PHILADELPHIA ELECTRIC COMPANY 23o1 MARKET STREET P.Cl. BOX 8699 PHILADELPHI A. PA.191o1 SHIELDS L. DALTROFF ELECTRIC PR D C ION October 15, 1982 Re: Docket Nos. 50-277 50-278 Mr. John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Ref: (1) Letter dated August 24, 1982, J. F. Stolz, NRC, to E. G. Eauer, Jr., Philadelphia Electric Company (2) Letter dated September 17, 1982, J. W.
Gallagher, Philadelphia Electric Company, to J. F. Stolz, NRC.
Dear Mr. Stolz:
l This letter identifies a proposed schedule for responding to the information requested in reference (1) regarding NUREG-0737, Item II.B.3, Post Accident Sampling System.
The August 24, 1982 letter provided additional detailed design and operating criteria for the sampling system and analytical l
equipment used for post accident analysis of the reactor coolant and containment atmosphere.
l Currently, we are working with the BWR Owner's Group to address those items that are generic to the post-accident i
sampling system developed by General Electric for BWR plants.
o@
.s 8210210330 821015 PDR ADOCK 05000277 P
~
Mr. J.
F. Stolz Page 2 Completion of this task is expected in December of this year.
An additional month will be required to develop a plant specific response.
Therefore, we propose a January 31, 1983 submittal date for responding to Item II.B.3 of NUREG-0737.
i Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yours, l