t '
i +
f k
Tennessee va ey vou rou cese su ma sa;av na+y Ten ecee 3r379 n
March 21, 1994 l
1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAll NUCLEAR PLANT (SQN) - UNIT 1 - REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST (CILRT)
Enclosed is the summary technical report on the CILRT for SQN Unit 1 conducted December 17-20, 1993. This report is being submitted for your review in accordance with 10 CFR 50, Appendix J Sections V.B.1 and V.B.3.
The "as-found" and "as-left" acceptance criteria is 0.1875 percent per i
day.
The reportable as-found mass lerk rate for the CILRT was 0.1980 percent per day and was attributed to the breakage of 0-ring seals on Penetration X-79B that occurred during replacement of the penetration flange approximately two weeks before the conduct of the CILRT.. The reportable as-left leak rate was 0.1306 percent per day.
)
Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.
Sincerely l
6 Ken Powers Site Vice President Sequoyah Nuclear Plant Enclosure
/
1 cc:
See page 2
/
p5 j
)
j i
J 250008 94032800,4 94o321 PDR ADOCK 05000327 P
PDR((
j
.~
U.S. Nuclear Regulatory Commission Page 2 March 21, 1994 cc (Enclosure).
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant i
2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 L
e 4
4 4
1 m
l I
ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 REACTOR BUILDING CONTAINMENT INTEGRATED LEAK RATE TEST CONDUCTED DECEMBER 17-20, 1993 (S57 940309 890)