Text
.
Consumers Power James W Ceek Company vin n su n,- ~ w a a.zi ~.s and Constaction General offices: 1945 West Pamell fioed, Jackson, MI 49201 + (517) 7840453 September 28, 1982 82-05 #2 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -
DOCKET NOS 50-329 AND 50-330 ACCIDENT TEMPERATURE EFFECTS ON CONTAINMENT LEVEL MEASUREMENT FILE:
0.4.9.61 SERIAL:
19053
References:
- 1) Letter, J W Cook to J G Keppler, dated May 14, 1982, Serial Number 16192 This letter, as was the referenced letter, is an interim 50.55(e) report on accident temperature effects on containment level measurement.
Detailed design and analysis of the modifications to correct temperature effects on level measurements continues with final results expected by January 1983. This ongoing effort is also integrated with the work required to resolve Confirmatory Issue 16 in the Midland SER (IE Bulletin 79-21).
Another letter, either interim or final, will be provided on or before February 4, 1983.
JWC/WRB/JLW/jac CC:
RJCook, NRC Resident Inspector Midland Nuclear Plant Document Control Desk, NRC Washington, DC 8210050143 820928 PDR ADOCK 05000329 s
PDR OCT 1
OC0982-0025A-MP01
2 Serial'19053 82-05 #2
?
CC:
CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel JHarbour 'ASLB Panel AS&L Appeal Panel
~MMCherry, Esq MSinclair
'BStamiris CRStephens, USNRC WDPaton, Esq USNRC.
FJKelley, Esq Attorney General SHFreeman, Esq. Asst Attorney General WHMarshall GJMerritt, Esq. TNK&J i
I OC0982-0025A-MP01