ML20064M195

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration. Only Westinghouse Penetrations Used at Facility
ML20064M195
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/27/1983
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-SSINS-6820 GO2-83-75, IEB-82-04, IEB-82-4, NUDOCS 8302150489
Download: ML20064M195 (2)


Text

~

Docket No. 50-397 Bulletin Reply 82-04 4p a

Wil@

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-8000 O.

fq% 'n

'<n

  • /

January 27, 1983 GO2-83-75 Mr. R.H. Engelken Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Subject :

NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397 NRC IE BULLETIN NO. 82-04, DEFICIENCIES IN PRIMARY CONTAINMENT ELECTRICAL PENETRATION The subject bulletin identified a problem relative to electrical penetrations supplied by the Bunker Ramo Company.

Requested action included 1) to take appropriate action with respect to deficiencies found if WNP-2 utilizes hard epoxy containment electri-cal penetration assemblies manufactured by the Bunker Ramo Company, or 2) submitting reports stating that such assemblies are not used at WNP-2.

Regarding the requested action, WNP-2 utilizes only Westinghouse penetrations.

Therefore, the problem addressed in the subject bulletin does not apply to Supply System Nuclear Project No. 2.

Ji 2ilD

.G Matlock Program Director, WNP-2 ecmm cc: W.S. Chin A.

Forrest N.D. Lewis J.

Plunkett R.E. Snalth A.

Toth Document Control Desk, NRC WNP-2 Files

(

8302150489 Bs0127 L

PDR ADOCK 05000 0

... c a

o ATTACHMENT SUPPLY SYSTEM RESPONSE TO IE BULLETIN 82-04 STATE OF WASHINGTON

)

)

COUNTY OF BENTON

)

ROBERT G. MATLOCK, Being first duly sworn, deposes and says: That he is the WNP-2 Program Director of the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the permit holder herein; that he is authorized to submit the foregoing on behalf of said permit holder; that he has read the foregoing and attachments listed therein and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED:

j e,v s,,,t 1/

, 1983 3

i R.G.(A1ATLOCK On this day personally appeared before me R.G. Matlock to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned, GIVEN under my hand and seal thisef day of b.ff u g A (/,1983.

V

(

YHe d, YWbsoxbu Notary Pu pic in and for the State of ffsb hk e

t

/

_ _ _ _ _ _