ML20064K299

From kanterella
Jump to navigation Jump to search
Revised Application for Amends to Licenses DPR-44 & DPR-56, Replacing TS Pages 39,77a & 229 to Incorporate Recently Approved Amend & Minor Administrative Changes
ML20064K299
Person / Time
Site: Peach Bottom  
Issue date: 03/11/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064K302 List:
References
NUDOCS 9403230061
Download: ML20064K299 (3)


Text

.-

Ctctt;n Support Copartment 4

I' 10 CFR 50 CJ A

~..

I)ECO ENERGY

="J mal

$yINi"$8YS7$

Mach 11,1994 Docket Nos. 50 277 50-278 Ucense Nos. DPR-44 DPR 56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request

REFERENCE:

1)

Letter from G. A. Hunger, Jr. (PECO Energy) to NRC dated May 25,1993 2)

Letter from G. A. Hunger, Jr. (PECO Energy) to NRC dated December 21,1993

Dear Sir:

In the above referenad letters, PECO Energy Company (PECO Energy) submitted, in '

accordance with 10 CFR 50.90, Technical Specification Change Requests (TSCRs) 92-06,93-04 and 93-27 which requested changes to Appendix A of the Peach Bottorn Atomic Power Station (PBAPS) Operating Ucenses. The proposed changes concern the removal of references to the Service Platform Holst, the recalibration of pressure switches using reactor thermal power instead of turbine first stage pressure and.

changes to Table 3.2.F to accurately describe the main stack high range and reactor building roof vent high range radiation monitors.

PECO Energy hereby requests that our original submittals be revised such that the submitted page 39 for Unit 2 and 3, and pages 77a and 229 for Unit 3 only, be deleted and replaced with the attached revised page 39 for Units 2 and 3, and pages 77a and 229 for Unit 3 only. These pages are being revised to incorporate a recently approved amendment and minor administrative changes. This issue was discussed between Ken Graff (PECO Energy) and Steve Dembek (NRC) on March 9,1994.

.$k3k00bk0$b 7.

O

March 11,1994 Page 2 We have determined that these revisions do not alter our evaluations of any of the 10 CFR 50.59 standards, and therefore, do not affect our conclusion that TSCRs 92-06, 93-04 and 93-27 do not constitute an unreviewed safety question. Also, we have concluded that the proposed revisions do not affect the information supporting a finding of No Significant Hazards Considerations and the information supporting the EnvironmentalImpact Assessments.

If you have any questions concerning this submittal, please contact us.

Sincerely,

?e 1

G. A. Hunger, Jr., Director Licensing Section

Enclosures:

Affidavit, Attachment cc:

T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, Senior Resident inspector, PBAPS, USNRC W. P. Dornsife, Commonwealth of Pennsylvania i'

i

c COMMONWEALTH OF PENNSYLVANIA :

ss.

COUNTY OF CHESTER D. M. Smith, being first duly sworn, deposes and says:

That he is Senior Vice President of PECO Energy Company; the applicant herein; that he has read the attached revised pages for Technical Specification Change Requests (TSCRs) 92-06,93-04 and 93-27 for changes to the Peach Bottom Atomic Power Station Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

Schlor Vice President Subscribed and sworn to before me this day of ttAo

1994, 7

is&nr c9D /

/

N Notary Public n1r rMNc Des A S ws%Mt?%L?%

.