Southren Nuclear One eting Company Post OBce Box 12W B rmingham, Atabama 35201 Telephone (205) 869-5131 L
Southern Nudear Operating Company o.v. uo,.y Vice President Farley Project the Southern cieClf tC Sy5 fern April 13, 1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant hionthly_Qgemting Data Rep _o_r1 Gentlemen:
Attached are the March 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
Ifyou have any questions, please advise.
Respectfully submitted,
[ fuu-Dave Morey RWC:jgp(mor) Attachments cc: Mr. S. D. Ebneter Mr.13. L. Siegel Mr. T. M. Ross 9404180317 940331 /'l ADOCK0500g8 p.k DR u i
n Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations March 1994 j l The unit was taken offline at 2327 on March 4,1994, for the cycle 12-13 refueling outage. There were no other unit shutdowns or major power reductions during the month of March. The following major safety related maintenance was performed during the month: 1. Performed miscellaneous corrective and preventive maintenance 'on the diesel generators. 2. Defueled the reactor. Completed visual inspection of the fuel assembhes I during off-load. Also performed fuel sipping of assemblies. One fuel assembly determined to have a cladding leak as part of this testing. The core was redesigned to exclude the leaking assembly. Refueled the reactor. 3. Inspected various safety related check valves and motor operated valves. 4. Functionally tested various mechanical and hydraulic snubbers. 5. Performed various local leak rate tests and a containment integrated leak rate test.
OPEP.ATING DATA REPORT DOCKET NO. 50-348 DATE April 6,1994 COMPLETED BY R. D. Ilill TELEP1IONE (205) 899-5156 QPERATINRSTATUS . 1. Unit Name: Joseph M. Farley - Unit i Notes 2. _ Reporting Period: March 1994
- 1) Cumulative data since 12-01-77, date 3,
Licensed Thermal Power (MWt): 2,652 of commercial operation. 4. Nameplate Rating (Gross MWe): ~ 829 860 5. Design Electrical Rating (Net MWe): 6. Maximum Dependable Capacity (Gross MWe): 855.7 7. Maximum Dependable Capacity (Net MWe): 812 g 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A 9. Power Level To Which Restricted, if Any (Net MWe N/A 10. Reasons For Restnctions,if Any: N/A This Month Yr.to Date Cumulative 11. Ilours in Reporting Period 744.0 2,160.0 143,160.0 12. Number OfIlours Reactor Was Critical - 95.7 1,511.7 113,175.6 13. Reactor Reserve Shutdown flours . 0.0 0.0 3,650.0 14. flours Generator on-line 95.5 1,511.5 111,418.1 15. Unit Reuve Shutdown flours 0.0 0.0 0.0 16. Gross Thermal Energy Generated (MWil) 227,593.3 3,961,502.2 286,453,907.4 17, Gross Electrical Energy Generated (MWil) 73,992.0 1,290,024.0 . 92,305,07T)5 18. Net Electrical Energy Generated (MWil) 65,118.0 1,220,230.0 87,160,384.0 19. Unit Service Factor 12.8 70.0 77.8 20. Unit Availabilty Factor 12.8 70.0 77.8 21. Unit Capacity Factor (Using MDC Net) 10.8 69.6 74.7 22. Unit Capacity Factor (Using DER Net) 10.6 68.1 73 I 23. Unit Forced Outage Rate 0.0 0.0 6.3 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling / Maintenance Outage started March 4,1994. Approximately D days. 25. ITShut Down at End Of Report Period Estimated Date of Startup: April 21,1994 26.- Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 03/06/22 03/09122 Initial Electricity 03!20/12 08/1801 Commerelat Operation 12/Rl!12 J2/0lH1
DOCKET ho. 50-348 UNIT 1 DATE AprirET974~ COMPLETED BY R. DTHill TELEPiloNE~~(2(15[89NSI36 'MONTIl MAltcil DAY ' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 765 17 0 2 757 18 0 .3-755 19 0 4 633 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCIlONS i-On this fonnat, list the average daily unit power level in MWe-Net for each day in the . reporting period. Compute to the nearest whole megawatt. p
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-343 UNIT NAME J. M. Farley - Unit 1 DATE April 6,1994 COMPLETED BY R. D. Hill REPORT MONTil March TELEPHONE (205) 899-5156 l! N' (( METI!OD OF LICENSEE CAUSE AND CORRECTIVE i i DURATION SIIUTITNG EVENT SYSIIM COMPONENT ACTION TO ~ j NO. DATE TYPE (1) HOURS REASON (2) DOWN REACTOR tg REPORT # CODE (4) CODE (5). PREVENT RECURRENCE I 001 0376TN4 S 648.5. C 1 N7A N/A N/A At 2327, on 03/G4/94, the Unit was taken offline for the Cycle b 12-13 Refueling Outage. Il I f. 4 i i-l1 I E 1: 2 3: 4: 5: F: Forced Reason Method Exhibit G-Instructions for Exhibit I-Same Source S: Scheduled ' A - Equipment Fatlure (Explain) 1-Manual Preparations of Date Entry B - Maintenave or Test 2 - Manual Scram Sheets for Licensee Event - C-Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161) D - Regulatory Restrictum 4 - Other(Explam) E - Operator Trainmg & License Fwnin*% F - Administrative G - Operational Error (Explain) . II-Other (Explain) 4 e e e y. y 2 y m-
4 Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations March 1994 -1 'I There were no unit shutdowns or major power reductions during the month of March. The following major safety related maintenance was performed during the month: 1. Performed miscellaneous corrective and preventive maintenance on the diesel generators.
OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 6,1994 COMPl.ETED BY R. D. Ilill TELEPIIONE (205) 899-5156 l DMRATINGETEMS 1. Unit Name: Joseph M. Farley - Unit 2 Notes 2. Reporting Period: March 1994
- 1) Cumulative data since 07-30-81, date 3.
. Licensed Therrnal Power (MWt): 2,652' of commercial operation. 4. Nameplate Rating (Gross MWe): 860 5. Design Electrical Rating (Net MWe): 829 6. Maximum Dependable Capacity (. Gross MWe): 863.6 7. Maximum Dependable Capacity (Net MWe): 822 8. If Changes Occur in Capacity Ratings (Items NumberTTiirough 7) Since Last Report, Give Reason N/A ~ 9. Power Level To Which Restricted, if Any (Net MWe N/A 10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative 11, Hours in Reporting Period 744.0 2,160.0 t i 1,073.0 12. Number Of Hours Reactor Was Critical 744.0 2,160.0-95,113.7 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 14. Ifours Generator On-line 744.0 2,160.0 93,721.8 15. Unit Reserve Shutdown llours 0.0 0.0 0.0 16 Gross Thermal Energy Generated (MWil) 1,962,547.9 5,688,457,7 239,223,8!0.5 17. Gross Electrical Energy Generated (MWil) 650,137.0 1,887,897.0 78,437,358.0 18. Net Electrical Energy Generated (MWil) 619,589.0 1,749,219.0 74,374,308.0 19 Unit Service Factor 100.0 100.0 84.4 20. Unit Availabilty Factor 100.0 100.0 84.4 21. Unit Capacity Factor (Using MDC Net) 101.3 101.3 81.6 22. Unit Capacity Factor (Using DER Net) 105 1 100.5 80.8 23. Unit Forced Outage Rate 0.0 0.0 4.1 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/0!r'81 05/08#i1 Initial Electricity 051224!B1 05/25181 Commercial Operation 08/D1/81 07dD/31 j
.. ~ - ~ nocxET No.~ 50-364 UNIT 2 DATE ApriT 6,199T con 1PLETED BY RTDTHilF TELEPiloNE~(2b3[895$II6 MONTH M A R cil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 831 17 839 2 834 18 832 3 837 19 832 4 837 20 829 5 834 21 826 6 834 22 834 7 833 23 830 t 8 834 24 827' 9 830 25 829 10 838 26 831 11 840 27 824 12 823 28 831 l 13 834 29 837 14 836 30 837 15 832 31 838 16 836 INSIRUfTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ' 50-364 ^ UNIT NAME J. M. Farley - Unit 2 DATE April 6,1994 COMPLETED BY R. D. Hill REPORT MONTIi March TELEPHONE (205) 899-5156 tr l METIIOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SilU1 TING EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPE (!) HOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVEhT RECURRENCE There were no shutdowns or power reductions during the month of March. I ~ 1 l l i 1: 2: 3: 4: 5: F: Forced Reason Method Exhibit G-Instmetions for Exhibit I-Same Source S: Scheduled A - Eqwpment failure (Explain) 1-Manual Pirparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensec Event C-Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161) D - Regulatory Restriction 4 - Other (Explain) E - Operator Training & License Examination - F - Administrative G
- Operational Error (Explain) iI-Other(Explain) m.