Requests Extension of Concurrent Cycle Start Date from 800101 to 800701
ML20064K432
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/24/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8012300296
Download: ML20064K432 (2)


Text

__

TENNESSEE VALLEY AUTHORITY cHAWMEiknIft"HEPHE %i&k II N M r 24, 1980 a

s:

3 Director of Welear Reactor mgulation C')

~

r-e _

Attention: Mr. Sanas A. Ippolito, Chief si'a I$

j-Branch No. 3 f-ijk L;;-

Division of Operating Beactors Q"

E c5j U.S. NLclear Regulatory Ocamission 5

g h@

Washington, DC 20555 M

M O

E Dear Mr. Ippolito In the Matter of the

)

Docket fes. 50-259 w nnessee valley hithority

)

50-260 50-296

'Iennessee Valley N'thority (WA) subnitted, by letter, to you on July 11, 1979, a request to establish ocncurrent cycles for ASC Section XI inservice inspections and tests at Browns Perry Nuclear Plant. Wat request proposed to establish a ocumencement date of January 1,1980, for the second 40-aonth inspection cycle for all three units. D e concurrent cycle-start date of January 1,1980, was proposed because it involved approximately equal and opposite shifts in time for the start dates of units 1 and 3 and a negligible l

shift in time for unit 2.

We original start dates for the second 40-month cycle were based on ending dates for the first 40-month cycle. Fading dates for the first 40snonth cycle were based on criteria fran the 1974 Mition of Section XI (1WA-2400). Ibwever, units 1 and 2 inspection requirenents for the first 40-mmth cycle were based on the 1971 Mition of Section XI. First cycle ea3ing dates for units 1 and 2 should be based on the 1971 M ition of Section XI (IS-241).

Based on the requirements of the 1971 E ition of Section XI and the fire restoration outage, the date for comencement of the second 40-month cycles for units 1, 2, and 3 should have been December 1,1979, July 1,1980, aryl 0 OM THIS DOCUMENT CONTAINS An Equal opportunity Employer P00R QUAllTY PAGES

4_

. Mr. Ippolito e r 24, 1980 July 1, 1980, respectively. 'therefore, instead of a January 1,1980, date as previously proposed in our July 1979 letter, we request a concurrent cycle 4

start-date of.nzly 1,1980, for units 1, 2, and 3 at Browns Ferry Nuclear Plant.

Wry truly yours, p VAILEY XTIf0RITY l,

N I.. M. Mills, s nager melear negulation and safety albscr sworn before me this of 1980.