ML20065A851
| ML20065A851 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/10/1983 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50-55E, 10CFR-50.55E, RGB-14-358, NUDOCS 8302220237 | |
| Download: ML20065A851 (1) | |
Text
.
k GULF STATES UTILITIES COMPA2VY POST O F F I C E O o x 2 9 51. BEAUMONT. TEXAS 77704 AREACoDE 713 838-6631 February 10, 1983 i~
RBG-14,358 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and' Enforcement g @h h k/ll(f,r-~
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011.
' 'i i
l
Dear Mr. Collins:
I41983 b
2
.c
~~'~ ~~ ~ -
River Bend Station Unit 1 Docket No. 50-458-Interim Report /DR-91 On January 11, 1983, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially. reportable under 10CFR50.55(e). GSU is currently evaluating the misapplication of a Bethlehem Steel load indicating washer in a structural steel slip connection in the Reactor Containment (DR-91). This condition was clarified in a telephone conversation with Region IV on February 10, 1983.
GSU has not completed its investigation. An interim or final status report will be provided by April 12, 1983.
Sincerely, h
i}
[kJ.E. Booker Manager-Engineering, j
Nuclear Fuels & Licensing i
River Bend Nuclear Group JEB/
/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
[
R. L. Brown (SRI)
I 8302220237 830210 PDR ADOCK 05000458 PDR g
_ -...-.----. -.....-,-...--