Text
.
=
!(0 i
PHILADELPHI A ELECTRIC COM PANY e
r ca m
y Ll 2301 M ARKET STREET
>O P.O. BOX 8699 7, :
e,'-
9't PHILADELPHI A. PA.19101
,y 1.
s.-
ima.osi.':caua66 ;
i2isi e41.sooi
~!uE?I,5YaNNison G
12 Decenber 1,
1980 Re: Docket ?io s. 50-277 50-278 IE Bulletin 80-17 9
1 1
I
)
Mr. Boyce H.
Grier, Director Office of Inspection and Enforcement Region I US fiuclear Regulatory Commission 631 Park Avenue
]
King of Prussia, PA 19406
Dear r. Grier:
This letter concerns the Confirmatory Orders for Peach Botton Units 2 and 3 sent by Victor Stello to S.
L.
Daltroff on October l
2, 1980 that require certain actions to be completed by December g-1, 1980.
These actions are restated below.
III.
1.
By December 1,
1980, the licensee shall:
a)
Install and make operable a system to continuously monitor water levels in all scram discharge volumes ( S DV-).
b)
The installed system shall provide for level-I indication, with an associated alarm, in the control room, for each SDV.
This equipment shall provide sufficient-information to the reactor operator such'that.if water 3
j accumulates in either SDV the decision about actions to be taken can be made in a timely fashion from the control room.
e THIS DOCUh1ENT POOR' QUALITY PAGES
!8i0203OSM4
n Og
{
' 'i r. Eoyce 11. Grier, Director
' a s; e 2 i
This letter is to confire that as of !!ovember 29, 1980 Peach
- Ectton Units 2 and 3 have operable systens to continuously l
conitor water level in scran discharge volumes that fulfill the i
above requirements.
l i
If you have any questions or require additional infornation, i
' do not hesitate to contact us.