Monthly Operating Repts for Nov 1990 for Beaver Valley Station,Units 1 & 2
ML20065Q267
Person / Time
Site: Beaver Valley
Issue date: 11/30/1990
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9012170074
Download: ML20065Q267 (9)


Text

...

")y g

"7 %

4 Telephone ( 412) 30M000

- Nucieat Group P O Box 4 -

$heppingport. PA 15077 6 D = har 7, 1990 N

Beaver Valley Power Station

. Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratirn Reoort

+

U. S. Nuclear Regulatory Cmmission Document Cbntrol Desk Washington, D.C.

20555 Gentlemen:-

-In accordance with Appendix A,

Technical Specifications, -the Monthly

_Operatiry _ Report -is subnitted for Unit 1 and Unit 2 'for the month of November, 1990.-

Very truly yours,

/. D. Sieber

' ice President Nuclear Group

-MAW /mng Enclosures cc: NRC Regional Office King of Prussia, PA 1

'I 9012170074 901130

/ b< }t j,

PDR ADOCK 05000334 l

R PDR

1. a v v v ts

I II II 1111 E11 Docket me.

50-336 UWlf SEUTDOWes AND *OVEt REDUCTIONS Unit 4 4.

  • BVr5 Unit #1-L+

Decr%er T.

1770...

REPORT patin WOVEFEER 1999 Telepheae

__m.A. wtas*r Completed By (4121 393-7621 Cause & Corrective Nethod of Licensee Duration Shutting Event System Component Action to No.

Date Typet (Nours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent RecurreM e 20sE l

l l

l 1

4 3

1 2

Exhibit G-tastructions for Method:

F-Forced Reason:

Preparation ef Data Entry Sheets S-Scheduled A-Equipment Faiture (Emptain) 1 - M a rruel for Licensee Event Report (LER) File 2-Panval Screw 8-Maintenance or Test (uuaEs' $1).

3-Automatic Scree C-Refueling

&-Cont *#. free Previous Month D-Regulatory Restriction 5-Reduction 5

E-Operator Training & License Emme Exhibit I-Seee Source.

9-Other F-Administrative G-operational Error (Emplain)

N-Other (Emplain)

10JURTIVE SGtVJtY OT lOffDLY OPUWTDG D:PIRIDiCE QUI ICVIMBD1 1990 licycunber 1 The Unit orcrated at a ranimi value of 100% cutput.

thrw gh 11ovember 30

AVERicE (AILY LNIT PG J LEVEL D3cket 110.

50-334 Unit LWPS Unit 1 Date Dgomier 7, 1990 Ompleted bf M. A. Wimer "blephone f 412)393-7621 lotm{ })M IMBER-1990 DAY AVERAGE IAILY P0h'ER LLVIL IRY AVERIGE CAILY I%'ER LINEL (INo-lict)

(Mvio-liet) 1 808 17 817 2

813 18 821 3

800 19 817 4

804 20 813 b

808 21 817 6

808 22 808 7

821 23 808 8

813 24 817 9

813 25 821 10 817 26 808 11 813 27 806 12 817 28 803 13 813 29 827 14 821 30

_._825 15 808 16 804 DISITUXTIOtiS On this formt, list the average daily unit power level in MWe-liet for each day in the reporting month. Corpute to the nearest Wole nogawatt.

I

i e

OPERATING DATA REPORT DOCKET NO :

50 334 REPORT DATE:

11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTINC PERIOD: NOVEMBER 1990
3. LICENSED YHERMAL POWER (MWt):

2652

4. NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net Me):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810 l

8.-IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:

9. POWER LEVEL TO WICil RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMU1ATIVE 11.-Il0VR$ IN REPORTING PERIOD:

720.0 8016.0 127848.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

720.0 7466.1 79604.6

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482,8 14.-HOURS GENERATOR WAS ON LINE:

720.0 7406.5 77874.0

15. UNIT RESERVE SHUTDOWN 110URS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY CEN. (MWH):

1899189.0 18771190.0 184851245.5

'17. CROSS ELECT. ENERCY GEN. (MWH):

618400.0 6100810.0 59370499.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

585230.0 5736600.0 55433750.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 92.4 63.1
20. UNIT AVA11 ABILITY FACTOR:(PERCENT) 100.0 92.4 63.1
21. UNIT CAPACITY FACTOR (MDC): PCT.

100.3 Bd.4 56.5

22. UNIT CAPACITY FACTOR (DER): PCT 97.3 85.7 54.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.6 16.4
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MnNTHS (TYPE,DATE AND DURATION OF EACH):

' E UNIT IS SCHEDULFD TO SHUTDOWN FOR 4HE UNIT'S 8TH REFUELING OUTAGE ON APRIL l'.1960.

THE UNIT IS SCHEDULFD TO BE SHUTDOWN FOR 10 VEEKS.

2

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

L FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

,~.p-e

._-e--.-

y,,--,-

y--

-r

-w w,

INT sot %RY OF

}OmILY OPDWTD33 DTDUDJCE U!UT II IU/DiBD1 1990 lloventer 1 to Unit remined in Itde 5 through November 11 11ovember 12 At 1102 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.19311e-4 months <br /> the Unit entered Itde 4.

Iloventer 13 to Unit remained in }tde 4.

14cvember 14 At 0112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> the unit entered Itdo 3.

November 15 he Unit remaincd in Made 3 through 11ovember 17 November 18 At 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> the Unit retumed to Itde 4 to repair the Steam Driven Auxiliary roadwater Punp. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the unit entered Itdo 3.

November 19 We unit remained in Made 3.

November 20 At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> the unit entertd itdo 2 at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br /> the Reactor was taken critical.

llovember 21 he unit remained in Mode 2.

11ovember 22 At 0146 hours0.00169 days <br />0.0406 hours <br />2.414021e-4 weeks <br />5.5553e-5 months <br /> the unit was synchronized. At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the unit was renoved frm, service to permit Turbine Overspood Trip hstirg.

At 2121 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.070405e-4 months <br /> the unit was synchronized and output was escalated at 3% per hour.

November 23 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the power escalation was haltcd at approximately 30% output to permit oore flux mapping.

November 24 At 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> the power escalation was resumod.

November 25 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> the power escalation was halted at approximately 75% output to permit oore flux mapping.

November 26 W e unit operated at 75% output to permit oore flux mam irq.

November 27 At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the power escalation was resumcd. At 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> the power escalation was halted at 90% output to permit oore flux mappirg. At 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> the unit's output was escalated to 100%.

November 28 Se unit operated at 100% output, thrcogh November 30

AVERICE CAILY (MIT PCMIR 11 VEL Dx:ket No.

50-412 Unit BVPS Unit 2 Date Dgcamber 7,1990 Orpleted by M. A. Wimer h iephone (412) 393-7621 totml icVEMBIR 1990 IAY AVERAGE DAILY POWIR LEVEL IAY AVERICE DAILY PCWER LEVEL (IWe-Net)

(IUe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 34 7

0 23 151 8

0 24 212 9

0 25

,_ 494 10 0

26 607 11 0

27 671 12 0

28 729 13 0

29 817 14 0

30 809 15 0

16 0

INS 1 RUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting toonth. Oxpute to the nearest whole mxfawatt.

J OPERATING DATA REPORT DOCRET NO.:

50 412 REPORT DATE:

12/07/90 COMPLETED BY: M.A.VINCER TELEPHONE:

(412) 393 7621 l

OPERATING STATUS

.d

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: NOVEMBER 1990
3. LICENSED Ti!ERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX, DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

8. IF CilANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF AI.'Y (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 8016.0 26631.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

252.6 6046.5 21603.0

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

204.9 5990.9 21417.8

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

375293.0 12351873.0 51164617.4

17. GROSS ELECT. ENERGY GEN. (MWH):

116500.0 3933900.0 16400000.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

98697.0 3681435.0 15437910.0

19. UNIT SERVICE FACTOR: (PERCENT) 28.5 74.7 80.4 7
20. UNIT AVAILABILITY FACTOR:(PERCENT) 28.5 74.7 80.4
21. UNIT CAPACITY FACTOR'(MDC): PCT 16,7 55.3 69.6
22. UNIT CAPACITY FACTOR (DER): PCT 16,4 54.9 69.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.9 5.4
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMF2CIAL CPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

, _ _. ~,

k UNIT SMUT 00Wes AND POWER REDUCTIONS Docket No.

50-412 Unit Name SVPS Unit #2 Date December T.

1990 Completed 8y M.A.

Winner REPORT MONTN NOVEMSER 1990 Telephone (412) 393-7621 Method of Licensee Cause & Corrective Duration Shutting

. ' Event System Component Action to Co.

Date Typel' (Nours)

Reason 2 Doun Reactor 3 Report 8-Code 4-Code 5 Prevent Recurrence 28 901101 5

505.8 C

4 W/A RC FUELXX Shutdown for second Refueling Outage.

29 901122 5

0 N

5

'N/A RC FUELXX Unit operted at Reduced output for Fuel Preconditioning.

30 901122 S

9.4 3

1 N/A ZZ ZZZZZZ Unit removed from service for Turbine overspeed trip testing.

31 901122 S

0 N

5 W/A RC FUELMX Unit operated at Reduced Detput for Fuet preconditioning.

1 4

11 2

3 4

F-Forced Reason:

Method:

Exhibit G-Instructions for i

S-Scheduled A-Equipment Feiture (Esplein).

1-Manuel Preperation of Date Entry Sheets 8-Meintenance or Test 2-Menuet Scree for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram (hDREG0161).

i D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Exem 5-Reduction 5

F-Adelnistrative 9-Other Exhibit I-Some Source.

G-operationel Error (Emptein)

N-other (Explain)