....+,o ILLIN0IS POWER COMPANY ET AL.
5 DOCKET N0.-50-461-CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE j
Amendment No. 45' l
License No. NPF-62 1
1.
The Nuclear Regulatory Commission (the Commission) has found that:
L A.
The application for amendment by Illinois Power Company * (IP),
1 and Soyland Power Cooperative, Inc.L(the licensees) dated July 11, 1990, as supplemented September 12, 1990,. complies with the standards and requirements of the Atomic Energy Act of 1954, a:
amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act._-and the rules and_ regulations of the-Commission; C.
Thereisreasonable-assurance (1)thattheactivitiesauthorizedby.
this amendment can be conducted'without endangering the health and safety of the public, and (ii) that such activities will be-conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be' inimical to the common defense and security or to the health and safety of.the public; and E.
The issuance.of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have.
t j.
been satisfied.
2.
Accordingly, the license is amended by changes-to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF 62 is hereby amended to read as follows:-
- Illinois Power Company is authorized to act as agent for Soyland Power' Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
J h0 f $ ock $00bo461 P
2 (2) Technical Specifications and Eny'ironmental Protection Plan
~
The Technical Specifications contained in Appendix A and the Environmental Protection Plan. contained in Appendix B, as revised i
through Amendment No.
45, are hereby-incorporated into this license.
Illinois Power Company shall operate the facility in accordance with'the Technical Specifications'and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance..
FOR-E NUCLEAR REGULATORY COMMISSION
=
m.
John Hannon, Project Director Project Directorate III-3 Division of Reactor Projects. III, IV, Y and-Special Projects
- Office of Nuclear Reactor Regulation
Attachment:
Changes to'the Technical Specifications Dat. u, issuance:
September 17, 1990 l
l l
i F
d
=,.
4 e
v.-,
-..,-c.
1 t
i ATTACHMENT TO LICENSE AMENDMENT N0. 45 FACILITY OPERATING LICENSE'NO. NPF-62 DOCKET NO. 50-461--
Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain' vertical lines indicating the area of-change.
Remove.
Insert 3/4 8-19 3/4.8-19 3/4 8-20 3/4 8-20
- t i
i l
o I
l l
l~
e r
.n.
,p.
p.
.,,,4 w,.v
,.n,,
...,vo,w,,
w
-vu, y
-w-
ELECTRICAL POWER SYSTEMS DISTRIBUTION - OPERATING i
LIMITINGCONDITIONFOROPERATION(Continued) 3.8.3.1 ACTION (Continued):
3.
a).
With one of the above required inverters associated with IC71-5001A or.B inoperable, energize the essociated.
distribution panel within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restor: the inoperable inverter to OPERABLE and energized status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be-in at,least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD-
-SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b)
With one of the above required inverters. associated with IC71-1 S001C or D inoperable, declare the HPCS system inoperable and take the ACTION required by Specification 3.5.1.
4.
For inoperable RPS Solenoid Bus inverters:
a)
With an RPS Solenoid Bus inverter inoperable transfer the bus to the alternate power source provided the other RPS Solenoid Bus
-is not being supplied from the alternate source.
b)
With both RPS Solenoid Bus inverters;inoperablo de-energize one RPS Solenoid Bus, c)
With the. frequency of the 120V AC supply to the RPS Solenoid-buses A or B < 57 Hz, demonstrate the OPERABILIlY of all equip-ment which could have been subjected to the abnormal; frequency for all Class IE loads connected to the associated buses, by performance'of a CHANNEL FUNCTIONAL TEST or CHANNEL CALIBRATION, as required, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
For DC power distribution:
1.
With either Division-I or Division II of the above required DC distribution system not energized, re-energize the division within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or-be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.'
With Division III or Division IV of the above required DC distribution l
system not energized, declare the HPCS~ system inoperable and take the ACTION required by Specifications 3.5.1 and 3.8.4.1.
SURVEILLANCE REQUIREMENTS i
4.8.3.1.1 Each of the above required power distribution system divisions shall be determined energized at least once per 7 days by verifying correct breaker alignment and voltage on the buses /MCCs.
CLINTON - UNIT 1 3/4 8-19 Amendment No. 45
ELECTRICAL POWER SYSTEMS
\\
DISTRIBUTION - OPERATING-SURVEILLANCE REQUIREMENTS (Continued)-
4.8.3.1.2 Whenever-an RPS. Solenoid Bus is energize'd from the alternate source or.a Bus Power Monitor is inoperable, verification shall be made once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> that the supply frequency is > 57 Hz.
4.8.3.1.3 A CHANNEL FUNCTIONAL TEST shall be performed on each RPS Solenoid Bus Power Monitor at the frequency required by Specification 4.8.4.3.a.
4.6,3.1.4. At least once per 18 months a CHANNEL CALIBRATION shall be performed,
i on each RPS Solenoid Bus Power Monitor of Specification 4.8.4.3.b and associated
- g power-supply Regulating Transformer.