ML20065A688
| ML20065A688 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/02/1983 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20065A680 | List: |
| References | |
| NUDOCS 8302220131 | |
| Download: ML20065A688 (4) | |
Text
...
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JANUARY, 1983 On January 14, 1983, Unit I was shut down for the Cycle 4 - Cycle 5 refueling outage.
The following safety-related maintenance was periormed in the month of January:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced Containment personnel hatch cam bearing.
3.
Performed monthly preventive maintenance on spent fuel cask crane.
8302220131 830214 PDR ADOCK 05000348 R
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 2/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 699-5156 OPERATING STATUS
- 1. Unit Name:
J seph M. Parley - Unit 1 Notes
- 2. Reporting Period:
January, 1983 1). Cumulative data since
- 3. Licensed Thermal Power (MWt).
2652 12/01/77, date of
- 4. Nameplate Rating (Gross MWe).
860 commercial operation.
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
844.6 803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to-Date
'CuAulatise 744 744 45,312
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 332.5 332.5 28,480
- 13. Reactor Reserve Shutdown Hours 0
0 3,614.5
- 14. Hours Generator On-Line 332.5 332.5 27,600.7
- 15. Unit Reserve Shutdown Hours 0
0
'O
- 16. Gross Thermal Energy Generated (MWH) 794.698 794.698 69.284,747
- 17. Gross Electrical Energy Generated (MWH) 252,948 252,948 22,026,496
- 18. Net Electrical Energy Generated (MWH) 234,064 234,064 20,674,284
- 19. Unit Service Factor 44.7 44.7 60.9
- 20. Unit Availability Factor 44.7 44.7 60.9 39.1 39.1 56.8
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 37.9 37.9 55.0
- 23. Unit Forced Outage Rate 0.0 0.0 18.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 29. 1983
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPER ATION 12/01/77 12/01/77 (9/771
,3.%
, c.
, m..,,
. ~,,,..,...,.,.
DOCKET NO. 50-348 UNIT 1
DA'II, 2/02/83 I
W. G. Hairston, III COMPLETED BY TELEPl!ONE (205) 899-5156
""*U MONT11 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 789 37 0
g, 0
785 33 2
3 775 g9 0
4' 757 20 0
0 744 21 5
734 0
6 22 7
72'i 23 0
720 0
e-g 24 9
708 25-0' 10 698 26 0
0 686 n
11 677 0
12 j
13 657 3
0 0
34 532 30 y
IS 0
33 0
16 0
INSTRUCIl0NS On this fonnst. list the svenge daily unit power levet in MWe Net for each d:y in the reportmg rnonth. Compute to j
, the neare:t whole nr;2 watt.
(9(77) l
[
l I
y a_-.
-~
b DOCKETNo. 50-348 UNIT SilVTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farley-Unit 1 DATE 2/02/83 COMPLETED fly W.G.Hairston,III REPORT Af0NTil JANUARY TEl.EPilONE (205) 899-5156 e.
E a
,5 E
}
E}
Licensee h
h Cause & Curreceive No.
Date g
3g 71
.c E a:
Event gy ni Action to H
jE 5
U gg g Repor: #
fO mU Pacvent Recurrence 5
012 830114 S
411.5 C
3 NA NA NA Unit was shut down for Cycle 4 - Cycle 5 refueling outage. While ramping down for the scheduled outage, the Reactor tripped prematurely due to low steam generator level.
1 2
3 4
F: Forced Reason; hiethod:
Exhibit G. instructions S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee C-Refueling 3.Autunutic Scram.
Event Report (1.FR) File INUltEG-D-Ilegulasmy Restriction 4-Ot her (E xplaies) 0161)
L:-Operator Training & IJcense Examination F Adeninistrative 5
G Operational bror (Explain)
Exhibit I Same Source 19/17) 11 Other 11:xplain)
-