Forwards Tn Historical Commission to TVA Concurring That Archelogical & Historical Field Survey Is Not Warranted Prior to Transmission Line Tower Const
ML20065G924
Person / Time
Site: Clinch River
Issue date: 09/28/1982
From: Longenecker J
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
To: Check P
Office of Nuclear Reactor Regulation
References
HQ:E:82:031, HQ:E:82:31, NUDOCS 8210040304
Download: ML20065G924 (2)


Text

,. <*

Department of Energy '

Washington, D.C. 20545 Docket No. 50-537 HQ:E:82:031 SEP 2 81982 Mr. Paul S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Mr. Check:

CRBRP: TRA11SMISSION LINE ARCHAELOGICAL FIELD SURVEY

Reference:

Letter to M. Ramsey from H. Harper, subject:

Transmission Line, Clinch River Breeder Reactor Plant, Oak Ridge, Tennessee, dated September 8, 1982 The reference letter (enclosed) provides concurrence from the Tennessee Historical Commission that an archaelogical and historical field survey is not warranted prior to transmission line tower construction. If during tower construction archaelogical materials are encountered, the Tennessee Historical Commission will be notified for consultation prior to further construction activity at that site.

The CRBRP Environmental Report will be updated to reflect the above.

incerely, J n R. Longe ecker Acting Director, Office of the Clinch River Breeder Reactor Plant Project Office of Nuclear Energy Enclosure cc: Service List Standard Distribution Licensing Distribution 0%

Q0 ,

8210040304 820928 PDR ADOCK 05000537 A PDR

I k

gja vg. p,w,

'%Q/

TENNESSEE HISTORICAL COMMISSION 701 BROADWAY. NASHVILLE 37203 615/742-6716 September 8, 1982 tk i 11 D. Ramsey i Ter m see Valley Authority

, Nor m Tennessee 37828 Re: Transmission Line, Clinch River Breeder Reactor Plant, Oak Ridge, Tennessee

Dear Mr. Ramsey:

! This letter is to confinn prior telephone conversations between your and my staff concerning the need for field survey of CRBRP transmission lines.

L Since the proposed line parallels an existing Bull Run-Sequoyah 500 KV line

and the section on the Plant site has been examined, the effects will be

! limited to tower footing construction. Therefore a separate archaeological and historical field survey is not warranted. If during tower construction, l

archaeological materials are encountered our office should be informed.

l No further action is required to comply with the National Historic Preservation Act for this phase of the CRBRP project.

Thank you for your cooperation.

Sincerely, v' AM ! . vypx.

l Herbert L. Harpe'r, E Executive Director and Deputy State Historic Preservation Officer l HLH:jd I

9/14 /82 --JEG:TDD \

j cc: _jt r . Ken Yates \ ,

Public Safety Division CRBRP/PO Box U 55 Jefferson circle Oak Ridge, Tennessee 37830 t

i

T. A. Wojtalik, 323 CBB-C l