i Tennessee Vaney Aatnordv. Post Office Box 2000. $addy Dwsy. Tennesseo 37379 March 30, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 - FACILITY OkERATING LICENSE DPR SPECIAL REPORT 93 REVISED CORRECTIVE ACTION COMPLETION DATE
Reference:
Letter from Robert A. Fenech to NRC dated September 27, 1993, "Sequoyah Nuclear Plant (SQN) - Unit 2 - Facility Operating License DPR Special Report-93-16" This letter provides details concerning a revision to the corrective action completion date for the failure analysis of the diesel generator 2A actuators.
There were delays in the shipment of the actuators to the manufacturer for failure analysis and problems with the specifications for repair of the actuators. The failure analysis will be completed by May 13, 1994. The failure analysis was originally scheduled to be completed by March 31, 1994.
If you have any questions concerning this submittal, please telephone J. W. Proffitt at (615) 843-6651.
i Sincerely 5
Ken Powers Site Vice President Sequoyah Nuclear Plant cc: See page 2 k {j i
9404050281 940330
']'
PDR ADOCK 05000328-PDR S
.~
- q;%.... ;
- i U.S. Nuclear Regulatory Commission Page 2 March 30, 1994 cc
Mr. D.:E. LaBarge. Project Manager l
U.S. Nuclear Regulatory Commission One White' Flint, North 11555 Rockville Pike Rockville,-Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission l
Region II-l 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
l
.~,
,