ML20065G587

From kanterella
Jump to navigation Jump to search
Forwards Suggested Dates & Schedule for Conducting Emergency Preparedness Drills,Exercise for Score & Appraisal for Facility
ML20065G587
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/24/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Novak T
Office of Nuclear Reactor Regulation
References
W3F82-0344, W3F82-344, NUDOCS 8210040168
Download: ML20065G587 (2)


Text

l LOUISIANA P O W E R. & L I G H T! P O BOX 6008

  • NEW ORLEANS LOUISIANA 70174 34a OuanONOe sinEn
  • (504) 366-2345

?ON <IvsYEIr5 L V. MAURIN u1 Vice President September 24, 1982 Nucteor operations W3F82-0344 c'

Mr. Tom 11. Novak Assistant Director of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Waterford 3 SES Emergency Preparedness Schedule

Dear Mr. Novak:

Transmitted herewith is the suggested dates and schedule for conducting Emergency Preparedness Drills, Exercise-For-Score, and Appraisal for the Waterford 3 Steam Electric Station.

If you have any questions, please do not hesitate to contact either R. Azzarello (504-363-8783) or G. Bailey (504-464-3207).

Yours very truly, L. V. Maurin LVM/GPB/sm Attachment cc:

E. L. Blake, W. M. Stevenson, S. Black, D. Perrotti, L. Constable, C. Haci<ney, A. Lookabaugh, I. Lucas, B. Madere, T. Craghan (LOEP),

B. Spell (LNED) 8210040168 820924 lh,3g PDR ADOCK 05000382 p

PDR

}

I

. =

\\

JW SUGGESTED SCHEDULE FOR EMERGENCY PREPAREDNESS ACTIVITIES 1

i I

MONTH September 9, 1982 Site Drill involving the Control Room, Technical Support Center, Operations Support Center, and 1

the Emergency Operations Center.

i October 13, 1982 Site Drill involving the Control Room, Technical Support Center, Operations Support Center, and the Emergency Operations Facility.

November 17, 1982 Combined Drill for On and Off-Site Organizations.

Oa-site participants are the Control Room Tech-nical Support Center, Operations Support Center, l

Emergency Operations Facility, and the Corporate Command Center. Limited participation from both Parishes (Tabletop).

December 13, 1982 Site Drill involving the Control Room, Technical Support Center, Operations Support Center, i

Emergency Operations Facility, and the Corporate l

Command Center.

January 10, 1983 NRC Emergency Preparedness Appraisal.

l February 23, 1983 Combined Drill for On and Off-Site Organizations.

On-site participants are the Control Room, Tech-nical Support Center, Operations Support Center, t

Emergency Operations Facility, and the Corporate Command Center. Full participation by Off-Site Organizations, St. Charles Parish, St. John the Baptist Parish, Louisiana Nuclear Energy Division, and the Louisiana Office of Emergency Preparedness.

March 16, 1983 Combined Drill for On and Off-Site Organizations.

Same participants as February 23, 1983 drill.

April 13, 1983 NRC-FEMA Exercise-For-Scare.

1 i

.