ML20065A688

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1983
ML20065A688
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/02/1983
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20065A680 List:
References
NUDOCS 8302220131
Download: ML20065A688 (4)


Text

...

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JANUARY, 1983 On January 14, 1983, Unit I was shut down for the Cycle 4 - Cycle 5 refueling outage.

The following safety-related maintenance was periormed in the month of January:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced Containment personnel hatch cam bearing.

3.

Performed monthly preventive maintenance on spent fuel cask crane.

8302220131 830214 PDR ADOCK 05000348 R

PDR

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 2/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 699-5156 OPERATING STATUS

1. Unit Name:

J seph M. Parley - Unit 1 Notes

2. Reporting Period:

January, 1983 1). Cumulative data since

3. Licensed Thermal Power (MWt).

2652 12/01/77, date of

4. Nameplate Rating (Gross MWe).

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

844.6 803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

N/A This Month Yr. to-Date

'CuAulatise 744 744 45,312

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 332.5 332.5 28,480
13. Reactor Reserve Shutdown Hours 0

0 3,614.5

14. Hours Generator On-Line 332.5 332.5 27,600.7
15. Unit Reserve Shutdown Hours 0

0

'O

16. Gross Thermal Energy Generated (MWH) 794.698 794.698 69.284,747
17. Gross Electrical Energy Generated (MWH) 252,948 252,948 22,026,496
18. Net Electrical Energy Generated (MWH) 234,064 234,064 20,674,284
19. Unit Service Factor 44.7 44.7 60.9
20. Unit Availability Factor 44.7 44.7 60.9 39.1 39.1 56.8
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 37.9 37.9 55.0
23. Unit Forced Outage Rate 0.0 0.0 18.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 29. 1983
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPER ATION 12/01/77 12/01/77 (9/771

,3.%

, c.

, m..,,

. ~,,,..,...,.,.

DOCKET NO. 50-348 UNIT 1

DA'II, 2/02/83 I

W. G. Hairston, III COMPLETED BY TELEPl!ONE (205) 899-5156

""*U MONT11 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 789 37 0

g, 0

785 33 2

3 775 g9 0

4' 757 20 0

0 744 21 5

734 0

6 22 7

72'i 23 0

720 0

e-g 24 9

708 25-0' 10 698 26 0

0 686 n

11 677 0

12 j

13 657 3

0 0

34 532 30 y

IS 0

33 0

16 0

INSTRUCIl0NS On this fonnst. list the svenge daily unit power levet in MWe Net for each d:y in the reportmg rnonth. Compute to j

, the neare:t whole nr;2 watt.

(9(77) l

[

l I

y a_-.

-~

b DOCKETNo. 50-348 UNIT SilVTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farley-Unit 1 DATE 2/02/83 COMPLETED fly W.G.Hairston,III REPORT Af0NTil JANUARY TEl.EPilONE (205) 899-5156 e.

E a

,5 E

}

E}

Licensee h

h Cause & Curreceive No.

Date g

3g 71

.c E a:

Event gy ni Action to H

jE 5

U gg g Repor: #

fO mU Pacvent Recurrence 5

012 830114 S

411.5 C

3 NA NA NA Unit was shut down for Cycle 4 - Cycle 5 refueling outage. While ramping down for the scheduled outage, the Reactor tripped prematurely due to low steam generator level.

1 2

3 4

F: Forced Reason; hiethod:

Exhibit G. instructions S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee C-Refueling 3.Autunutic Scram.

Event Report (1.FR) File INUltEG-D-Ilegulasmy Restriction 4-Ot her (E xplaies) 0161)

L:-Operator Training & IJcense Examination F Adeninistrative 5

G Operational bror (Explain)

Exhibit I Same Source 19/17) 11 Other 11:xplain)

-