ML20065J631
| ML20065J631 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/31/1994 |
| From: | Richard Anderson, Paustian H NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9404180344 | |
| Download: ML20065J631 (5) | |
Text
-
Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 April 12, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report March. 1994 Attached is the Monthly operating Report for March, 1994 for the Monticello Nuclear Generating Plant.
i Ro er O Anderson i
Director Licensing and Management Issues c
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment 9404180344 940331 PDR ADOCK 05000263 I
l R
.~w~
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 4-4-94 COMPLETED BY' H. H. Paustian-TELEPHONE 612/295-5151 OPERATING STATUS
] Notes -
J.
- 1. Unit Name :
Monticello
]-
]
- 2. Reporting peElod:
March
]
]
- 3.. Licensed Thermal Power (MWt):
1670
.]-
']
- 4. Nameplate Rating (Gross MWe):
569
]
_]
.5.
Design Electrical Rating (Net MWe) :
545.4 ;]
]
564
]
]
- 6. Maximum Dependable _ Capacity (Gross MWe) : ~~536
-] '
]
- 7. Maximum Dependable Capacity (Net MWe) :
8.
If Changes Occur in Capacity Ratings (Items Nwnber 3_Through 7).Since Last-Report, Give Reasona:
9.
Power Level To Which Restricted, If Any (Net MWe) :
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 2160 199441
- 12. Number Of Hours Reactor Was Critical 744.0 2160.0 161535.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7-
- 14. Hours Generator On-Line 744.0 2160.0 158760.7'
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
.16. Gross Thermal Energy Generated (MWH) 1241551 3599942 244864722
- 17. Gross Electrical Energy Generated (MWH) 422070 1223582 82778245'
- 18. Net Electrical Energy Generated (MWH) 407212 1180364
_79199157
- 19. Unit Service Factor 100.0%-
100.0%
79.6%
-20.
Unit Availability Factor 100.0%
100.0%
79.6%
~21.
Unit Capacity Factor (Using MDC Net)
'10 2.1 % '
102.0%
74.1%
- 22. Unit Capacity Factor-(Using DER Net) 100.4%
100.2%
72.8%
0.0%
0.0%
3.6%
- 23. Unit Forced Outage Rate (Type, Date, and Duration of.Each)1 2 4 ~. Shutdowns Scheduled Over Next 12 Months
- Refueling Outage - 9/15/94 - 39 days
-2 5. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A'
- ' 26. ' Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELCCTRICITY COMMERCIAL OFFRATION i
s
. ~.
~w
-..., ~
'Ot
- 4.
9 e
8 AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO.
50-263 4
UNIT' Monticello~~
DATE 4-4 i COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF March DAY AVERAGE DAILY POWER LEVEL
' DAY
' AVERAGE DAILY-POWER LEVEL (MWe-Net)
(MWe-Net)-
1-548.
17 548.
2 548.
18 548.
549.
19 54:5.
3 4
548.
20 540.
-5 548.
21 551.
'I
-6 548.
22 543.
7 546.
23 548.
8 547.
24
- 546, 9
547.
25 546.
10 549.
26 547..
11' 548.
27 546.
12 547.
28
-543, 13
- 549, 29 548.
14 549.
30 1547.
15
- 546, 31 546.
16 548.
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each-day in the. reporting month.
Compute to the nearest whole megawatt.
.,, ~
.c r.
E'- [ -- -, +. <. -
-i.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE-DOCKET NO.
50-263 DATE 4-4-94 COMPLETED BY H. H. Paustian TELEPHONE. 612/295-5151 MONTH MAR-03-1-94 to.
Power operation.
03-31-94 g
i T
9 Note: Power operation defined as essentially 100%'of rated power except for weekend. load drops for specified surveillance testing.
.4,-.._.,
...-m.,
v
..m.
m
.m.
4:.i UNIT SHUTDOWNS AND POL'ER REDUCTIONS DOCKET NO.
50-263 UNIT NAME l ontice no DATE 4-04-94 COMPLETED BY 7. H. Papstian REPORT MONTH March TELEPHONE [612/295-5151 -
.j
\\
Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to.
1)
Shutdown (4)
(5)
Prevent Recurrence t
(3)
't 1
None-4 t'!
I L-I I
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standsrd S: Scheduled
-A-Equipment Failure-(Explain) 1-Manual-805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling-3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain).
y f-
=
+
+
=sm.s
=
1.
"