ML20065M960

From kanterella
Jump to navigation Jump to search
Forwards Rev 17 to Callaway Plant Rerp. Rev Result of Annual Review of Plan.Change to EAL 3F, Complete Loss of Any Function Needed for Cold Shutdown, Made in Chapter 4
ML20065M960
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/13/1994
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065M964 List:
References
ULNRC-2996, NUDOCS 9404260290
Download: ML20065M960 (2)


Text

'

E

-- l

- 1901 Choutuu Avenue Post Othw Box 149 St Icuis, Missoun 63166 314-554 2650 Uurou

^Prit 13, 1994

" sc^ "

.ELECTIUC

$$" ^""

s Document Control' Desk Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Mail Stop P1-137 Washington, DC 20555 ULNRC-2996 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT EADIOLOGICAL EMERGENCY RESPONSE PLAN, REV. 17 Enclosed is one copy of Revision 17 of the Callaway Plant Radiological Emergency Response Plan (RERP)..This document was implemented on April 11, 1994, in accordance with Callaway Plant procedures and 10CFR50.54(q).

This revision is the result of our annual review of'the Plan.

In addition to minor editing, Letters of. Agreement were updated,-the Evacuation Time Estimate Study has been revised, the normal plant organization has been removed,'

and changes have.been included to reflect the combined Operations Support Centers (OSCs).

A change to Emergency Action-Level (EAL) 3F, Complete Loss of Any Function Needed for Cold Shutdown, was also made in Chapter 4.

A detailed list.of all other changes is also enclosed.

J Revision 17 of the RERP does not decrease the offectiveness of emergency. preparedness at the Callaway-Plant.

The Plan continues to meet the standards of-10CFR50.47(b) and requirements of 10CFR50.54(q).

Ver truly yours, (m

Donald F. Schnell DFS/AMS/bjp Enclosures 4 D d k, h. ~,.,

, I en,.e g

9404260290 940413-PDR ADOCK 05000483

~

F PDR-1

ULNRC-2996 April 13, 1994 Page 2 cc:

J.

B. Martin (2 copies Plan)

Regional Administrator USNRC Region III B.

L.

Bartlett (1 copy P3.an)'

Resident Inspector, Callaway L. R. Wharton (2 copies letter only)

Licensing Project Manager, Callaway Plant USNRC, Washington DC M. J. Farber w/o Chief, Reactor ProjectsSection III A USNRC Region III J.

E. Foster w/o Senior Emergency Preparedness Analyst USNRC Region III Manager, Electric Department w/o Missouri Public Service Commission Thomas Baxter w/o Shaw, Pittman, Potts & Trowbridge I

-