ML20065N401
| ML20065N401 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 04/18/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065N404 | List: |
| References | |
| NUDOCS 9404270145 | |
| Download: ML20065N401 (3) | |
Text
.
statior Suppstt DIpsrtm:nt g
==_.
'=x=-l
~7 PECO ENERGY
==;t=lL_
965 Ches1ertirook Boulevard Wayne, PA 19087M91 April 18,1994 Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Subject:
Umorick Generating Station, Units 1 and 2 Technical Specifications Change Requests 92-10-0 and 92-11-0 Revised Technical Specifications Pages Gentlemen:
By letters dated '.pril 19,1993, and May 6,1993, PECO Energy Company submitted Technical Specifications Change Request (TSCR) Nos. 9210-0 and 92-11-0, respectively, for Umerick Generating Station (LGS), Units 1 and 2, requesting changes to the LGS TS to extend the surveillance intervals and allowed outage times for contalnment isolation actuation instrumentation and other salected actuation instrumentation. The NRC is currently reviewing these proposed Technicai.:pecifications (TS) changes, and has requested that we resubmit several TS pages previously submitted in TSCR Nos. 92-10-0 and 92-11-0 to incorporate changes resulting from recently issued TS amendments and to correct several typographical errors.
Therefore, we are resubmitting the following TS pages for TSCR Nos. 92-10-0 and 92-11-0 (Attachments 1 and 2, respectively) which have been revised to incorporate information from recently issued TS amendments and to correct typographical errors. This information is being submitted under affirmation, and the required affidavit is enclosed.
_ Attachment 2 TSCR No,92-104 TSCR No. 92-11-0 Unit 1 M0.lL2 Unit 1 Unit 2 3/4 3-57 3/4 3-57 xvill xix 3/4 3-59 B 3/4 3-2 B 3/4 3-2 3/4 3-115 3/4 3-115 B 3/4 3-3 B 3/4 3 3 3/44-7 3/447 3/4 6-14 3/4 6-14 B 3/4 3-3 B 3/4 3-3 B 3/4 3-4 83/43-4 83/43-5 B 3/4 3-5 B 3/4 3-6 83/43-6 B 3/4 3-7 B 3/4 3-7 9404270145 940418
%{
l gDR ADOCK 05000352 PDR
f
)
e i.,
P ge 2 If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, 0l, 1.
G. A. Hunger, Jr.
Director Licensing Section Enclosure Attachments cc:
T. T. Martin, Administrator, Region I, USNRC (w/ enclosure, attachments)
N. S. Perry, USNRC Senior Resklent inspector, LGS (w/ enclosure, attachments)
W. P. Dornsife, Director, PA Bureau of Radiation Protection (w/ enclosure, attachments)
t s.
l
' COMMONWEALTH OF PENNSYLVANIA ss.
COUNTY OF CHESTER W. H. Smith, Ill, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that its has read the corrected Information for Technical Specifications Change Request Nos. 92-10-0 and 92-11-0 for Umerick Generating Station Units 1 and 2, Facility Operating Ucense Nos. NPF-39 and NPF45, to extend the surveillance Intervals and allowed outage times for containment actuation instrumentation and other selected actuation instrumentation, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
Vics esident Subscribed and sworn to before me this/b day of 1994.
A. A x5 c9"'
Notary Public q
thytalSeal FJta A Santori. Notary PitAc
)
T%ffrinTwp.Ctmter Cwnty MyComnwmn EmmsJJty 10.1995 l