ML20065J271

From kanterella
Jump to navigation Jump to search
Corrected Page 6-10 to Amend 69 to License NPF-49,reflecting Revs Made by Amends 33 & 69
ML20065J271
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/06/1994
From:
NRC
To:
Shared Package
ML20065J278 List:
References
NUDOCS 9404180102
Download: ML20065J271 (1)


Text

U ADMINISTRATIVE CONTROLS REVIEW 6.5.3.6 The NRB shall function as an independent review body and shall review:

a.

The safety evaluations for:

(1) changes to procedures, equipment, or systems; and (2) tests or experiments completed under the provisions of 10 CFR 50.59, to verify that such actions did not constitute an unreviewed safety question; b.

Proposed changes to procedures, equipment, or systems which involve an unreviewed safety question as defined in 10 CFR 50.59; c.

Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59; d.

Proposed changes in Sections 1.0-5.0 of these Technical Specifications or this Operating License; e.

Violations of Codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance; f.

Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety:

g.

All REPORTABLE EVENTS; h.

Indications of a significant unanticipated deficiency, affecting nuclear safety, in some aspect of design or operation of structures, systems, or components; and

i. Reports and meeting minutes of the PORC.

AUDITS 6.5.3.7 Audits of unit activities shall be performed under the cognizance of the NRB. These audits shall encompass:

a.

The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months; b.

The performance, training, and qualifications of the unit staff at least once per 12 months; c.

The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems, or method of operation that affect nuclear safety, at least once per 6 months; and d.

Any other area of unit operation considered appropriate by the NRB or the Executive Vice President-Nuclear.

9404180102 940406 PDR ADOCK 05000423 P

PDR NilLSTONE - UNIT 3 6-10 Amendment No. 33, 69

,