ML20064K415
| ML20064K415 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/14/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20064K422 | List: |
| References | |
| NUDOCS 9403230103 | |
| Download: ML20064K415 (1) | |
Text
,
Stillin cupp:rt D,cirtmim' g,g 1
_e PECO ENERGY rafrs=;L 965 Chesterbrook Boulevard Wayne, PA 19087-5691 March 14,1994 Docket Nos. 50-277 50-278 Uconse Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 3 Evaluation of Core Shroud Indications
Reference:
(1)
Letter from G. A. Hunger, Jr. (PECO Energy) to NRC dated October 29,1993 (2)
NRC Meeting Summary of November 3,1993 Meeting issued December 2,1993
Dear Sir:
In the above referenced letter, PECO Energy Company submitted preliminary information regarding the evaluation of the Indications identified on the Peach Bottom Atomic Power Station (PBAPS), Unit 3 core shroud. This issue was discussed with the NRC at a meeting on November 3,1993. At the meeting, questions were raised concoming the applicability of the quadrant screening criterion. PECO Energy agreed to revise the evaluation to clarify the significance of the quadrant screening criterion. This clarification is provided in the enclosed GENE-523-141-1093, Rev.1 report entitled, " Evaluation and Screening Criteria for the Peach Bottom Unit-3 Shroud Indications." Additionally, the basis for calculation of shroud crack growth rates at PBAPS has been included in the revised report.
If you have any questions, please do not hesitate to contact us.
Very truly yours, 4.
G. A. Hunger, Jr., Director Licensing Section MCK/eas Enclosure cc:
T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS I
9403230103 940314
- )
PDR ADDCK 05000278 x
I l
P PDR l
1 t...
j