DESIGIATEDOdIGIUAL Certified By N
~'
i GPU Nuclear
!gewarRp Nuclear n.f cowiewr. 0c sp y..a t *g.57 m
~"
La" 717.c44 762:
i "kTI M N WntC* s Caect 0.at Number 717-94E-8003 r bruary 11. M S.*l 3200-E3-059 j
e u
Y,r. Roneid' C. F.aynen.JppippschAd:::inistrator Office 6f'Inspcterlo. and inforcerent h eicu a o
Nuclear !;e: uint er. i..':-.be we j
631 Park Avenue
{
King of Prussia, PA liN.Of f
Kuhjcet:
Licensee Event Report No.53-003 Lear P.r. !!avnes :
{
1 i.e : Operating Licencoe DPR-50
(
Doriet 50-289 l
Tr.15 telecoPY 15 to CCnfirti the CJnversatien between ?ir.
T. Toum*, Ret. ion 1 NRC and *:r. X. $ElECn SuDCrViSOY I.* nit i Review Prograc.,'IMI-1, at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> en
?ccruary li, 1953, lhe event den;ribed belov var, declared reportabic at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.
At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> er 2.'10/c'I. initi.e.1 disasse.ble and inspection of the Power Oncrated trIief valve O'C-RV2) was ce=riered).
This insuection was beins performed te con-
- tire that the corresion reper:ed w the NRC by LER No. P2-Oli on an earlier redel of this valve was not recurring it. T'!I-l's c xtended cold shutdown environment. This ir.spection has identified ths:. cerrosien hn= occurred in the ineonel and :::artenr.1 tc steel parts in the presently installed valve.
Furthermore, althour.n the main vr.lyc disc van found ir. the enid position, the pilet valve piston and sprins were. found q
corroded $n the full ooen position.
The corroded condition of this valve is considered to require tenedini action er corrective :aeasures to prevent potential n:alfunction of this valve, and iac considered rn he reportable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance.with Ter.hnical Spee!fier.tien 6.9. A.9.
This was determined to be reportable at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> February 11,1983 by T?:T-1 Pinnt Reviev Group.
o v-1 Ts11ere analysis of the cerroded parts is beine. intiated to determine the cause and l
utprepriate corrective ar.tions necesr.nr. tr. assure future valve onerabilitv.
1 It.e detalis of this occurrence and the corrective actions to prevent its. recurrence vill be provided within 14 days.
- f. -,
I L
j pft 1[... oni c e
Opirations & ?!aintenance
'ifrceter. DtI-1 I
- ). h. davereaty.
n Y. T. u.i
\\
8302230225 830211
~
PDR ADOCK 05000289 i
PDR r
1 S
Gr.. '. : - or
- # c'
.*v
,. :..:. <, 4 e 5.ty -
W 3
.x e._.f. -., p.s, g 4 2.-
3..
- . 7 _ 3
- 1.,
,a..
3
.s,.,..
.