Provides Suppl Info to TS Change Request 93-09 Re Revised Setpoints & Time Delays for loss-of-power-instrumentation
ML20065B772
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/29/1994
From: Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065B773 List:
References
NUDOCS 9404040123
Download: ML20065B772 (5)


Text

{##S_\\l ggt; &;i:-

,=

MI(i _

liid '/g,-

Qd-7

!V;

'l u

h s.

1 D; c

nl4 N

-N pf "

r,

,..,.~..:.,--.-......w.w.

c.w i.

' Tennessee Wey Authordy Post Offce Box 2000, Soddy Da sy. Ttnnessee 3/373 q

i March 29, 1994 z

U.S... Nuclear Regulatory Commission

[h, '

ATTN: Document Control Desk Washington, D.C. 20555' A:

i Gentlemen:

In.the Matter of

)

Docket Nos. 50-3'27 l

Tennessee Valley. Authority

)

50-328 SEQUOYAH NUCLM R PLANT (SQN) - SUPPLEMENTAL INFORMATION FOR TECHNICAL SPECIFICATION 018) CHANGE REQUEST 93-09 p.

O

.Referenne TVA letter to NRC dated October 1, 1993, "Sequoyah Nuclear Plant:(SQH) - Technical Specification (TS) Change 93-09,

' Revised 'Setpnints end Time Delays for the Loss-of-Power

~

Instrumentation'"

t By the abova 5 nferences TV5 submitted a TS' change request to implement new -

voltage setpoints and titra delays associated with the loss-of-power instrumentatiori; fok the auxiliary feedwater ' system and the 6.9-kilovolt j

~

shutdown boards.._On March 8, 1994, TVA'and NRC held a telephone call to.

discuss. f ottr questions raised _. by the' technical reviewer. for NRCL - TVA

~

r provided' verbal responses.to the questions and was requested to docket.

O

~

these responses along with a' copy of the supporting--TVA calculation.

Enclosure l'provides the four NRC. questions and the associated TVA.

responses. Enclosure 2'provides TVA Calculation SQN-EEB-MS-T106-0008..

There are no' commitments contained in this submittal. Please direct l

questions.concerning this issue-to K. C. Weller at (615) 843-7527.

Sincerel,

[

O Ken Powers Site Vice.Presidenti Sequoyah Nucient-Plant' e

r-Enclosures cci- 'See:page 2-

\\T

94040 01Y3 940329 q'

?

. ',,,4 2PDR!:ADOCK 050C03275"'

~

P-J

.PDR

(_

" ~

~'

Q

U.S'. Nuclear Regulatory Commission Page 2 March.29, 1994 i

l cc (Enclosure 1 only):

Mr. D. E. LaBarge, Project Manager (w/ Enclosures 1 and 2)

U.S. Nuclear Regulatory Commission i

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Da.sy, Tennessee 37379-3624 4

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101.M.rietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l

y ENCLOSURE 1-SUPPLEMENTAL TECHNICAL SPECIFICATION (TS) CHANGE INFORMATION SEQUOYAH NUCLEAR PLANT (SQN) UNITS.1 AND 2 DOCKET NOS. 50-327 AND 50-328 (IVA-SQN-TS-93-09 )

RESPONSE TO NRC QUESTIONS 9

b

+

f A

[

i i

[

'6 f'

q

, n.

,a w,

- - - - - - ~ - -- -

l q

i Question No.-1:

The normal feeder undervoltage relaying has been deleted from the_ design to support' the use of the alternate feeder breakers and because the existing function has been-incorporated into the revised loss-of-power l

instrumentation scheme.

l If the normal feeder is degraded, how long is the time delay before trcasfer to the alternate feeders? Please explain the above statement.

Answer:

The existing normal feeder undervoltage relaying only provides degraded

- l voltage protection when the normal feeder is in service.

The relaying is on the supply side of the normal feeder and would not' sense shutdown

)

board voltage with the alternate feeder in service. By moving this voltage protection to the 6.9-kilovolt (kV) shutdown board' bus, the degraded voltage protection will be available regardless of the supply source (normal or alternate).

This change will allow the use of either-i feeder without a change in the voltage protection.

It will support SQN's

]

use of the alternate feeder, which has not been allowed with the present-1 voltage puotection design.

j

'l The SQN design.does not have an automatic transfer from the normal to alternate 6.9-kV shutdown board feeder or back.

This modification to the voltage relaying does not affect the SQN design for trcnsfers between normal and alternate feeders, which are only manually activated.

Transfers from the normal feeder to the alternate are initiated by the operator in accordance with plant procedures; no automatic time delays are included in the transfer controls.

]

Question No. 2:

Has the calculations for the degraded voltage value been taken down to 120-volt (V) level?

l Answer: Yes The safety-related 120-V distribution system is powered from'the vital inverters, and Calculation SQN-EEB-MS-T106-0008 ensures that the input voltage to the inverters is within tlie required range when the safety-related boards are at the minimum allowable steady-state operating voltage (i.e., 6400 V at the 6.9-kV shutdown botris). Design calculations have previously assured proper op.*

ing voltages to the

.120-V components based on the regulated.inverte output voltage. The voltages to the 120-V components, powered f ron. motor control center control power transformers (CPT), are evaluated in SQN-APS-010,." Class 1E Motor Control Center (MCO)-Undervoltage Calculation." Calculation SQN-EEB-MS-T106-0008 evaluated the.CPT fuses to ensure they could carry j

the starter inrush current.during degraded voltage conditions for the accident time delay limit (i.e., 11.5 seconds).

y

)

- l Question'No. 3:

What type of field verification was done to validate the data used for degraded voltage calculation?

Answer:

Calculation data was based on existing "as-constructed" calculations

)

including the SQN electrical calculation database (TVA electrical auxiliary system). This data is generally based on field walkdowns, j

especially the load and cable data for the safety boards. Where field

.I data was not available, manufacturer's data and/or conservative typical data from TVA design guides was used. 'The electrical load management-1 system for alternating current software, used to perform the voltage analysis, had been previously validated by test in accordance with NRC Branch Technical Position PSB-1.

Question No. 4:

What controls will be used in the future to update the calculation if bus loads change? How will it be determined if increased bus loading is a concern?

Answer:

SQN Site Standard Practice 9.3, " Plant Modification and Design Change Contrvi," requires that an evaluation be performed for each modification to determine what electrical calculations are affected. The site Electrical Engineering Group reviews the affected electrical calculations. A quality assurance computer program is used to track the revision levels of the calculations and the associated design changes.

- i Any additional loading added by a modification to the plant will be l

evaluated and the degraded voltage relaying setpoints will be revised, if necessary, to ensure sufficient voltage to all engineered safety features.

b t

i I

,