Letter Sequence Other |
|---|
|
Results
Other: ML17268A104, ML19347F660, ML20003B230, ML20010G846, ML20010G862, ML20032A736, ML20063F261, ML20065N032, ML20067D230, ML20079Q273, ML20079Q282, ML20133E265
|
MONTHYEARML19257A5131979-12-28028 December 1979 Forwards Addl Response to ,Per Joint Nrc/B&W Owners Group 790913 Meeting.Addresses Noncondensible Gas Discussion & Small Break & Power Operated Relief Valve stuck-open Discussion Project stage: Meeting ML20003B2301981-01-30030 January 1981 Informs That Certain Mods Will Be Made to Existing Small Break LOCA Model,In Response to NRC .Revised Model Documentation Will Be Provided by 820301 Project stage: Other ML20003B6721981-02-16016 February 1981 Submits Addl Comments on NUREG-0737,Items II.B.2 & II.K.3.30.Design Review Completed Re Plant Shielding for Spaces Outside Containment That May Be Used in post-accident Operations Project stage: Request ML19347F6601981-05-19019 May 1981 Responds to RW Reid Re Small Break LOCA Model to Predict Small Break Behavior.Discusses L3-1 & S-07-10D Test Prediction Comparisons.Earlier Pretest Predictions Being Reviewed & Results to Be Submitted by 810615 Project stage: Other ML17268A1041981-05-31031 May 1981 B&W Post-Test Evaluation of Loft Test L3-1 Project stage: Other ML20010G8621981-06-0909 June 1981 B&W Post-Test Analysis for Semiscale Test S-07-10D Project stage: Other ML20010G8461981-09-15015 September 1981 Forwards B&W Post-Test Analysis for Semiscale Test S-07-10D & B&W Post-Test Evaluation of Loft Test L3-1, in Response to NRC Re Small Break LOCA Model to Predict Small Break Behavior Project stage: Other ML20032A7361981-10-23023 October 1981 Requests That Buchholz to Eisenhut Be Added to Facility Dockets as Final Response to NUREG-0737,Item II.K.3.30 Re Small Break LOCA Project stage: Other ML20052A0611982-03-25025 March 1982 Summarizes NRC Views Resulting from 811217 Meeting W/B&W Owners Group Re Small Break LOCA Analysis Model & Provides Addl Info for Planning Verification Program. Model Verification Endorsed Project stage: Meeting ML20062M1431982-08-13013 August 1982 Responds to Requesting Schedule for Submittal of Supplemental ECCS Calculations Using Cladding Models of NUREG-0630.Calculations Will Be Submitted by 830301 Project stage: Supplement ML20063F2611982-08-25025 August 1982 Discusses Program for Resolution of NUREG-0737,Item II.K.3.30, Revised Small Break LOCA Methods to Show Compliance w/10CFR50,App K. B&W Will Forward Description of Gerda Test Program Project stage: Other ML20065A8891982-09-0909 September 1982 Submits Details of Cooperative Evaluation Program,Requested at 820720 Meeting Re NUREG-0737,Item II.K.3.30, Revised Small Break LOCA Methods to Show Compliance w/10CFR50,App K. Program Will Lead to Development of Research Priorities Project stage: Meeting ML20065N0321982-10-19019 October 1982 Responds to Requesting Implementation Schedule for Mods to ECCS Evaluation Models.Mods Will Be Undertaken as Extension of NUREG-0737,Item II.K.3.31.Schedule Will Be Provided 60 Days After NRC Approval of Item II.K.3.30 Project stage: Other ML20067D2301982-12-0707 December 1982 Endorses B&W Topical Repts BAW-10154P, B&W Small Break LOCA ECCS Evaluation Model & BAW-10092P,Revision 3, CRAFT-2, in Effort to Complete Small Break LOCA Methods Program Response to NUREG-0737,Item II.K.3.30 Project stage: Other ML20023B8711983-04-0505 April 1983 Public Version of Temporary Mod Request T-7104 to Emergency Plan Implementing Procedure Ei 1300.07, Technical Support Ctr Activation. Rev 27 to Index Encl Project stage: Request ML20079Q2821983-05-0606 May 1983 Bounding Analytical Assessment of NUREG-0630 on LOCA & Operating Kw/Ft Limits Project stage: Other ML20079Q2731983-05-0606 May 1983 Forwards Bounding Analytical Assessment of NUREG-0630 on LOCA & Operating Kw/Ft Limits, Per Project stage: Other ML20133E2651985-07-0303 July 1985 Topical Rept Evaluation of BAW-10092P,Rev 3 & BAW-10154 Re Small Break LOCA Evaluation Model CRAFT2 (Rev 3).CRAFT2 in Compliance W/Evaluation Criteria of 10CFR50,App K Project stage: Other 1982-10-19
[Table View] |
Text
TOLEDO
%su EDISON Rowo P. Cnoust Docket No. 50-346 gse v
License No. NPF-3
- SP S 22 Serial No. 867 October 19, 1982 Mr. T. M. Novak, Assistant Director for Operating Reactors Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Novak:
This is in response to your letter dated July 13, 1982 (Log No. 1029) relating to modifications to ECCS evaluation models as a result of the resolution of NUREG-0630 issues as pertaining to the Davis-Besse Nuclear Power Station, Unit 1.
Your letter requested an implementation schedule for these modifications to the ECCS evaluation models. As you are aware, activities for NUREG-0737, Item II.K.3.30 (Revisions to'Small Break LOCA Methods to Show Compliance with 100FR50, Appendix K) are currently pro-gressing. Following the completion and NRC approval of Item II.K.3.30, an implementation schedule for NUREG-0737, Item II.K.3.31 (Plant Specific Calculations to Show Compliance with 10CFR Part 50.46) will be developed.
The permanent modifications to the ECCS evaluation models will be under-taken as an extension of the II.K.3.31 activities. Toledo Edison will provide the implementation. schedule for these modifications 60 days after the NRC approval of II.K.3.30 activities.
Very truly yours, dh b/8 cc:
DB-1 NRC Resident Inspector Ao%
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 B210220013 B21019 PDR ADOCK 05000346 P
PDR