ML20065T748 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 10/05/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20065C529 | List: |
| References | |
| NUDOCS 8211020685 | |
| Download: ML20065T748 (2) | |
Text
'
I 7590-01 e
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET Nos. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILIT_Y OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 80 to Facility Operating License No. DPR-32 and Amendment No. 81 to Facility Operating License No. DPR-37 issued to Virginia Electric and Power Company (the licensee), which revised Technical Specifications for operation of the Surry Power Station, Unit Nos.1 and 2, respectively, (the facilities), located in Surry County, Virginia. The amendments are effective as of the date of issuance.
The amendments revise the Technical Specifications related to the degraded voltage protection system. The proposed Technical Specifications require the operability of voltage sensing channels, establishes setpoints for degraded voltage and loss of power, and requires periodic testing and calibration.
The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I,-which are set forth in the license amendments. Prior public notice of these amendments was not required since these amendments do not involve a significant hazards consideration.
8211020685 821005 PDR ADOCK 05000280 P
7590-01
.\\
The Commission has determined that the issuance of these amendments will not result in t.ny significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of thes2 amendments.
For further details with respect to this action, see (1) the application 4
for amendments dated August 17,1982,(2) Amendment Nos. 80 and 81 to License Nos. DPR-32 cnd DPR-37, and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Publit Docu' ment Room,1717 H Street, N.W., Washington, D.C. and at the Swem Library, College of William and f4ary, Williamsburg, Virginia 23185. A copy s
of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission Washington, D.C.
20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this 5th day of October 1982.
FCfTHE NUCL R
LATORY COMMISSION 9
dven rtN, CMo perating Reactors Br h #1 Division of Licensing j
l' l
l