ML20065P515

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Epp/Ip 1.1 Re notification,1.2 Re Communications & Dissemination of Info & 1.3 Re Turnover Status Checklist
ML20065P515
Person / Time
Site: Beaver Valley
Issue date: 09/14/1982
From: Sieber J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20065P512 List:
References
ND1MSL:1914, NUDOCS 8210260125
Download: ML20065P515 (3)


Text

.

L

~

'Af Telephone (412) 456-6000 Nuclear Division P o. Box 4 Shippingport, PA 15077 6 September 14, 1982 ND1MSL:1914 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Emergency Preparedness Plan Implementing Procedures Gentlemen:

Enclosed are 10 copies of Issue 7, Revision 0 of the Beaver Valley Power Station Emergency Preparedness Plan Implementing Procedures.

Enclosed is one controlled copy (No. 6) and nine additional copies. These documents are provided pursuant to Appendix E Section V of 10CFR 50.

The " Manual Transmittal" form provides directions for documentation of receipt of your copy.

We have forwarded a copy to the resident NRC inspector, Mr. William Troskoski.

The procedures have been revised to facilitate incorporation of the numerous changes and additions as a result of previous drills and the annual review and update of the EPP/IP.

Very tru " yours, A

J. D. Sieber, Manager Nuclear Safety & Licensing Attachment Yo6 5

g V

/ /D G210260125 821008 PDR ADOCK 05000334 F

PDR

Y Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Emergency Preparedness Plan Implementing Procedures j

Page Two cc:

Mr. William Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 4

i U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 I

i

)

4 t

3

.=w

---,2 4

EP?/IP

[

ANNH I Annox - I i

,DUQUESNI I.IGHT CCMPANT

(-

3.avar Vallsy Power Station sd Page.

.1 of 1 E:nergency Preparedness Plan Records Transmittal for Controlled Copies of EPP Date 9 / 14

/ 82 Section(s)

Issue or Number Transfer or Revision Record of Title Annexes Nunber Date Pages Recient EPP-Innle.entinn Procedure I

IIssue7.Rev.019-l7-82l l

1 1

All (IP's-)

l I

I I

I I

I I

I l

l l

l l

l-1 I

I l

I I

I I

I l

l i

I I

I I

I I

I i

3 l

l I

I I

.l.

I l

l l

l l

l l

-(A - records-.transmitred (M - records received i

i I verify that the records transmit:ed art is agreement with this transmit a1 docu=ene, an'd.are-ir. scod condition._.

.. ~

MMMMns O $10 Y

/

/

(~/erson Trangnitting Records)

(Date)

J I verify that the records received are in agreement with,chis transmittal document,


and are-i= good. condition.

~

/

/

(Recipient)

(Data)

This form is to be returned to the 3VPS office to be filed in the Records Roon.

/

/

(Filed 3 ),

(Date) 7 SD O

_c_%..

-.