Responds to 940321 Telcon Re 940209 TS Change 93-21,adding Fire Detection Instrumentation
ML20065J727
Person / Time
Site: Sequoyah  
Issue date: 04/13/1994
From: Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404180404
Download: ML20065J727 (2)


Text

_

I T4I

...i

. En I

f i

j Tmwessa %doy A#nnty. Post Office Box 2000. Sodtty-Darst Tennessee 3T3794000 Ken Powers Vice Prwatet. Seqtoyah Nuclear fbnt April 13, 1994 U.S.

Nuclear Regulatory Commission l

ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen In the Matter of

)

Docket Nos. 50-327 i

i Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - FOLLOW-UP LETTER FOR MARCH 21, 1994, TELEPHONE CONVERSATION REGARDING TECHNICAL SPECIFICATION (TS)

CHANGE 93-21, " REVISION OF FIRE DETECTION INSTRUMENTATION"

Reference:

TVA letter to NRC dated February 9, 1994, "Sequoyah Nuclear l

Plant (SQN) - Technical Specification (TS) Change 93-21, L

' Revision of Fire Detection Instrumentation'"

This letter is in response to a telephone conversation on March 21, 1994, between J.

D. Smith (TVA) and D.

E. LaBarge (NRC) concerning the referenced TS change.

The referenced submittal and its enclosures identified a TS change that added fire detection instrumentation.

In that submittal, TVA stated the modifications associated with the referenced TS change were complete.

This statement was in error in that the modifications have not been completed. This error was a result of miscommunication.

Specifically, the modification was originally identified as a Unit i restart item at SQN.

The modification was subsequently reclassified as a priority item and the scheduled completion date was extended. -The change in schedule was not adequately communicated.

By this submittal, TVA is notifying NRC that the modification associated with the referenced TS change is presently scheduled for completion by l

May 31, 1994.

Therefore, TVA requests that NRC not issue TS 93-21 before this date.

If you have any questions concerning this submittal, please telephone J.

D. Smith at (615) 843-6672.

Since el Ken Powers cc See Page 2 i

940418o404 940413 h~ I k-

-PDR-ADDCK 05000327 v

V-P.

PDR L 1__

. ~...

.di.

.a

')

-l e:

U.S. Nuclear Regulatory Commission Page 2 April 13, 1994 JDS EMR PMB cc Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission one White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah_ Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 i.-

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 t

5 1