ML20065B707

From kanterella
Jump to navigation Jump to search
Forwards Revised ABWR Ssar/Certified Design Matl Cross Ref Matl for GE ABWR
ML20065B707
Person / Time
Site: 05200001
Issue date: 03/31/1994
From: Quirk J
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20065B710 List:
References
MFN-039-94, MFN-39-94, NUDOCS 9404040096
Download: ML20065B707 (2)


Text

f. ,

f

. GE Nuclear Energy -

b rt vYbn Jose.CA 95125 MFN 039-94' .

j Docket No.52-001 ,

March 31,1994 Document Control Desk  !

U. S. Nuclear Regulatory Commission ,

Washington, D. C. 20555 Attention: R. W. Borchardt, Director  :

Standardization Project Directorate ,

Subject:

Submittal of Revised SSAR/CDM Cross Reference Material 1' forthe GE ABWR

Reference:

1) GE Letter to Document Control Desk, Attention Jerry N. Wilson,.

subject," Submittal of SSAR/ Tier 1. Cross Reference Material ~

for the GE ABWR," dated September 30,1993, MFN No.157- -

93, Docket No. STN 52-001

2) GE Letter to Document Control Desk, Attention R. W. Borchardt, subject," Submittal of Amendment 34,'Non-Proprietary Information to GE's ABWR SSAR and Certified Design Material, Revision 3," dated March 31,1994, MFN No. 033-94, Docket No.52-001' Reference 1 submitted Standard Safe.ty Analysis Report (SSAR)/ Certified  :

Design Material (CDM) cross reference material for the ABWR. This material consists of tables which identify the relationship between SSAR safety analysis -

assumptions and the Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) defined in the ABWR CDM.

GE has revised these tables to reflect: a) the ABWR design as defined in the ABWR SSAR Amendment 34,23A6100 Revsion 4, (Reference 2) and b) the revised ABWR ITAAC entries in CDM Revision 3,25AS447, (Reference 2).

Enclosed are thirty-four (34) copies of the revised cross reference' material. This  ;

attached information is consistent with ABWR SSAR Tables 14.3-1 through 14.3-10. Per earlier GE/NRC agreements, the cross reference' material will not -  !

be included in either the ABWR SSAR or the Design Control Document (DCD).'

060 9404o40096 940331 1 1 .

PDR: ADOCK 0520 ,

.A

[ _

{

GENuclear Energy .

~

(;eneral[kwic Comoant

!?S Curtner A,"enue. San Jose CA 95125 As always, GE personnel will be available to provide clarification of this material and to answer any questions the staff may have.

Sincerely, p F o B-J.(, Quirk, Project Manager ABWR Cerification Program Mail Code 782, Phone (408) 925-6219 enclosure cc: N. D. Fletcher (DOE)

T. A. Boyce(NRC)

J. A. Beard (GE-Rockville)

J. N. Fox (GE)

R. Louison (GE)

F. M. Paradiso (GE) 2