Monthly Operating Rept for Aug 1982
ML20065T100
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/01/1982
From: Scott W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20065T095 List:
References
NUDOCS 8211020215
Download: ML20065T100 (4)


Text

/

MONTHLY NARRATIVE. REPORT OF OPERATION ~

AND MAJCR MAINTENANCE EXPERIENCE This report describes the operating and majormaintenance experience for the month of August, 1982. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

The Auxiliary Salt Water System was washed with inhibited hydrochloric acid to remove barnacle shells and restore rated system flow. Results indicate that the wash successfully removed the barnacle shells. ___ _ _ , , . _

No challenges to the PORV's or safety valves have been made. Furthermore, no changes have been made in the Offsite Dose Calculhtion Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

e o

9 8211020215 820901 PDR ADOCK 05000275 PDR R

W

69-10810 (25) 9/77 v

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO. 50-275 Diablo Canyon Unit 1  ;.

m'IT  !

DATE 9/1/82 COMPLETED BY W. B. Scott

~

TELEPHONE e

MONDI August, 1982 _

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL _ _

(MWe Net) (MWe-Net) 0 17 0

1 0

2 18 0 0 19 3

0 20 0

4 0

5 21 0 22 0 6

0  :

0 23 7 ,

0 -

24 0 8

0 0 9 25 .

10 26 ~

0 0 l1 27 0

12 28 0 29 0 13 0 0 14 30 0 31 0 15 16 0

INS 1 RUCTIONS On this format,hst the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawait.

(4/77) l l

. . . . Q

' ~

. 69-10807 (25) 9/77 l

)

OPERATING DATA REPORT ,

l DOCKET NOJ 50-275 DATE 9/1/E COMPLETED BY W.B. Scott TELEPHONE (805)595-7351 OPERATING STATUS Diablo Canyon Unit 1 Notes

1. Unit Name:

August 1982

2. Reporting Period:

166.9

3. Licensed Thermal Power (MWt):

1170

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 1084 1134
6. Maximum Dependable Ca'pacity (Gross MWe): - -- -

1084

7. Maximum Dependable Capacity (Net MWe):

~

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NONE 9  : '. Power LevelTo Which Restricted,if Any(Net SuspendeMWe)d low Power Test License

10. Reasons For Restrictions,1f Any:

This Month Yr to-Date Cumulative 0 0 0

11. Hours In Reporting Period 0 0 0
12. Number Of Hours Reactor Was Critical 0

. 0 0

13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) _,

0 0 0

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net)

. N/A

22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

NONE November,1982 (fuel 1oad)

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved

~

INITIAL CRITICALITY JAN. 1983 JAN. 1983 INITIAL ELECTRICITY COMMERCIAL OPER ATION JAN 1983 (4/77 )

69-10809 (25) 9/77 50-275 '

.o ,

DOCKET NO.

UNITSilOTDOWNS AND POWER REDUCTIONS UNIT NAME Diablo Canyon Unit 1 DATE 9/1/82 COMPLETED BY RR- 9entt i

REPORT MONTil Auaust 1982 TELEPflONE (Anqi sqq-7 tsi i

i n.

- E c

-,  !? }g Licensee [cg Cause & Corrective

}.c.Y s 53 ~g g ((". Action to No. Date 5g Event H j= 5 Report a mO Pyevent Recurrence j di g g

- 6 ,

810928 F 0 H 4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors. Reanalysis and reviews are being conducted in accordance with Commission's instructions f

I 2 3 4 F: Forced 11eason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data

!!-Maintenance of Test 2-Manual Scram. Entry Sheets for 1.icensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161) li-Operator Training & Ucense Examination .

F-Administrative 5 G-Operational Error (Explain)  ! Exhibit I - Same Source 19/77) Il-Other (E xplain)

.