ML20065S749

From kanterella
Jump to navigation Jump to search
Forwards Amend 26 to Fsar,Incorporating Responses to Hydrologic & Geotechnical Engineering,Reactor Sys & Procedures & Test Review Branch Questions
ML20065S749
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/28/1982
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065S750 List:
References
NUDOCS 8211020003
Download: ML20065S749 (4)


Text

The Light Company n-i-ugwngu-im-noo n-i

.meii aimumn October 28, 1982 ST-HL-AE-898 File Number: G9.2 SFN: V-0100 Mr. Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Comission Washington, D.C.

20555

Dear Mr. Denton:

South Texas Project Units 1 & 2 Docket Nos. STN-50-498, STN 50-499 Final Safety Analysis Report Amendnent 26 Please find, under separate cover, sixty copies of Anendment 26 to the South Texas Project Units 1 & 2 Final Safety Analysis Report (FSAR).

A copy of this transnittal is attached to each anendnent copy.

Anendnent 26 revises the FSAR to incorporate the following:

1.

Responses to NRC Hydrological and Geotechnical Engineering Branch questions and corresponding changes to FSAR Sections 2.4, 2.5 and 3.8; 2.

Responses to NRC Reactor Systens Branch questions and corresponding changes to FSAR Chapters 6 and 15; 3.

Responses to NRC Procedures and Test Review Branch questions and corresponding changes to FSAR Chapter 14; 4.

Revisions to previously submitted responses to various NRC questions; and 5.

Miscellaneous FSAR text revisions and editorial changes.

Very truly yours, Oj O

O

/ a se.s, l hD J. H. Goldberg Vice President i

Nuclear Engineering & Construction i

i MAM/ng Attachment 8211020003 821028 PDR ADOCK 05000498 K

PDR

l l

Houston Lighting & Power Company cc:

G. W. Oprea, Jr.

October 28, 1982 J. H. Goldberg ST-HL-AE-898 J. G. Dewease File Number: G9.2 J. D. Parsons Page 2 D. G. Barker M. R. Wisenburg R. A. Frazar J. U. Willians R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)

D. E. Sells (NRC)

W.11. Hill, Jr.

(NRC) fl. D. Schwarz (Baker & Botts)

R. Gordon Gooch (Baker & Botts)

(Lowenstein, flewman, Reis, & Axelrad)

J. R. Newman STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Conmission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Conpany Chairman, Atonic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Conmission Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L. Peterson/G. Pokorny Dr. Janes C. Lanb, III 313 Woodhaven Road City of Austin P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawn ace Livermore Laboratory P. 0. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire Willian S. Jordan, III Assistant Attorney General Harnon & Weiss for the State of Texas 1725 I Street,it. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 Citizens for Equitable Utilities, Inc.

Lanny Sinkin Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Revision Date 10-18-82

Before the United States Nuclear Regulatory Commission Docket Nos. STN 50-498, STN 50-499 Houston Lighting & Power Company, et. al.

South Texas Project Units 1 & 2 Amendment 26 Houston Lighting & Power Company, an applicant in the above captioned proceeding, for itself and for the City of San Antonio, Central Power and Light Company and the City of Austin, hereby files Amendment 26 to the Final Safety Analysis Report.

Amendment 26 revises the Final Safety Analysis Report to include the following:

1.

Responses to NRC Hydrological and Geotechnical Engineering Branch questions and corresponding changes to FSAR Sections 2.4, 2.5 and 3.8; 2.

Responses to NRC Reactor Systems Branch questions and corresponding changes to FSAR Chapters 6 and 15; 3.

Responses to NRC Procedures and Test Review Branch questions and corresponding changes to FSAR Chapter 14; 4.

Revisions to p.eviously submitted responses to various NRC questions; and 5.

iiiscellaneous FSAR text revisions and editorial changes.

Respectfully submitted, HOUSTON LIGHTING & POWER COMPANY g

J. H. Goldberg v

Vice President Nuclear Engineering & Construction l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter S

S Houston Lighting & Power S

Docket Nos. 50-498 Company, et al.,

S 50-499 S

South Texas Project S

Units 1 and 2 S

AFFIDAVIT J. H. Goldberg being duly sworn, hereby deposes and says that he is Vice President Nuclear Engineering & Construction of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regula-tory Comission the attached Amendment 26 to the STP FSAR; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.

Y.

A

'J. H. Goldberg N

Vice President Nuclear Engineering & Construction STATE OF TEXAS S

S COUNTY OF HARRIS S S$ ribed and sworn to before me, a Notary Public in and for Harris County 28 5 day of O*b

, 1982.

A i ~.,\\

+,;

3 m.y k m,,g.\\ '. M f h

Notary Public in Wnd pr the A

State of Texas p#

i 0F My comis f8H"d ires:

BEVERLY J. FITE Notary Public, State of Texas My Commission Expires ##I d,/ 94