MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
-
fi
- JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS SEPTEMBER, 1982 There was one unit shutdown in the month of September.
The following safety-related maintenance was performed in the month of September:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Repaired seal leak on 2B Boron Injection Recirculation Pump.
- 3. . Installed replacement handle on Spent Fuel Pool cooling loop
-return drain valve.
~
hk o&prm ,
9 p-i ~
l l
OPERATING DATA REPORT l j' DOCKET NO. 50-364
-l DATE 10/04/82 e
COMPLETED .' . G.
BY ..W(205) 899-5156 i TELEPil0NE
.' OPERATING STATUS Joseoh M.' Farlev-Unit 2 Notes
.i- I. Unit Name:
- 2. Reporting Period: Septembe r , 1982 1) Cumulative data
' ' 3. Licensed Thermal Power (MWt):
2652 since 7/30/81, date
- 4. Nameplate Rating (Gross MWe): 860 of commercial oper-
- 5. Design Electrical Rating (Net MWe): 829 ation.
- 6. Maximum Dependable Capacity (Gross MWe): 854.7
- 7. Maximum Dependable Capacity (Net MWe): 813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted. If Any (Net MWe): N/A
- 10. Reasons For Restrictions. If Any: N/A This Month Yr.-to-Date Cumulative i1. Hours in Reporting Period 720 6551 10,272
- 12. Number Of Hours Reactor Was Critical 699.4 5818.2 9,504.4
- 13. Reactor Resene Shutdown Hours 20.6 97.6 138.4 -
- 14. Hours Generator On Line 694.2 5726.5 9,393
- 15. Unit Reserve Shutdown Hours 0 0 0 I6 Gross Thermal Energy Generated (MWH) 1,814,278 14,568,592_ 24,034,749
- 17. Gross Electrical Energy Generated (MWH) 57_9,12_2,, 4,661,238 7,732,646
- 18. Net Electrical Energy Generated (MWH) 550,134 4,415,476 7,336,196
- 19. Unit Service Factor 96.4 87.4 91.4
- 20. Unit Availability Factor 96.4 87.4 91. a
- 21. Unit Capacity Factor (Using MDC Net) 93.9 82.8 87.8
- 22. Unit Capacity Factor (Using DER Net) 92.2 81.3 86.2
- 23. Unit Forced Outage Rate 3.6 12.6 8.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Refueling Outage r October 22. 1982; Approximately 6 weeks t
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/61 INITIA L ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/01/81 7/30/81 (9/77 ) ;
i
- g. ,.
E * -v ^% ; 'p_ ;.
~ '
-e n e s e m - - r-, n .
- , DOCKEINO. 50-364 N ' UNIT J . M. Parley-Unit 8)
'l DA1E 10/04/82 r.. , - . .. .
Hairston,IId G.
COMPLETED 13Y W.
TELLPl!ONE (205)899-5156
.\t0NTl! September DAY,~ AVERACI' DAll.Y N1h Eit 1.EVEL DAY AVERAGE DAll. POWER LEVEL
(,'.lb e Net) (MWc Net) g.
808 g7 798 2- 805 -
13 784 806 19 802
. 3 787 20 804
806 21 808 5
807 ,a 817 6
704 23 817
- m, ~7 .
g 0 ;4 809 -
608 25 791 9' . .
go 795 26 812 It' 766 27 810 12 796 ,3 809 ,
13 794- 29 810 1.g 795 30 810
^
. 15 799 31 16 ; 799 .
INSIT'.11CllONS ,
On this 6trnnt list the secoge d.sily unit power levelin MWe Net for each d:y in the reportingin nish. Compute to l
, the nesse-t whole nq wait.
O c- . ' (9/77) ; i .I
\
- .0.m I
. e s
$ g 1
m__
UNITSiluTDOWNS AND POWER REDUCTIONS DOCKETNO. ' 50-364 .
UNIT NAME J.M. Farley-Unit 2; DATE 10/04/82 Septa ber, 1982 COMPLETED gy W.G. Hairston, III .
NEPORT MONTif TELEPHONE (205)899-5156 "t
.$ E };; Y Licensee E r, *L Cause & Co receive No. Date ( 3g y, g y Event ET o" Action to F
fiS 5 j g5 g d
Report # ,
50
[ Pacven Recurrence 012 820907 F 25.8 G 3 NA EB TRANSF Reactor tripped due to startup trans-former breaker DG-15 to 2G 4160V bus inadvertently being opened at the time i
2B Diesel Generator output breaker was being closed.
s i
f i
i
! 1 2 3 4 F: Forced Reason: Method: Exhibit G Instructions
( S: Scheduled A-Equipment Failure (Explain) 1-Manual for Pseparasiim of Data H. Maintenance of Test 2 Manual Scram. Entry Sliccis for Licensee C Refueling 3-Automatic Scram. Event Repini (l.ER) File (NUREG-i D Regulatiny Restriction 4 Other (Explain) 0161)
, E-Operator Training & License Examination i
F-Adminisisative 5
! G Opesational E:ror (Explain) , Exhibis 1 Same Source
! (9/77) ll Olhes (Explain)
?
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUl&lARY OF OPERATIONS SEPTEMBER, 1982 There was one unit shutdown in the month of September.
The following safety-related maintenance was performed in the month of September:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Repaired seal leak on 2B Boron Injection Recirculation Pump.
- 3. Installed replacement handle on Spent Fuel Pool cooling loop return drain valve.
I OPERATING DATA REPORT g' . ~ DOCKET NO. 50-364 3
- I DATE 10/04/82 COMPLETED BY _W. G. l' airs toq,II:
6 TELEPilONE (205)89'9-5156 I* OPERAIING STATUS Notes l- I. Unit Name: Joseph M. Farlev-Unit 2
- 2. Reporting Period: Septembe r , 1982 1) Cumulative data 2652 since 7/30/81, date o , 3. Licensed Thennal Power (MWt): of commercial oper-
- 4. Nameplate Rating (Gross MWe):
860 ,
829 . ation.
- 5. Design Electrical Rating (Net MWe):
- 6. Masimum Dependable Capacity (Gross MWe): 854 7
!' 7. Maximum Dependable Capacity (Net MWe): 813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A
. 9. Power Level To Which Restricted,if Any (Net MWe): N/A
- 10. Reasons For Restrictions,1f Any: N/A t
1 This Month Yr.-to-Date Cumulatise II. Hours in Reporting Period 720 6551 10,272
- 12. Number Of flours Reactor Was Critical 699.4 5818.2 9,504.4
- 13. Reactor Resene Shutdown Hours 20.6 97.6 139.4 '
- 14. Hours Generator On-Line 694.2 5726.5 9,393 l5. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,814,278 14,568.592 24,034,749
- 17. Gioss Electrical Energy Generated (MWH) 579,122 4,661,268 7,732,646
- 18. Net Electrical Energy Generated (MWH) 550,134 4,415,476 7,336,196
- 19. Unit Service Factor > 96.4 87.4 91.4
- 20. Unit Availability Factor 96.4 87.4 91.4
- 21. Unit Capacity Factor (Using MDC Net) 93.9 82.8 87.C
- 22. Unit Capacity Factor (Using DER Net) 92.2 81.3 86.2
- 23. Unit Forced Outage Rate 3.6 12.6 8.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:
Refueling Outage; October 22. 19 82 ; Approximately 6 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPER ATION 8/01/81 7/30/81 e
.o .
(9/77)
A enV
~
? _. . _.
DOCKL'I NO.
50-364 N
- *- UNIT T.M. Farley-Unit :
DALE _ 10/04/82 CONIPLETED 13Y W. G. Hairston,II i 1ELLPilONE (205)899-5156 5!0 Nill September DAY AVEllAGE D.\ll.Y POhEit LEVEL DAY AVERAGE DAll POWEli L EVEl.
t,',t he.Ne t ) (MWe. Net) 808 37 798 g
805 .
13 784 2 ,
1 806 19 802
. 3 787 20 804 4
806 23
808 5
807 22 817 6
704 23 817
. . s, 7 g 0 ;,g 809 608 ,5 791 9 .
79b '6 812 10 is 766 27 810 796 3 809 12 ,
794 ,9 810 13 .
1.g 795 30 810 799 3
. 15 .
16 ; 799 -
INSTRUCllONS ,
Oa this fornnt. list the siense daily unit power levelin MWe Net for each d:y in the reponimg ininiih. Coinpute to
, the nease t whole nn ;1 watt.
; i cit 77) h
.s g l
DOCKET NO. 50-364 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME J.M. Farley-Unit 2,'
DATE 10/04/82
, 1982 COMPLETED BY W.G. Hairston, III ',
REPORT MONTH TELEPHONE _( 205)899-5156 t
W.
- E E
,$g };; E5 E-r, {g Cause & Correceive No. Date g 3g }g5
.3 Licensee Event p Action to F
fE $ jiji g Report # ,
mO g{ Picvent Recurrence 6
012 820907 F 25.8 G 3 NA EB T ANSF Reactor tripped due to startup trans-forner breaker DG-15 to 2G 4160V bus inadvertently being opened at the time 2B Diesel Generator output breaker was being closed.
I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee C.Refuchng 3 Automatic Scram. Event Repine (I.ER) File (NUREG-D.Regulatoiy Restriction 4 Other (Explain) 0161)
E-Operator Training & l.icense Examination F-Adminisisasive 5 G Opciational Es or(Explain) ,
Exhibia I - Same Source (9/77) 11 Othes (Explain)
. .