ML20065D016
| ML20065D016 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/29/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9404060171 | |
| Download: ML20065D016 (1) | |
Text
Stillsn Cuppirt oJpirimint s
- b A
= =-
PECO ENERGY
=;l3=_
905 Chedertimok Doulevard Wayne PA 19087 5691 1
March 29,1994 Docket No. 50452 Ucense No. NPF-39 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Umerick Generating Station, Unit 1 Technical Specification Change Request 92-08-0
" Average Power Range Monitor - Rod Block Monitor Technical Specifications / Maximum Extended Load Line Umit Analysis (ARTS /MELLLA)"
Gentlemen:
As requested in your letter dated February 10,1994, issuing Technical Specification Amendment No. 66 to Facility Operating Ucense No. NPF-39 for Umerick Generating Station (LGS), Unit 1, PECO Energy Company is hereby notifying you in writing that the ARTS /MELLLA modification was implemented during the fifth refueling outage for LGS Unit 1 and the post modification testing was successfully completed on March 18,1994. Therefore, the provisions of Amendment No. 66 to Facility Operating Ucense NPF-39, have been fully implemented as of March 18,1994.
I If you have any questions regarding this implementation, please do not hesitate to contact us.
Sincerely, I
G. A. Hunger, Jr.,
l Director Ucensing Section cc:
T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident inspector, LGS W. P. Dornsife, Director, PA Bureau of Radiation Protection 9404060171 940329 0
PDR ADOCK 05000352 l
l P