f"" %
ig()h S UNITED STATES NUCLEAR REGULATORY COMMISSION
%, v,/
WASHINGTON, D.C. 20555-0001 HOUSTON LIGHTING & POWER COMPANY LITY PUBLIC SERVICE BOARD OF SAN ANTONIO CENTRAL POWER AND LIGHT COMPANY CITY OF AUSTIN. TEXAS DOCKET.NO. 50-498 SOUTH TEXAS PROJECT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. NPF-76 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Houston Lighting & Power Company *
(HL&P) acting on behalf of itself and for the City Public Service Board of San Antonio (CPS), Central Power and Light Company (CPL),
and City of Austin, Texas (C0A) (the licensees) dated March 14, 1994, complies with the standards and requirements of the Atomic Energy.Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- Houston Lighting & Power Company is authorized to act for the City Public Service Board of San Antonio, Central Power and Light Company and City of Austin, Texas and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
9405160090 940429 DR ADOCK 0500 B
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-76 is hereby amended to read as follows:
2.
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.
60, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance to be implemented within 31 days of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 91 C.744 Suzanne
. Black, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 29,1994
- ouqA
.y 2
S UNITED STATES i
NUCLEAR REGULATORY COMMISSION e"
WASHINGTON, D.C. 20555-0001 j
HOUSTON LIGHTING & POWER COMPANY CITY PUBLIC SERVICE BOARD OF SAN ANTONIO gl{ TRAL POWER AND LIGHT COMPANY CITY OF AUSTIN. TEXAS DOCKET NO. 50-499 SOUTH TEXAS PROJECT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 49 License No. NPF-80 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Houston Lighting & Power Company *
(HL&P) acting on behalf of itself and for the City Public Service Board of San Antonio (CPS), Central Power and Light Company (CPL),
and City of Austin, Texas (C0A) (the licensees) dated March 14, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- Houston Lighting & Power Company is authorized to act for the City Public Service Board of San Antonio, Central Power and Light Company and City of Austin, Texas and has exclusive responsibility and control over '.he physical construction, operation and maintenance of the facility.
s
, 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-80 is hereby amended to read as follows:
2.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.
49, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance to be implemented within 31 days of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION S
"3&cr Suzanne
. Black, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 29, 1994 f
-g-
,l t
ATTACHMENT TO LICENSE AMENDMENT NOS. 60 AND 49 FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 DOCKET NOS. 50-498 AND 50-499 Replace the following pages of the Appendix A Technical Specifications with the attached pages.
The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
REMOVE INSERT 3/4 0-2 3/4 0-2 B 3/4 0-4 8 3/4 0-4 8 3/4 0-4a r
+ -,
l 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding specifications is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.
3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals.
If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be initiated to place the unit in a MODE in which the specification does not apply by placing it, as applicable, in:
i a.
At least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and c.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION requirements, the action may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual specifications.
This specification is not applicable in MODE 5 or 6.
3.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made when the conditions for the Limiting Condition for Operation are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval.
Entry into an OPERATIONAL MODE or specified condition may be made in accordance with ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time.
This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
Exceptions to these requirements are stated in the individual specifications.
SOUTH TEXAS - UNITS 1 & 2 3/4 0-1
.. ~. -
f 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION (Continued) 3.0.5 Limiting Conditions for Operation including the associated ACTION requirements shall apply to each unit individually unless otherwise indicated as follows:
a.
Whenever the Limiting Conditions for Operation refers to systems or components which are shared by both units, the ACTION requirements will apply. to both units simultaneously, b.
Whenever the Limiting Conditions for Operation applies to only one unit, this will be identified in the APPLICABILITY section of the specification; and c.
Whenever certain portions of a specification contain operating parameters, Setpoints, etc., which are different for each unit, this will be identified in parentheses, footnotes or body of the requirement.
3.0.6 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to
. l' service under administrative control to perform the testing required to demonstrate OPERABILITY.
l l
l l
SOUTH TEXAS - UNITS 1 & 2 3/4 0-2 Unit 1 - Amendment No. 4, 60 Unit 2 - Amendment No. 49 r
e<
, --,.~
3.4.0 APPLICABILITY BASES (Continued)
The time limits of Specification 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the plant to be in the COLD SHUTDOWN MODE when a shutdown is required during the POWER MODE of operation.
If the plant is in a lower MODE of operation when a shutdown is required, the time limit for reaching the next lower MODE of operation ap-j plies.
t However, if a lower MODE of operation is reached in less time than allowed, the total allowable time to reach COLD SHUTDOWN, or other applicable MODE, is not reduced.
For example, if HOT STANDBY is reached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the time allowed to reach HOT SHUTDOWN is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> because the total time to reach HOT SHUTDOWN is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />.
Therefore, if remedial measures are completed that would permit a return to POWER operation, a penalty is not incurred by having to reach a lower MODE of operation in less than the total time allowed.
The same principle applies with regard to the allowable outage time limits of the ACTION requirements, if compliance with the ACTION requirements for one specification results in entry into a MODE or condition of operation for another specification in which the requirements of the Li.miting Condition for Operation are not met.
If the new specification becomes applicable in less time than specified, the difference may be added to the allowable outage time limits of the second specification.
However, the allowable outage time limits of ACTION requirements for a higher MODE of operation may not be used to extend the allowable outage time that is applicable when a Limiting Condition for Operation is not met in a lower MODE of operation.
The shutdown requirements of Specification 3.0.3 do not apply in MODES 5 and 6, because the ACTION requirements of individual specifications define the remedial measures to be taken.
Specification 3.0.4 establishes limitations on MODE changes when a Limiting Condition for Operation is not met.
It precludes placing the facility in a higher MODE of operation when the requirements for a Limiting Condition for Operation are not met and continued noncompliance to these conditions would result in a shutdown to comply with the ACTION requirements if a change in MODES were permitted.
The purpose of this specification is to ensure that facility operation is not initiated or that higher MODES of operation are not entered when corrective action is being taken to obtain compliance with a specification by restoring equipment to OPERABLE status or parameters to specified limits.
Compliance with ACTION requirements that permit continued operation of the facility for an unlimited period of time provides an accept-able level of safety for continued operation without regard to the status of the plant before or after a MODE change.
Therefore, in this case, entry into an OPERATIONAL MODE or other specified condition may be made in accordance with the provisions of the ACTION requirements.
The provisions of this specification should not, however, be interpreted as endorsing the failure to exercise good practice in restoring systems or components to OPERABLE status before plant startup.
l SOUTH TEXAS - UNITS 1 & 2 B 3/4 0-3
r s
3/4.0 APPLICABILITY BASES (Continued)
When a shutdown is required to comply with ACTION requirements, the provisions of Specification 3.0.4 do not apply because they would delay placing the facility in a lower MODE of operation.
Specification 3.0.5 delineates the applicability of each specification to Unit 1 and Unit 2 operation.
Specification 3.0,6 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action (s)) to allow the performance of surveillance requirements to demonstrate:
a.
The OPERABILITY of the equipment being returned to service; or b.
The OPERABILITY of other equipment.
The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed surveillance requirements.
This Specification does not provide time to perform any other preventive or corrective maintenance.
An example of demonstrating the OPERABILITY of the equipment being returned to I
service is reopening a containment isolation valve'that has been closed to comply with Required Actions and must be reopened to perform the surveillance l
requirements.
An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent the j
trip function from occurring during the performance of a surveillance requirement on another channel in the other trip system.
A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of a surveillance requirement on another channel in the same trip system.
Specifications 4.0.1 throuch 4.0.6 establish the general requirements applicable to Surveillance Requirements.
These requirements are based on the Surveillance Requirements stated in the Code of Federal Regulations, 10 CFR 50.36(c)(3):
Surveillance requirements are requirements relating to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."
SOUTH TEXAS - UNITS 1 & 2 B 3/4 0-4 Unit 1 - Amendment No. bM,60 Unit 2 - Amendment No. H,49 r
m
3/4.0 APPLICABILITY BASES (Continued)
Specification 4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL MODES or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in a MODE or other specified condition for which the associated Limiting Conditions for Operation are applicable.
Surveillance Requirements do not have to be performed when the facility is in an OPERATIONAL MODE for which the requirements of the associated Limiting Condition for Operation do not apply unless otherwise specified. The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a specification.
Specification 4.0.2 establishes the limit for which the specified time interval for Surveillance Requirements may be extended.
It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities.
It also provides flexibility to accommodate the length of a fuel cycle for surveillances performed at each refueling outage and are specified with a 18-month surveillance interval It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances not performed during refueling outages.
The limitation of Specification 4.0.2 is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is verification of conformance with the Surveillance Requirements.
This provision is sufficient to ensure that reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
Specification 4.0.3 establishes the failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by the provisions of Specification 4.0.2, as a condition that constitutes a failure to meet the SOUTH TEXAS - UNITS 1 & 2 B 3/4 0-4a Unit 1 - Amendment No.60 l
Unit 2 - Amendment No. 49