Comments on Draft Final Rept Reactor Safety Study Methodology Applications Program (Rssmap):Calvert Cliffs 2 PWR Power Plant. Interim Reliability Evaluation Program Provides More Comprehensive View of Core Melt Probabilities
ML20065A819
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/07/1982
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8209140128
Download: ML20065A819 (2)


Text

_

BALTIM O RE GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475. BALTIMORE, MARYLAND 21203 AMHUR E. LUNDVALL, JR.

bepteMber 7,!9b2 Vice PassiotPsi SuPPLv c 9 - >\\A 2

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:

Mr. Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing

Subject:

Reactor Safety Study Methodole;ty Applications Program

Reference:

Letter from 3. A. Tiernan to G. R. Burdick dated 3/5/82 Gentlemen:

Baltimore Gas & Electric Company (BG&E) welcomes the opportunity to comment on the draft final report of the Reactor Safety Study Methodology Applications Program (RSSMAP): Calvert Cliffs #2 PWR Power Plant. As you are aware, we had previously submitted comments on an earlier draf t of the report (see Reference).

BG&E recognizes that the RSSMAP was not intended to accurately predict core melt probabilities at Calvert Cliffs Unit 2 but, rather, to provide a comparion of the likelihood of core melt at Calvert Cliffs relative to (e.g., greater than or less than) that at another PWR plant (Surry) which had been analyzed in detail by the Reactor Safety Study. Inasmuch as the RSSMAP was conducted using FSAR vintage information without the benefit of updated design information and without continual feedback between SANDIA and BG&E, we do not feel that the RSSMAP Report represents any more than a guide to those areas of plant design where the greatest gains might be made in reducing core melt frequency. The RSSMAP Report does not represent conclusive evidence that any design changes are needed or that core melt frequency is above an acceptable level.

BG&E also recognizes that the usefulness of the RSSMAP Report from the licensee's and regulator's viewpoints has been greatly diminished by the fact that a more

.-igorous study, the Interim Reliability Evaluation Program (IREP), was performed on Calvert Cliffs Unit 1, which has an essentially Identical nuclear steam supply system to that of Unit 2.

Finally, BG&E recognizes that the RSSMAP Report exists and that, taken alone, it could be construed as a definitive document identifying design weakness which may need timely attention. For this reason, principally, we acknowledge the need for the NRC Staff to produce a Safety Evaluation of the RSSMAP Report including a resolution of any identified design issues.

8209140120 820907 PDR ADOCK 05000318 P

PDR l

h O

Mr. R. A. Citrk Srptember 7,1982 In support of the NRC Staff's efforts to conduct their evaluation of the RSSMAP Report, and in the interest of making the information therein as accurate as possible (within the limits of the study), we offer the following comments:

1)

The transient initiation frequency for total loss of feedwater should be 0.5/yr as opposed to the 3.0/yr used in RSSMP. Data for transient initiation should be consistent with EPRI Document NP-2230. This will reduce the transient incidence by a factor of 6.

2)

Requantification of the auxiliary feedwater (AFW) system unavailability using current, more realistic estimates for components in use reduces unavailability by a factor of 5.

3)

Requantification of diesel generator (DG) unavailabilities, which appear to be in error in table B.13.ll, results in a reduction in DG unavailability by a factor of 2.

The net effect of these requantifications reduces the incidence of core melt from 2E-3 to about IE-4 per year.

Note that this requantification takes no credit for the proposed AFW system modification.

As mentioned above, we believe that the IREP study provides a more comprehensive view of the core melt probabilities at Calvert Cliffs and, in esence, supersedes the RSSMAP Report.

We would be happy to discuss our comments with you in greater detail at your convenience.