ML20065P507

From kanterella
Jump to navigation Jump to search
Amend 53 to License NPF-47,modifying TS 6.5.2.1 Re Technical Review & Control
ML20065P507
Person / Time
Site: River Bend 
(NPF-47-A-053, NPF-47-A-53)
Issue date: 12/06/1990
From: Imbro E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20065P511 List:
References
NUDOCS 9012130328
Download: ML20065P507 (5)


Text

_.

  1. pict

/

\\'e-UNITED STATES 1

p NUCLEAR REGULATORY COMMISSION h~*

I W AsHINoYON, D, C. 20f46 f:

O

%,,*.w..*/

GULF STATES UTILITIES COMPANY i

L DOCKET NO. 50-458 RIVER BEND STATION UNIT-1 e

AMENDMENT TO FACILITY OPERATING LICENSE i

n, Amendment No. 53 License No. NPF-47 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Gulf States Utilities Company

=(the licensee) dated September 28, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission rules and regulations set forth in 10 CFR Chapter I; B.

The' facility will operate in confor',ity with the application, as amended, the provisions of the Act, and the rules and regulations y

of the Commission; C.-

There is reasonable assurance:

(1) that the activities authorized by this amendment can be conducted without endangering the health and safety.of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

.The issuance of this license amendment will not be inimical to the-L common defense and security or to the health and safety of the public; and E.

'The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9012130328 901206

{DR ADOCK 05000458 PDC

--.e

.....m

~.,

...~..,,.__,.m..%,__,,__,_,,m,r-.-,..-

-,.-_.,_.,...,--,,.6_..,+,

1 1

+

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of facility Operating License No. NPF-47 is-hereby i

amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 53 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

GSU shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.-

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

?

cEugene. Imbro, Abting Director Project Directorate IV-2 Divisionof-ReactorProjectsIII/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications c

Date.of Issuance:

December 6. 1990

'l

(

E'--

f -I '

l-j.

l l!

m,

~~,_,. _. -,... _..... - - _. -.. -. _.. -.., - - - - -

.. ~. -

3 ATTACNMENT TO LICENSE AMENDMENT NO. 53 4

FACILITY OPERATING LICENSE NO. NPF-47 00CKET NO. 50-458 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

The overleaf page is provided to maintain document completeness.

REMOVE INSERT 6-9 6-9 l

i I.

i l

4

'1

  • ADMINISTRATIVE CONTROLS i

l RECORDS

6. 5.1. 8 The FRC shall maintain written minutes of each FRC meeting that, at a minimum, document the results of all FRC activities performed under the respon-sibility provisions of these Technical Specifications.

Copies shall be provided to the Plant Manager and the NRB.

6.5.2 TECHNICAL REVIEW AND CONTROL 6.5.2.1 Each procedure and program required by Specification 6.8 and other pro-cedures that affect nuclear safety, and changes thereto, is prepared by a quali-o fied individual / organization.

Each such procedure, and changes thereto, shall be reviewed by an individual / group other than the individual / group that pre-pared the procedure, or changes thereto, but who may be from the same organiza-tion as the individual / group that prepared the procedure.

Each such procedure and program, or changes thereto, shall be approved, prior to implementation, by l

t the Plant Manager, one of the Assistant Plant Managers or the Director -

Radiological Programs, or by the manager / department head responsible for the program or the activity described in the procedure, with the exception of the Emergency Plan and implementing procedures which shall be approved by

-the Manager - Administration, Plant Manager and Senior Vice President - RBNG.

6.5.2.2 Individuals responsible for reviews performed in accordance with Sec-tion 6.5.2.1 shall be members of River Bend Nuclear Group supervisory staff, and-the reviews shall be performed in accordance with administrative procedures.

Each such review shall include a determination of whether or not additional, cross-disciplinary review is necessary and a verification that the proposed actions do not constitute an unreviewed safety question.

If deemed necessary, such review shall be performed by the appropriate Cesignated review personnel.

6.5.2.3 The station security program and implem0nting procedures shall be reviewed at least once per 12 months, and recommeriied changes approved in ac-cordance with Specification 6.5.2.1.

6.5.2.4 The station emergency plan and implementing procedures and recommended changes shall-be approved in accordance with Specifica\\ ion 6.5.2.1.

6. 5i2. 5 The station fire protection 91an and implementing procedures shall be reviewed at.least once per 12 montis, and recommended changes _ approved in accordan.e with Specification 6.5.2.1 6.5.2.6 Records documenting each of tae activities performed under Specifica-tions 6.5.2.1 through 6.5.2.5 shall lie aaintained.

6.5.3 -NUCLEAR REVIEW BOARD (NRB)

FUNCTION 6.5.3.1 The NRB shall function to provide independent review and audit of designated activities in the areas of:

RIVER BEND - UNIT 1 6-9 Amendment No. Z7, 53

.... _. _ _,. _ _. ~. _. _ _ _ _ _ - - _. - _.. _. _. -. _ _ _. _,. _.,

I t

ADMINISTRATIVE CONTROLS

+

~

FUNCTION (Continued) a.

. Nuclear power plant operations, b.

Nuclear engineering, c.

Chemistry and radiochemistry, d.

Metallurgy,.

e.

Instrumentation and control,

.f.

Radiological safety, i

g.

Mec.hanical and electrical engineering, h.

Quality assurance practices, 1.

Licensing and regulatory affairs, j.

Training.

The NRB shall report to and advise the Senior Vice President - RBNG on those areas of responsibility in Specifications 6.5.3.7 and 6.5.3.8.

COMPOSITION 6.5.3.2 The NRB shall be composed of the:

Chairman:-

Manager-River Bend Oversight Member and Vice Manager-Quality Assurance

. Chairman Member:

Manager-Administration Member:

Manager-Design Engineering, l

Technical Services Department Member:

Manager-Engineering Member:

Plant Manager

+

Slember:

Assistant Plant Manager-Operations and Radwaste Member:

Director-Design Engineering Member:

Director-Nuclear Licensing Member' Outage Manager Member:

Director-Joint Ownership Participation Member:

Director-Plant Oversight -

ALTERNATES 6.5.3.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting' members in NRB activities at any one time.

CONSULTANTS 6.5.3.4 Consultants shall be utilized as determined by the NRB Chairman to

.i provide expert advice to the NRB.

-t 4

RIVER BEND - UNIT 1 6-10 Amendment No. 17

... -