ML20065S819

From kanterella
Jump to navigation Jump to search
Second Interim Deficiency Rept Re Inadequate Instrumentation & Control Installations & Turnover Documentation.Joint Walkdown Teams Formed to Identify All Existing Conditions Requiring Engineering Evaluation or Rework
ML20065S819
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/21/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0079, W3I82-79, NUDOCS 8211020048
Download: ML20065S819 (1)


Text

I I LOUISIANA 242 OcunONOe Smeer POWER & L1GHT P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 + (504) 366-2345

00$sYS u

L. V. MAURIN October 21, 1982 Vice President Nuclear Operations W3I82-0079 Q-3-A35.07.57 F

Mr. John T. Collins, Regional Administrator, Region IV' U. S. Nuclear Regulatory Commission l" 611 Ryan Plaza Drive, Suite 1000 ,,j Arlington, Texas 76012 CW 9

i g\

~L l \

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 57

" Inadequate Instrumentation and Control Installations and Turnover Documentation" Second Interim Report

REFERENCE:

LP&L Letter W3K-82-0520 dated August 17, 1982

Dear Mr. Collins:

At the present time, Mercury and Ebasco have formed several " Joint Walk Down" teams representing Mercury Engineering, Mercury QC, and Ebasco Construction Engineering. By this method all existing conditions requiring engineering evaluation, corrective action or rework have been identified. Further information concerning the progress of this effort will be supplied by April 4, 1983.

Very truly yours,

,1l w

/

L. V. Maurin LVM/ MAL:keh cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555