Mailing Address Al;bim2 Power Comp:ny A '
y % North 18th Street Post Offics Box 2641 Birmingh m, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
b Senior Vice President Flintridge Building Alabama Power the southem electrc system Janua ry 17, 1983 Docket No. 50-364 LJ 1._
U. S. Nuclear Regulatory Commission I
Region II, Suite 3100 7c 101 Marietta Street N. E.
Atlanta, GA 30303 m
FG Attention:
Mr. J. P. O'Reilly, Administrator
.c-CO Joseph M. Farley Nuclear Plant - Unit 2 IE Bulletin Number 82-02 Gentlemen:
In accordance with IE Bulletin 82-02, subject:
" Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants," the following is submitted:
NRC REQUEST:
l Submit a statement that where procedures do not exist, develop and implement maintenance procedures for threaded fastener practices.
These procedures l
should include, but not [be] limited to the following:
(1) maintenance crew training of proper boltinc/ stud practices, tools application, specifications and requirements, (2) detensioning I
and retensioning practices (torque iteration),
specified tolerances, and other controls for disassembly and reassembly of component closure / seal connections, (3) gasket installation and controls, and (4) retensioning methods and other measures to eliminate reactor coolant leakage during operation.
l 8302150009 930117 PDR ADOCK 05000364 u
ppg 5[$ 65 [ {
si,-
'~
Mr. J. P. O'Reilly Janua ry 17, 1983 Page 2 Quality assurance measures should also be established for proper selection, procurement, and application of fastener lubricants and injection sealant compounds to minimize fastener susceptibility to SCC environments.
APC0 RESPONSE:
The above required maintenance procedures and quality assurance measures have been established and incorporated into Farley Nuclear Plant procedures.
NRC REQUEST:
Threaded fasteners of closure connections, i6entified in the scope of this bulletin, when opened for component inspection or maintenance shall be removed, cleaned, and inspected per IWA-2210 and IWA-2220 of ASME Code Section XI (1974 edition or later) before being reused.
Identify the specific connections examined and provide the results of this examination.
APC0 RESPONSE:
The belo, listed threaded fasteners of closure connections were routinely opened for component inspection / maintenance during the recent Unit 2 refueling outage with the following results:
Closure Type of Des cri pti on Examination Results Steam Generators A, Removed - Wet No degradation B and C Hot and Magnetic Particle Cold Leg Manways and Visual Reactor Coolant Removed - Wet No degradation Pumps B and C #1 Magnetic Particle, Seal Housing Ultrasonic and Visual 4
Hi/Lo Head SI Check Removed - Wet No degradation Valve Q2E11V051A Magnetic Particle and Visual
g * ~ d.*
Mr. J. P. O'Reilly J anua ry 17, 1983 Page 3 This completes Alabama Power Company's Unit 2 requirements for IE Bulletin Number 82-02.
If you have any questions, please advise.
Yours very truly, F. L. Clayton, J r.
FLCJ r/ JAR :mj h-D33 cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. S. A. Varga SWORN T0 )ND SUBSCRIBED BEFORE ME Mr. E. A. Reeves THIS /72 DAY OF, /u Mr. W. H. Bradford
,1983
' ~~A k i k h imi --
Nbta ry Ptrbli c My Commission Expires lo 17 RC*
/
/