Forwards Public Version of Revision 3 to Emergency Plan Implementing Procedure EPIP 4.1, Plant & Site Evacuation. Receipt Form Encl
ML20065L364
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/25/1982
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Office of Nuclear Reactor Regulation
Shared Package
ML112410209 List:
References
NUDOCS 8210190031
Download: ML20065L364 (1)


Text

.

EMERGENCY PLAN IMPLEMENTING PROCEDURES REVISION CONTROL SHEET

.s N.

Revision No.

9 Revision Date_ 8/25/82 Page/ Proc Date Rev.

Pare / Proc Date Rev.

Page/ Proc Date Rev.I INDEX 6-1-82 4

l1 311-82 1

1.2 6/9/82 2

2.1 1/15/32 2

2.2 2/1/82 3

2.3 12/2/81 0

3.1 3/1/82 2

3.2 3/1/82 3

3.3a 10/21/81 1

3.3b 6/1.5/82 1

4.1 7/19/82 3

4.2 5/11/81 0

4.3 10/19/81 1

.4.4 5/11/81 0

4.5 5/13/82 0

5.1 11/24/81 1

5.2 11/24/81 1

6.1 5/11/81 0

6.2 5/1'1/81.

0

[

6.3 3'/1/82 1

6.4 3/3/82 2

s

!sv 821014018B 821001

~(fDRADOCK b

05000331 b._,

~PDR 1

._..a

DT.RGENCY PLAN IMPLEMENTING PROCEDURES INDEX Docunent No.

Title 1.1 DM:ermination of the Emergency Action Level 1.2 Notification of the Emergency Response Organization and Offsite Agencies 2.1 Activation and Operation of the Operational Support Center 2.2 Activation and Cperation of the Tecnnical Support Center 2.3 Emergency Coordinator Duties 3.1 Onsite Radiological Monitoring 3.2 Offsite Radiological Monitoring 3.3a Initial Dose Projections 3.3b Follow-up Dose Projections 4.1 Plant and Site Evacuation 4.2 First Aid, Decontamination and Medical Support 4.3 Rescue and Emergency Repair Work 4.4 Protective Action Guides and Exposure Limits Administration of Potassium Iodide (KI) Organization 4.5 Deactivation of the Emergency Response 5.1

~

5.2 Recovery and Re-entry 6.1 Maintenance of the EPIPs 6.2 Training and Drills 6.3 Maintenance of Emergency Facilities Equipment and Supplies

- 6.4 Emergency Preparedness Communications Testing i

N w='

nev. s S/25/82 l

i

-~

EMERGENCY PLAN IMPLEMErlTIfiG PROCEDURE-EPIP 4.1 1

of 15 Page PLAtlT AtID SITE EVACUATI0ft Revision 3 Date 7/19/82 1.0 PURPOSE

- This procedure provides instructions for evacuation to a safe assembly area and for accountability of personnel at the DAEC in the event of an emergency.

2.0 APPLICABILITY

- This procedure applies to DAEC, IELP, Contractor, and Visitor

-personnel within the site boundary in the event of a site evacuation. Requirements delineated in this procedure shall be implemented for the occurrence of an event which may result in an emergency condition classified as an Alert, Site Emergency or General Emergency (Evacuation may also be used for non-emergency accot.ntability).

NOTE:

A Plant Evacuation is defined as evacuation of personnel from selectea buildings or facilities at the DAEC, where the evacuated personnel are reassembled at locations on the site.

^

)

w.

A Site Evacuation is defined as evacuation of some or all personnel trom the DAEC site to an offsite location.

3.0 RESPONSIBILITIES 3.1 ' Shift Supervising Engineer:

Initiate the Site Evacuation Alarm for any event classified as an ALERT or greater. The evacuation alarm may also be sounded for other events, at the discretion of the SSE.

Ensure onsite personnel are notified by an audib.le evacuation signal and that appropriate announcements are made on the plant paging system.

i

.-. Account for all on duty shift operating personnel.

3.2 Emergency Coordinator s

Ensure that non-essential personnel are evacuated from the site for a Site or General Emergency.

t

_a

-.=

l f f*

+. -.

l

/

EMERGENCY PLA'l IMPLEMEtiTING PROCEDURE EPIP 4.1 Page 2

of 15 PLANT AND SITE EVACUATION Revision 3 Oat e 7/19/S2 3.3 Security Shift Suoervisor Ensure all personnel are accounted for.

Control access to,and from the site during evacuation.

Coordinate Access Points at the Control Room (CR), Technical Support Center (TSC), Contractor Change House, and Security Control Point as appropriate.

3.4 -Operations Support Center Supervisor Organize and control evacuated personnel at the OSC and Contractor Change House.

Assist in accounting for personnel assigned to the OSC and the Contractor Change House.

4.0 INSTRUCTIONS 4.1 Plant Evacuation 4.1.1 The Shift Supervising Engineer (SSE) shall sound the evacuation alarm for any event classified as an Alert or greater. At the discretion of the SSE, the evacuation alarm may also be sounded for other events, such as:

a) an Unusual Event which warrants evacuation.

b) other occurrences which require the evacuation of any part of the plant.

(Note that, for accountability purposes, evacuation of any area of the plant requires evacuation of the entire plant).

4.1.2 The SSE, based on his knowledge of the nature and location of the problem, shall consider safe evacuation routes for personnel in the plant so that they may avoid hazardous areas while evacuating. The evacuation announcement (see 4.1.3 below) shall provide such information as necessary.

L NOTE:

Such evaucation routes may require use of doors which are normally sealed and alarmed, anri which are not normally available for routine entrance or exit. Use of such doors for emergency evacuation will, of course, sound these alarms. Security personnel should recognize that such alarms may tv expected during an evacuation.

+

O 4

[j

.-._3, N

W' t--

n y,

w

-m-7-y-r-m ir e

-yr y,eeq n--

y

.-em--

    • m--y,.pw9 ppg--

EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 4.1 Page 3

of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82

\\

4.1.3 Upon completion of the tone alarm, the SSE shall announce the evacuation and provide further instructions on the paging system.

a.

The armouncement over the paging system should be as follows:

ATTENTION ALL PERSONNEL:

An-ALERT / SITE / GENERAL emergency has been declared.

All personnel onsite shall evacuate to their designated evacuation centers.

(Provide additional specific instructions, as reouirea.)

4,.1.4 Repeat the tone alarm and paging instructions.

4.1.5 All onsite personnel shall proceed without delay to the following predesignated assembly areas, (see Attachment 1). Note that it is each employee's responsibility to heed any instructions given over the paging system regarding safe evacuation routes, and to act accordingly, a.

Predesignated personnel shall report to the TSC as per EPIP 2.2, " Activation and Operation of the Technical Support Center."

b.

All other IELP/DAEC personnel except the on-shif t operating crew and security personnel shall report to

-the OSC as.per EPIP 2.1, " Activation and Operation of

'the OSC." The on-shift operating crew will report to L

the Control Room and security personnel will begin implementing their assigned duties. See " Security j

Shift Supervisors Checklist", Attachment 7 of EPIP 2.1.

i!'

l c.

Contractors shall report to the Contractcr Change House.

l l

d.

Visitors st.all be escorted to the Security Control

i Point. Upon the visitors' exit from the Protected Area, the escorts shall then proceed to their assigned lt l

area.

l[

. e.

Personnel onsite but outside of the Protected Area will l-report to the Security Control Point.

1

{b y

u

{-

li i:

l*'

~.-.

,_i_.___

, - ~

t EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 4.1 j

Page 4

of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 4.1.6 Personnel who evacuated the reactor building by way of alarmed doors shall report immediately (prior to reporting to their designated area) to the OSC to be monitored, since they will have bypassed the portal monitor at Access Control. They shall also report to the Central Alarm Station (ext. 241) the location of the alarmed door by which they evacuated. They shall then report to their designated assemoly area for accountability purposes.

4.1.7 In the event that the OSC and Contractor Change House are not habitable, personnel assigned to those areas shall be redirected to the Offsite Relocation and Assembly Area (0RAA).

1.1.8 If the TSC is not ' habitable, personnel designated by the Emergency Coordinator shall report to the Control Room.

4.2 Monitoring

~

4.2.1 ~ Initiate radiation surveys and airborne sampling as directed by the Site Radiation Protection Coordinator to

~

determine habitability of the.0SC and Contractor Change House per EPIP 3.1, "Onsite Radiological Monitoring."

NOTE Radiation surveys and airborne radiation sampling of the TSC and Control Room will be conducted based uocn an evaluation of instrument readings monitoring the general area and atmosphere in those locations. Follow-up sampling / surveying should be performed to verify habitability.

4.2.2 Radiation monitoring of evacuated personnel will be performed per RPP 5.2, " Controlled Area Methodology".

-4.2.3 In the event of a radiological release, personnel to be released offsite will be surveyed for radiological contamination prior to being released from company property. This monitoring will be accomplished at' the Controlled Access Point.

e w

,p-

' * - * ' --, - * -. e

.m s

,-n

EMERGENCY PLAN IMPLEMENTING PROCED'JRE EPZP 4.1 Page 5

of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 5.'

NOTE If designated areas are not habitable, personnel radiological surveying will be accomplished at the offsite assembly area.

4.3 Accountability 4.3.1 Personnel accountability shall be performed to identify missing personnel as soon as possible after implementation of EPIP 4.1, " Site Evacuation". Accountability should be accomplished within 30 minutes after the evacuation alarm has been sounded. Accountability shall be reported to the Security Shift Supervisor, as fol',aws:

a.

The Shift Supervising Engineer shall ensure shift operating crew personnel are accounted for and report to the Security Shift Supervisor.

b.

The TSC Supervisor shall ensure personnel in the TSC are accounted for and report to the Security Shift Supervisor.

c.

The OSC Supervisor shall assist the Security Shift Supervisor in accounting for personnel in the OSC and the Contractor Change House. Other personnel may be designated to assist in accountability, as necessary.

d.

Accountability of personnel shall be verified and/or cross checked by the Security Shift Supervisor using the Badge Board located at the Security Control Point and the Emergency Assignment Board located in the hall L

near the Security Control Point.

e.

Results of the accountability survey shall be reported by the Security Shift Supervisor to the OSC Supervisor and the Security & Support Supervisor.

~

f.

The Security & Support Supervisor shall advise the

[

Emergency Coordinator of the resuits.

lt 4.3.2 In the event missing personnel are identified, initiate rescue efforts in accordance with EPIP 4.3, " Rescue and l,

Emergency Repair Work."

4.3.3 If the evacuation was conducted'due to a local radiation J

emergency, once accountability has been established, the Emergency Coordinator may release personnel to return to their normal work areas with the exception of the affected local areas.

1 i

'I

!!C.

,,., -,,.., ~, -. ~, -. - - - --

- EPERGEliCY PLAN IMPLEMENTING PROCEDURE EPIP 4.1 Page 6

of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 4.4 ' Security ~ Access Controls 4.4.1 -Shif t security personnel-shcil make a tour of the property as authorized by the Emergency Coordinator, including buildings outside the Protected Area, Non-IELP ' personnel found on company property will be a.

escorted to the Security Control Point, surveyed for contamination and, if not contaminateo, released from the site and escorted off company property.

b.

If contaminated, decontamination shall be as described in EPIP 4.2, "First Aid, Decontamination and Medical Support."

4.4.2 The Emergency Coordinator through the Security Shift Supervisor will coordinate access to the site with local law enforcement agencies.

Local law enforcement agencies will establish access a.

control. points at predetermined locations to prevent unauthorized access to the site.

  • "a b.

The Security Shift supervisor will coordinate with the local law enforcement agencies, as required, to authorize personnel access to the site.

4.4.3 Shift security personnel shall set up access control points at ~the TSC, Control Room, Contractor Change House, and the locker room in the OSC as appropriate. Access to and egress from these locations will be controlled by Security Personnel in order to maintain accountability until personnel are released to return to work or sent offsite.

NOTE Access control points may be deleted 't the discretion of the Emergency Coordinator..

4.5 Evacuation Beyond the Site Boundary (Site Evacuation) 4.5.1 Evacuation of the site property for nonessential personnel.

s may be required based upon:

i.

a.

Severity of the event - Nonessential personnel shall be evacuated for a Site or General Emergency unless radiological' environmental conditions prohibit.

v b.

Habitability of assembly areas.-

  • %e W

,->,h m p.s um w,e e.w,,#.

g

EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 4.1 Page 7

of 15 PLANT AND SfTE EVACUATION Rev'ision 3 Date 7/19/82

' ~

4.5.2 Evacuation of personnel from the site property will be authorized by the Emergency Coordinator.

4.5.3 If evacuation is required and authorized, it shall be directed by the OSC Supervisor and coordinated with the Security Shift Supervisor.

4.5.4 Evacuation from the site property shall be to the Offsite Relocation and Assembly Area (0RAA) at the Palo School Gymnasium facility unless otherwise directed by the Emergency Coordinator.

a.

If the radiological release rate and meteorological conditions are such that evacuation to the Palo facility is inappropriate, an alternate location shall be selected by the Emergency Coordinator based upon input from the Site Radiation Protection Coordinator.

A page system announcement will be made notifying evacuees of the alternate offsite assembly "e a.

b.

Activities at the ORAA shall be in accordance with Attachment' 3, " Operating Procedures for the ORAA".

c.

In the event that decontamination of personnel, equipment or vehicles is required, such efforts will be coordinated by the Site Radiation Protection Coordinator and conducted 9/ Health Physics personnel as directed by the OSC Supervisor.

4.5.5 Evacuation from the site property shall be by the routes shown in. Attachment 2, using personal transportation.

a.

The south route from the plant will normally be used for site evacuation unless inclement weather, high traffic density or radiological conditions dictate use of the northern route.

b.

Security personnel will provide traffic control onsite..

c.

Accountability of personnel during evacuation shall be maintained.

4.5.6 An accountability check should be performed once personnel have arrived at the alternate assembly location. Personnel may then be released, or requested to stay, as necessary.

4.5.7 The ORAA will also be used, if necessary, as a staging area for assembling, briefing, and equiping personnel who are assigned to reenter the site following an incident.

i-.

m

' Md vs W' /

% % 9 466 M

o

.w-p p m p 444ow,e.,

me me4m ei-r P

1 EMERGENCY PLAN 1MPLEMENTfMG PROCEDURE EPIP 4.1 Page 8

of 15 PtANT AND SITE EVACUATION Revision 3 Date 7/19/82 J

j 5.0~ REFERENCES 1.

Quane Arnold Energy Center Emergency Plan 2.

Iwa Electric Light and Power Company Corporate Emergency Response Plan 3.

Radiation Protection Procedures 6.0 ATTACHMENTS 1.

Onsite Assembly locations 2.

Site Evacuation Routes 3.

Operating Procedures for the Offsite Relecation and Assembly Area O

Approved by:

Date 6 2M ~!$1-Plant superintencent - Nuclear Date f/A /,P2 Reviewed by:

).l[j.Jd ALARA Coordinator O

-k Reviewed by:

Date Operations Committee Gnairman Approved by: k d

Date 9-/4-M OperationsSuperv/sor s

I-1 I

i

?~

EMER'GENCY PLAft IMPLEMEtlTIf1G PROCEDURE EPIP 4.1 Page g

of 15 PLANT AliD SITE EVACUATION Revision 3 Date 7/19/82 ATTACHMENT 1 ONSITE A55tMcLY LutATIONS

\\\\\\ V Ef 5 % =

\\

mmm Technica1 Support Center x

ASSDSLY ARTA:

~

h~

h._

_~ \\

ENERGENCY RESPONSE TEAM

EMERSE!!CY PLA1 IMPLEMENTING PROCEDURE EFIP 4,1 Page 10 of 15 PLAfiT AtlD SITE EVACUATION Revision 3 Date 7/19/82 ATTACHMENT 2 SITE EVACUAiluk ROUTES F..

.s

~

NORTH EVACUATION w

s, ROUTE s.

NORM AL ROADBLOCK g

PARKING LOTS K

i a

SWITCHYARD L

DAEC l

P u

o i

I 1

\\ FENCE

~ J N SOUTH 4-EVACUATION ROUTE U

SITE BOUNDARY i

U I

v v

OFFSIT E RE LOC ATION 4& AS S E M BLY AREA O

I F---

\\

l I

_i LTOWN OF PALO

.i I

i i

b---

J HIGHWAY 94+

EMERGENCY PLAN IMPLEMENTING PROCECURE EPIP 4.1 Page 11 of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 ATTACHMENT 3 OPERATING PROCEDURES FOR THE OFFSITE RELOCATION AND ASSEMBLY AREA e..

- The Offsite Relocation and Assembly Area (0RAA) is a f acility which will be used to relocate and reassemble people from the DAEC in case of a radiological emergency which requires evacuation. The ORAA is located at the former school gymnasium in Palo, about 2 1/2 miles southwest of the piant. The building ano aoout six acres of lanc arouna i; will be used as required for personnel and vehicle assembly, monitoring and accountability.

The building floor plan is shown in Figure 1.

Both the building and the land are normally used by the public for various purposes, however, during a site emergency, these uses would be temporarily superceeded by DAEC for use as the ORAA.

The ORAA will be staffed by a senior management representative designated by the Emergency Coordinator. This representative will be assisted by one or more Health Physics technicians designated by the Radiation Protection Coordinator.

Evacuating vehicles will approach the ORAA from the north. A security guard or other traffic control officer (s) will ba stationed at the north end of the ORAA lot to direct vehicles into the ORAA, and to prevent unauthorized vehicles from cutside from going north on the county road toward the plant. Security Site Evacuation Checklist is to be used by security personnel at the Offsite Relocatior ;

and Assembly Area.

I A check point / monitoring station will be set up at the northwest corner of the ORAA property. At this ' station, a security guard will check in and record the names of personnel from the plant. Vehicles will be monitored and directed to designated clean or contamined parking areas as appropriate. Contaminated vehicles will be held in the contaminated parking area until the contamination has decayed to levels acceptable for uncontrolled release.

People will be directed into the gymnasium through the door on the NE corner. A portal monitor will be utalized on the inside door which enters the gymnasium and i

stage. All personnel will be scanned as they pass through the portal monitor and i

contaminated people will be directed to the stage. Those found to be uncontaminated will be directed to the clean area on the south side of the gymnasium.

l Personnel showing positive indications of contamination will be handled as follows:

l. If contamination is on the clothing, the cnntaminated clothing will be removed (to the extent modesty and temperature permit) bagged and tagged with the owner's name. If the person is then found to be clean he will be directed to the clean waiting area.
2. If remain % clothing, or the individual himself, is found to be contaminated, he will be decontaminated to the extent possible using paper towels, waterless hand cleaner, etc. and provided with clean temporary clothing (e.g., coveralls). When adequately decontamined, he will be directed to the clean waiting area.

>ow

- +

y,e

..p,

.w

-m-i mi m

i m

EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 4.1 Page 12 of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 ATTACHMENT 3 (Continued) 3.

Personnel will be decontaminated only to the extent necessary to facilitate their transport to the offsite decontamination facility, if further decontamination is needed.

4._

After decontamination, personnel will be released to go home or to return to their assigned duties, as directed by the Emergency Coordinator or his

' designated representative.

Dosimeters will be collected from all evacuated personnel, and exchanged for those who will return to the plant.

Copies of the" Personal Statement Concerning Incident" form (Attachment 5, EPIP 2.1) will be distributed to all evacuated personnel, if appropriate, and the ccmpleted copies collected before the personnel are released.

Kitchen facilities are available at the ORAA to feed personnel who may need to remain there for extended periods.

WSI guards will maintain security at the ORAA as requested by the senior management representative. The Security Shift Supervisor will ensure that the designated personnel have evacuated the plant and are accounted for at dhe ORAA prior to being released or reassigned to duties at the plant.

The following supplies will be maintained at the ORAA for use during an emergency:

LOCKER 8-A Minimum Item Quantity h

Extra large Cloth Coveralls 75 pair

' Cloth Hoods 75 each Rubber Boots 75 pair Rubber Gloves 75 pair Cotten Liners-144 pair Plastic Booties 200 pair i

Masking Tape 12 rolls Paper' Scull Caps 100 each l

Cotton Work Gloves 48 pair

\\

c e

l J

EMERGENCY PLAli IMPLEMENTING PROCEDURE EPIP 4.1 Page 13 of 15 PLA!{T AND STTE EVACUATIO:4 Revision 3 D at e' 7/19/82 Fg i

LOCKER 8-B id--

Minimum l

Item Quantity j

Paper coveralls 25 sets j

Shoe covers 25 sets Cotton ifners-25 sets Rubber gloves 25 (sets)

Waterless hand cleaner 2 containers l

Towels 12 each Teri towels.

6 bundle l

Large plastic bags 10 Small plastic bags 10 Masking tape 2 rolls i

Visqueen 1 roll l

Tablets / Clipboards 4 each i

Notebooks 4 each j

Felt Peas 1 box Ballpoint Pens 1 box Paper (pad) 6 pads Pencils 1 box I

Dosimeters 200mR 10 Dosimeters 200R 2

Dosimeter charger 1

Swipe Papers 2 boxes Kf Tablets 6 bottles R/S Stickers I roll Flashlights 4 each Public Address System 1

EPIPs 1

Radiation protection procedures 1

Personnel statement of incident record 1 pad

?

First aid kit 1

81aakets 2

i -

Barr-icade Ribbon 12 rolls l

L l

1 1

... - ~..

EMERGENCY PLAN IMPLE tEitTI!!G PROCE!>URE EPIP 4.1 Page 14 of 15 PLANT AND SITE EVACUATION Revision 3 Date 7/19/82 l

RELOCATION & ASSEMBLY AREA Figure 1 1-

[

RELOCATION a ASSEMBLY

. AREA L

i BfJtGENCY KIT LOCKER ROCMS(TYP) 7 a o SQ.Fr.

-[

.l STAcE e'

A-935 SQ FI iiiid I

~

1 i

!i A

2 3

n d

4 i

-BLEACHERS ILEACHERS-j N-

'i eYu 4789 SQ. FT.

1 i

q numana 1%RKING r.

9*

CLA$s ROOM 654 SQ.FT.

MENS (TYP 4 PLACES)

{

y ROOM L

u 7

7 7

T i

LADIES ROOM y

CouNCn.

Cuss menEn FRONT CHAMBERS ROOM ENTRANCE 1l~

i

,. +

,,r,

,,-r-,n,,..

~_.

EMERGEtiCY PLAfi !!:?LEMENTING PROCEDbRE EPIP 4.1 Page 15 of 15 PLANT AND SITE EVACUATION Revi,sion 3 Date 7/19/82 SECURITY SITE EVALUATION CHECKLIST AT THE 0FFSITE RELUCATION AND ASSEMBLY. AREA (ORAA) 1.

Security personnel will be dispatched to the ORAA by the OSC Supervisor.

2.

Security personnel will take the Palo Key ring and two Security / Rad radios to the ORAA.

3.

Place.the evacuation information sign ove'r the egress card reader.

4., Place the badge receptacle at the egress card reader.

5.

The Security force member assigned to the egress post will ensure those people to be evacuated use the egress reader and place badge in receptacle and take TLD and Dosimetry to the ORAA.

6.

At the ORAA, the security force will

^)

open doors Ai direct traffic to the lot north of the school direct personnel to enter the northeast door take TLD and Dosimetry as they enter the door (return them after accountability) 7.

State. accountability using the TLDs/ Dosimetry.

complete a list by badge # of individuals evacuating to the ORAA I

8.

Security personnel at the plant site will compile a list by badge # of those people evacuated to the URAA.

4

-9.

The security personnel at the ORAA will call the SCP 1 and g

compare names compiled and give accountability status to USC Supervisor.

10. Maintain traffic and crowd control after accountability is completed.
11. -No one is to enter the ORAA without a TLD/ Dosimeter and no one exits unless-authorized by.the URAA Supervisor.

4

-)

~

1.

m

_