_ _ _ _ _ _ _. _ _ _ _ _ -..
t
,n "le.a W
2 r
Telecopy (4 Nuclear Construction Omsion September 1, 1982 Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Mr. R. Haynes Administrator
SUBJECT:
Beaver Valley Power Station - Union No. 2 Docket No. 50-412 Sheared Pinion Keys in Limitorque Motor Operators
REFERENCE:
NS-EPR-2637, of 8/6/82, " Substantial Safety Hazard as Defined in 10-CFR Part 21 for Potentially all Westinghouse Plants" Gentlemen:
Per the above reference, the NRC was notified by Westinghouse on August 6, 1982, that sheared pinion keys in Limitorque motor operators had been discovered during field modifications / inspections of this equipment.
Westinghouse notified Duquesne Light Company (DLC) of the problem on August 12, 1982. Upon notification, DLC began analysis concerning poten-tial reportability of this problem under 10CFR50.55(e) in accordance with the applicability to Beaver Valley Unit 2.
Upon completion of this evaluation, DLC plans to issue a report, interim or final, describing the details of the problem as they relate to Beaver Valley Unit 2.
It is expected that this report will be submitted to Region 1 by May 20, 1983.
DUQUESNE LIGHT COMPANY D
)
/;
By M
IvW E. JJ Woolever Vice President JMM/maz cc:
Mr. R. DeYoung, Director, Office of Inspection and Enforcement (3)
NRC Document Control Desk Mr. G. Walton, NRC Resident Inspector Ms. E. Doolittle, Project Manager 8209130059 820904 PDR ADOCK 05000412 p tg S