ML20065Q267
| ML20065Q267 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/30/1990 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9012170074 | |
| Download: ML20065Q267 (9) | |
Text
...
")y g
"7 %
4 Telephone ( 412) 30M000
- Nucieat Group P O Box 4 -
$heppingport. PA 15077 6 D = har 7, 1990 N
Beaver Valley Power Station
. Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratirn Reoort
+
U. S. Nuclear Regulatory Cmmission Document Cbntrol Desk Washington, D.C.
20555 Gentlemen:-
-In accordance with Appendix A,
Technical Specifications, -the Monthly
_Operatiry _ Report -is subnitted for Unit 1 and Unit 2 'for the month of November, 1990.-
- Very truly yours,
/. D. Sieber
' ice President Nuclear Group
-MAW /mng Enclosures cc: NRC Regional Office King of Prussia, PA 1
'I 9012170074 901130
/ b< }t j,
PDR ADOCK 05000334 l
R PDR
- 1. a v v v ts
I II II 1111 E11 Docket me.
50-336 UWlf SEUTDOWes AND *OVEt REDUCTIONS Unit 4 4.
- BVr5 Unit #1-L+
Decr%er T.
1770...
REPORT patin WOVEFEER 1999 Telepheae
__m.A. wtas*r Completed By (4121 393-7621 Cause & Corrective Nethod of Licensee Duration Shutting Event System Component Action to No.
Date Typet (Nours)
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent RecurreM e 20sE l
l l
l 1
4 3
1 2
Exhibit G-tastructions for Method:
F-Forced Reason:
Preparation ef Data Entry Sheets S-Scheduled A-Equipment Faiture (Emptain) 1 - M a rruel for Licensee Event Report (LER) File 2-Panval Screw 8-Maintenance or Test (uuaEs' $1).
3-Automatic Scree C-Refueling
&-Cont *#. free Previous Month D-Regulatory Restriction 5-Reduction 5
E-Operator Training & License Emme Exhibit I-Seee Source.
9-Other F-Administrative G-operational Error (Emplain)
N-Other (Emplain)
10JURTIVE SGtVJtY OT lOffDLY OPUWTDG D:PIRIDiCE QUI ICVIMBD1 1990 licycunber 1 The Unit orcrated at a ranimi value of 100% cutput.
thrw gh 11ovember 30
AVERicE (AILY LNIT PG J LEVEL D3cket 110.
50-334 Unit LWPS Unit 1 Date Dgomier 7, 1990 Ompleted bf M. A. Wimer "blephone f 412)393-7621 lotm{ })M IMBER-1990 DAY AVERAGE IAILY P0h'ER LLVIL IRY AVERIGE CAILY I%'ER LINEL (INo-lict)
(Mvio-liet) 1 808 17 817 2
813 18 821 3
800 19 817 4
804 20 813 b
808 21 817 6
808 22 808 7
821 23 808 8
813 24 817 9
813 25 821 10 817 26 808 11 813 27 806 12 817 28 803 13 813 29 827 14 821 30
_._825 15 808 16 804 DISITUXTIOtiS On this formt, list the average daily unit power level in MWe-liet for each day in the reporting month. Corpute to the nearest Wole nogawatt.
I
i e
OPERATING DATA REPORT DOCKET NO :
50 334 REPORT DATE:
11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTINC PERIOD: NOVEMBER 1990
- 3. LICENSED YHERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net Me):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810 l
8.-IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WICil RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMU1ATIVE 11.-Il0VR$ IN REPORTING PERIOD:
720.0 8016.0 127848.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
720.0 7466.1 79604.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482,8 14.-HOURS GENERATOR WAS ON LINE:
720.0 7406.5 77874.0
- 15. UNIT RESERVE SHUTDOWN 110URS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY CEN. (MWH):
1899189.0 18771190.0 184851245.5
'17. CROSS ELECT. ENERCY GEN. (MWH):
618400.0 6100810.0 59370499.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
585230.0 5736600.0 55433750.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 92.4 63.1
- 20. UNIT AVA11 ABILITY FACTOR:(PERCENT) 100.0 92.4 63.1
100.3 Bd.4 56.5
- 22. UNIT CAPACITY FACTOR (DER): PCT 97.3 85.7 54.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.6 16.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MnNTHS (TYPE,DATE AND DURATION OF EACH):
' E UNIT IS SCHEDULFD TO SHUTDOWN FOR 4HE UNIT'S 8TH REFUELING OUTAGE ON APRIL l'.1960.
THE UNIT IS SCHEDULFD TO BE SHUTDOWN FOR 10 VEEKS.
2
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
L FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
,~.p-e
._-e--.-
y,,--,-
y--
-r
-w w,
INT sot %RY OF
}OmILY OPDWTD33 DTDUDJCE U!UT II IU/DiBD1 1990 lloventer 1 to Unit remined in Itde 5 through November 11 11ovember 12 At 1102 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.19311e-4 months <br /> the Unit entered Itde 4.
Iloventer 13 to Unit remained in }tde 4.
14cvember 14 At 0112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> the unit entered Itdo 3.
November 15 he Unit remaincd in Made 3 through 11ovember 17 November 18 At 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> the Unit retumed to Itde 4 to repair the Steam Driven Auxiliary roadwater Punp. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the unit entered Itdo 3.
November 19 We unit remained in Made 3.
November 20 At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> the unit entertd itdo 2 at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br /> the Reactor was taken critical.
llovember 21 he unit remained in Mode 2.
11ovember 22 At 0146 hours0.00169 days <br />0.0406 hours <br />2.414021e-4 weeks <br />5.5553e-5 months <br /> the unit was synchronized. At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the unit was renoved frm, service to permit Turbine Overspood Trip hstirg.
At 2121 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.070405e-4 months <br /> the unit was synchronized and output was escalated at 3% per hour.
November 23 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the power escalation was haltcd at approximately 30% output to permit oore flux mapping.
November 24 At 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> the power escalation was resumod.
November 25 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> the power escalation was halted at approximately 75% output to permit oore flux mapping.
November 26 W e unit operated at 75% output to permit oore flux mam irq.
November 27 At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the power escalation was resumcd. At 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> the power escalation was halted at 90% output to permit oore flux mappirg. At 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> the unit's output was escalated to 100%.
November 28 Se unit operated at 100% output, thrcogh November 30
AVERICE CAILY (MIT PCMIR 11 VEL Dx:ket No.
50-412 Unit BVPS Unit 2 Date Dgcamber 7,1990 Orpleted by M. A. Wimer h iephone (412) 393-7621 totml icVEMBIR 1990 IAY AVERAGE DAILY POWIR LEVEL IAY AVERICE DAILY PCWER LEVEL (IWe-Net)
(IUe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 34 7
0 23 151 8
0 24 212 9
0 25
,_ 494 10 0
26 607 11 0
27 671 12 0
28 729 13 0
29 817 14 0
30 809 15 0
16 0
INS 1 RUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting toonth. Oxpute to the nearest whole mxfawatt.
J OPERATING DATA REPORT DOCRET NO.:
50 412 REPORT DATE:
12/07/90 COMPLETED BY: M.A.VINCER TELEPHONE:
(412) 393 7621 l
OPERATING STATUS
.d
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: NOVEMBER 1990
- 3. LICENSED Ti!ERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX, DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CilANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF AI.'Y (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 8016.0 26631.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
252.6 6046.5 21603.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
204.9 5990.9 21417.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
375293.0 12351873.0 51164617.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
116500.0 3933900.0 16400000.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
98697.0 3681435.0 15437910.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 28.5 74.7 80.4 7
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 28.5 74.7 80.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 16,4 54.9 69.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.9 5.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMF2CIAL CPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
, _ _. ~,
k UNIT SMUT 00Wes AND POWER REDUCTIONS Docket No.
50-412 Unit Name SVPS Unit #2 Date December T.
1990 Completed 8y M.A.
Winner REPORT MONTN NOVEMSER 1990 Telephone (412) 393-7621 Method of Licensee Cause & Corrective Duration Shutting
. ' Event System Component Action to Co.
Date Typel' (Nours)
Reason 2 Doun Reactor 3 Report 8-Code 4-Code 5 Prevent Recurrence 28 901101 5
505.8 C
4 W/A RC FUELXX Shutdown for second Refueling Outage.
29 901122 5
0 N
5
'N/A RC FUELXX Unit operted at Reduced output for Fuel Preconditioning.
30 901122 S
9.4 3
1 N/A ZZ ZZZZZZ Unit removed from service for Turbine overspeed trip testing.
31 901122 S
0 N
5 W/A RC FUELMX Unit operated at Reduced Detput for Fuet preconditioning.
1 4
11 2
3 4
F-Forced Reason:
Method:
Exhibit G-Instructions for i
S-Scheduled A-Equipment Feiture (Esplein).
1-Manuel Preperation of Date Entry Sheets 8-Meintenance or Test 2-Menuet Scree for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram (hDREG0161).
i D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Exem 5-Reduction 5
F-Adelnistrative 9-Other Exhibit I-Some Source.
G-operationel Error (Emptein)
N-other (Explain)