Responds to Review of Generic Letter 89-13 Implementation of Vermont Yankee Nuclear Power Corporation Service Water Self Assessment
ML20065B595
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/29/1994
From: Pelletier J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-37, GL-89-13, NUDOCS 9404040057
Download: ML20065B595 (2)


Text

__

ob

.,'VURMONT YANKEE NUCLEAR POWER CORPORATION

. - A s.

Ferry Road, Brattleboro, VT 05301-7002

\\'

suety to ENGINEERING OFFICE r

580 M AIN ST RE ET BOLTON, MA 01740 i

s (508) 779 4711 March 29,1994 BVY 94-37 l

United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a)

License No. DPR-28 (Docket No. 50-271)

(b)

Letter, USNRC to All Holders of Operating Licenses or Construction Permits for Nuclear Power Plants, NVY 89-156, Generic Letter 89-13, dated 7/18/89 (c)

Letter, VYNPC to USNRC, BVY 90-007, Response to Generic Letter 89-13, dated January 22,1990 (d)

NRC Information Notice 94-03, Deficiencies identified During Service Water Operational Performance inspectioes, dated January 11,1994 l

Subject:

Review of Generic Letter 8913 Implementation, Vermont Yankee Servico Water Self Assessment l

By letter dated January 22,1990 (Reference (c)], Vermont Yankee provided a description of plans and programs that addressed the issues described in Generic Letter 89-13. We have recently completed a Self Assessment of our Service Water System, including a review of our program to meet Generic Letter 89-13 which identified that several aspects of our program do not fully meet-the intent of the i

Generic Letter.

Specific weaknesses include lack of formal procedures for testing of equipment, weak maintenance practices to ensure Service Water System components are properly

-i maintained, lack of technical evaluations to establish inspection and maintenance frequencies, and weak design reviews to ensure the Service Water System would operate properly under all design basis configurations.

C @ O l' S 94o404oo57 940329 PDR ADOCK 0500o271

.P PDR

.~..

vt Ruom YANKEL NucaAR Pom R CCdwCRAHON T

United States Nuclear Regulatory Commission March 29,1994 Page 2 Following the completion of this Self Assessment, Vermont Yankoo assigned a

. dedicated project team to evaluato the issues identified in the Self Assessment which' will include a detailed evaluation of the Vermont Yankee program to meet Generic Lotter 8913. This project team is currently in place and developing action plans and milostonos to address these issues.

Additionally, the team will be reviewing.

Information Notice 94-03, [ Reference (d)) to ensure our program is completo. An updated response will be provided on Generic Lotter 89-13 once a definitivo plan has boon established.

Vermont Yankoo will submit a complete response to Generic Lottor 89-13 no later than the end of 1994. Wo trust that the information contained in this lotter is satisf actory; however, should you have any questioris or require additionalinformation, please do not hesitato to contact us.

Sincerely, VT YANKEE NUCLEAR POWER CORP, irnak<b j

James P. Pelletier Vice President, Engineering l

i cc:

USNRC Region I Administrator USNRC Resident inspector VYt'PS USNRC Project Manager - VYNPS l

I