  • JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS SEPTEMBER, 1982 There was one unit shutdown in the month of September.

The following safety-related maintenance was performed in the month of September:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired seal leak on 2B Boron Injection Recirculation Pump.
3. . Installed replacement handle on Spent Fuel Pool cooling loop

-return drain valve.

~

hk o&prm ,

9 p-i ~

l l

OPERATING DATA REPORT l j' DOCKET NO. 50-364

-l DATE 10/04/82 e

COMPLETED .' . G.

BY ..W(205) 899-5156 i TELEPil0NE

.' OPERATING STATUS Joseoh M.' Farlev-Unit 2 Notes

.i- I. Unit Name:

2. Reporting Period: Septembe r , 1982 1) Cumulative data

' ' 3. Licensed Thermal Power (MWt):

2652 since 7/30/81, date

4. Nameplate Rating (Gross MWe): 860 of commercial oper-
5. Design Electrical Rating (Net MWe): 829 ation.
6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Lesel To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr.-to-Date Cumulative i1. Hours in Reporting Period 720 6551 10,272
12. Number Of Hours Reactor Was Critical 699.4 5818.2 9,504.4
13. Reactor Resene Shutdown Hours 20.6 97.6 138.4 -
14. Hours Generator On Line 694.2 5726.5 9,393
15. Unit Reserve Shutdown Hours 0 0 0 I6 Gross Thermal Energy Generated (MWH) 1,814,278 14,568,592_ 24,034,749
17. Gross Electrical Energy Generated (MWH) 57_9,12_2,, 4,661,238 7,732,646
18. Net Electrical Energy Generated (MWH) 550,134 4,415,476 7,336,196
19. Unit Service Factor 96.4 87.4 91.4
20. Unit Availability Factor 96.4 87.4 91. a
21. Unit Capacity Factor (Using MDC Net) 93.9 82.8 87.8
22. Unit Capacity Factor (Using DER Net) 92.2 81.3 86.2
23. Unit Forced Outage Rate 3.6 12.6 8.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Refueling Outage r October 22. 1982; Approximately 6 weeks t

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/61 INITIA L ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/01/81 7/30/81 (9/77 )  ;

i

g. ,.

E * -v ^% ; 'p_  ;.

~ '

-e n e s e m - - r-, n .

  • , DOCKEINO. 50-364 N ' UNIT J . M. Parley-Unit 8)
  • ~

'l DA1E 10/04/82 r.. , - . .. .

Hairston,IId G.

COMPLETED 13Y W.

TELLPl!ONE (205)899-5156

.\t0NTl! September DAY,~ AVERACI' DAll.Y N1h Eit 1.EVEL DAY AVERAGE DAll. POWER LEVEL

(,'.lb e Net) (MWc Net) g.

808 g7 798 2- 805 -

13 784 806 19 802

. 3 787 20 804

  • ~

806 21 808 5

807 ,a 817 6

704 23 817

- m, ~7 .

g 0 ;4 809 -

608 25 791 9' . .

go 795 26 812 It' 766 27 810 12 796 ,3 809 ,

13 794- 29 810 1.g 795 30 810

^

. 15 799 31 16  ; 799 .

INSIT'.11CllONS ,

On this 6trnnt list the secoge d.sily unit power levelin MWe Net for each d:y in the reportingin nish. Compute to l

, the nesse-t whole nq wait.

O c- . ' (9/77)  ; i .I

\

.0.m I

. e s

  • ' 9

$ g 1

m__

UNITSiluTDOWNS AND POWER REDUCTIONS DOCKETNO. ' 50-364 .

UNIT NAME J.M. Farley-Unit 2; DATE 10/04/82 Septa ber, 1982 COMPLETED gy W.G. Hairston, III .

NEPORT MONTif TELEPHONE (205)899-5156 "t

.$ E };; Y Licensee E r, *L Cause & Co receive No. Date ( 3g y, g y Event ET o" Action to F

fiS 5 j g5 g d

Report # ,

50

[ Pacven Recurrence 012 820907 F 25.8 G 3 NA EB TRANSF Reactor tripped due to startup trans-former breaker DG-15 to 2G 4160V bus inadvertently being opened at the time i

2B Diesel Generator output breaker was being closed.

s i

f i

i

! 1 2 3 4 F: Forced Reason: Method: Exhibit G Instructions

( S: Scheduled A-Equipment Failure (Explain) 1-Manual for Pseparasiim of Data H. Maintenance of Test 2 Manual Scram. Entry Sliccis for Licensee C Refueling 3-Automatic Scram. Event Repini (l.ER) File (NUREG-i D Regulatiny Restriction 4 Other (Explain) 0161)

, E-Operator Training & License Examination i

F-Adminisisative 5

! G Opesational E:ror (Explain) , Exhibis 1 Same Source

! (9/77) ll Olhes (Explain)

?

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUl&lARY OF OPERATIONS SEPTEMBER, 1982 There was one unit shutdown in the month of September.

The following safety-related maintenance was performed in the month of September:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired seal leak on 2B Boron Injection Recirculation Pump.
3. Installed replacement handle on Spent Fuel Pool cooling loop return drain valve.

I OPERATING DATA REPORT g' . ~ DOCKET NO. 50-364 3

  • I DATE 10/04/82 COMPLETED BY _W. G. l' airs toq,II:

6 TELEPilONE (205)89'9-5156 I* OPERAIING STATUS Notes l- I. Unit Name: Joseph M. Farlev-Unit 2

2. Reporting Period: Septembe r , 1982 1) Cumulative data 2652 since 7/30/81, date o , 3. Licensed Thennal Power (MWt): of commercial oper-
4. Nameplate Rating (Gross MWe):

860 ,

829 . ation.

5. Design Electrical Rating (Net MWe):
6. Masimum Dependable Capacity (Gross MWe): 854 7

!' 7. Maximum Dependable Capacity (Net MWe): 813.7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A

. 9. Power Level To Which Restricted,if Any (Net MWe): N/A

10. Reasons For Restrictions,1f Any: N/A t

1 This Month Yr.-to-Date Cumulatise II. Hours in Reporting Period 720 6551 10,272

12. Number Of flours Reactor Was Critical 699.4 5818.2 9,504.4
13. Reactor Resene Shutdown Hours 20.6 97.6 139.4 '
14. Hours Generator On-Line 694.2 5726.5 9,393 l5. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,814,278 14,568.592 24,034,749
17. Gioss Electrical Energy Generated (MWH) 579,122 4,661,268 7,732,646
18. Net Electrical Energy Generated (MWH) 550,134 4,415,476 7,336,196
19. Unit Service Factor > 96.4 87.4 91.4
20. Unit Availability Factor 96.4 87.4 91.4
21. Unit Capacity Factor (Using MDC Net) 93.9 82.8 87.C
22. Unit Capacity Factor (Using DER Net) 92.2 81.3 86.2
23. Unit Forced Outage Rate 3.6 12.6 8.6
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:

Refueling Outage; October 22. 19 82 ; Approximately 6 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPER ATION 8/01/81 7/30/81 e

.o .

(9/77)

A enV

~

? _. . _.

DOCKL'I NO.

50-364 N

- *- UNIT T.M. Farley-Unit :

DALE _ 10/04/82 CONIPLETED 13Y W. G. Hairston,II i 1ELLPilONE (205)899-5156 5!0 Nill September DAY AVEllAGE D.\ll.Y POhEit LEVEL DAY AVERAGE DAll POWEli L EVEl.

t,',t he.Ne t ) (MWe. Net) 808 37 798 g

805 .

13 784 2 ,

1 806 19 802

. 3 787 20 804 4

806 23

  • ~

808 5

807 22 817 6

704 23 817

. . s, 7 g 0  ;,g 809 608 ,5 791 9 .

79b '6 812 10 is 766 27 810 796 3 809 12 ,

794 ,9 810 13 .

1.g 795 30 810 799 3

. 15 .

16  ; 799 -

INSTRUCllONS ,

Oa this fornnt. list the siense daily unit power levelin MWe Net for each d:y in the reponimg ininiih. Coinpute to

, the nease t whole nn ;1 watt.

 ; i cit 77) h

.s g l

DOCKET NO. 50-364 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME J.M. Farley-Unit 2,'

DATE 10/04/82

, 1982 COMPLETED BY W.G. Hairston, III ',

REPORT MONTH TELEPHONE _( 205)899-5156 t

W.

- E E

,$g };; E5 E-r, {g Cause & Correceive No. Date g 3g }g5

.3 Licensee Event p Action to F

fE $ jiji g Report # ,

mO g{ Picvent Recurrence 6

012 820907 F 25.8 G 3 NA EB T ANSF Reactor tripped due to startup trans-forner breaker DG-15 to 2G 4160V bus inadvertently being opened at the time 2B Diesel Generator output breaker was being closed.

I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee C.Refuchng 3 Automatic Scram. Event Repine (I.ER) File (NUREG-D.Regulatoiy Restriction 4 Other (Explain) 0161)

E-Operator Training & l.icense Examination F-Adminisisasive 5 G Opciational Es or(Explain) ,

Exhibia I - Same Source (9/77) 11 Othes (Explain)

. .