ML20065J989
| ML20065J989 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/31/1993 |
| From: | Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | |
| Shared Package | |
| ML20065J970 | List: |
| References | |
| NUDOCS 9404190097 | |
| Download: ML20065J989 (3) | |
Text
,.
, Attachment 2 to NA'94-0068 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 01-03-94 COMPLETED BY M.
Williams
. TELEPHONE 316-364-313.1 MONTH December, 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1145 17 1126 2
1145 18 1152 3
1146 19 1156 4
1146 20 1156 5
1145 21 1144 6
1149 22 1156 7
1152 23 1154 8
1151 24 1153 9
1153 25 1156 10 1148 26 1157 11 1155 27 1156 1156 28 1155 12 13 1155 29 1156 14 1154 30
'1155 15 1154 31 1149 16 1153 Wolf Creek Generating Station
~~~ ~er=,
Monthly Operating Report
'~
7VOV/7OOf'@h December 1993
)
pf p.ge 3 of 5
.-~w-
.nes.:n.zzar.
Attachment _2.to NA 94-0068 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-492 WOLF CREEK GENERATING STATION-WOLF CREEK NUc M OPERATING CORPORATION DATE 01-03-94 COMPLETED BY M.
Williamn TELEPHONE 316-364-BB31 Type METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REAC'IUR CORRECTIVE AC"rIONS/ COMMENTS No Date S: SCHEDULED (Hours)
(1)
OR REDUCING POWER (2)
SIDetARY: The unit operated at or near 100% power throughout the month of December.
- 1) ' REASON: A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) PETHOD: ~ 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
- 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN)-
4.
COffrINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report December 1993 Page 4 of 5
1
- a..to NA'94-0068 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH December, 1993
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVENT December 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.
December 31, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at loot power.
i i
I
'l Wolf Creek Generating Station
. Monthly Operating Report December 1993 Page 5 of 5
.