ML20065A851

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Misapplication of Bethlehem Steel Load Indicating Washer in Structural Steel Slip Connection in Containment.Initially Reported on 830111.Investigation Incomplete.Next Rept to Be Submitted on 830412
ML20065A851
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/10/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50-55E, 10CFR-50.55E, RGB-14-358, NUDOCS 8302220237
Download: ML20065A851 (1)


Text

. . .

k GULF STATES UTILITIES COMPA2VY POST O F F I C E O o x 2 9 51 . BEAUMONT. TEXAS 77704 AREACoDE 713 838-6631 February 10, 1983 i~ RBG-14,358 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and' Enforcement g i

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011.

@h h k/ll(f,r-~ ' 'i '

l ,

Dear Mr. Collins:

I41983 b

2

~~'~ ~~ ~ -

.c River Bend Station Unit 1 Docket No. 50-458- _ _ _ _

Interim Report /DR-91 '

On January 11, 1983, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially. reportable under 10CFR50.55(e). GSU is currently evaluating the misapplication of a Bethlehem Steel load indicating washer in a structural steel slip connection in the Reactor Containment (DR-91). This condition was clarified in a telephone conversation with Region IV on February 10, 1983.

GSU has not completed its investigation. An interim or final status report will be provided by April 12, 1983.

Sincerely, h

i}

[kJ.E. Booker Manager-Engineering, j Nuclear Fuels & Licensing i River Bend Nuclear Group JEB/ /kt

cc
Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission
Washington, D. C. 20555

[

R. L. Brown (SRI) I 8302220237 830210 PDR ADOCK 05000458 PDR g

-. - . . - . . - - . - - . . - . . - - - - . - -- .- --._ _ -...- .----. - .....-,-...--