Monthly Operating Repts for Feb 1994 for Vogtle Electric Generating Plant
ML20064J973
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1994
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0312, LCV-312, NUDOCS 9403220140
Download: ML20064J973 (12)


Text

I

.. au. c u ., me v.r o ~ , x l

uo , . . , .. .., . ~ ,m in d t m :p U?., C' %

[j ; s n ji, r /li.y ,1 o 's '.j (

t . ,. -J .,, a , , 7 c , : . , "j t  ;

- l c.x. m cay Georgia Power 1

- n .- y . n, g j_,, ;, ,

"r a.n% u n , n tt y g <,1 m March 10, 1994 ,

LCV-0312 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Conunission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTilLY OPERATING REPORT Enclosed are the February 1994 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/JLUgmb Enclosure cc: GesIgia Power Compitpy Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commit.sion Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Ilood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle

/

/ ,

9403220140 940228 ADOCK 0500 4 / ;

PDR

..R.- v v u

ENCLOSURE 1 1

VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR FEBRUARY 1994 TABLE OF CONTENTS NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT FMUTDOWNS AND POWER REDUCTIONS Page VI-4 ,

l i

'l l

NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 FEBRUARY 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

FEBRUARY 02 05:57 UNIT 1 AUTOMATIC TRIP ON PRESSURIZER LOW PRESSURE. ENTERED MODE 3'.

FEBRUARY 02 06:10 NOTIFICATION OF AN UNUSUAL EVENT DECLARED FOR UNIT 1 DUE TO AN EMERGENCY CORE COOLING SYSTEM DISCHARGE TO THE REACTOR VESSEL.

FEBRUARY 02 07:50 NOTIFICATION OF AN UNUSUAL EVENT EXITED FOR UNIT 1.

FEBRUARY 03 20:07 UNIT 1 ENTERED MODE 2.

FEBRUARY 03 21:23 UNIT 1 REACTOR CRITICAL.

FEBRUARY 04 02.40 UNIT 1 ENTERED MODE 1.

FEBRUARY 04 07:00 UNIT 1 GENERATOR TIED TO THE GRID.

FEBRUARY 05 23:59 UNIT 1 RETURNED TO 100% POWER.

FEBRUARY 28 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

?

s V1-1 b

, - , . - - - ~ , -

- a , , r

t. .

OPERATING DATA REPORT DOCKET NO. 50-424 DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 OPERATING STATUS

1. UNIT NAME: VEGP UNIT 1
2. REPORT PERIOD: FEBRUARY 1994
3. LICENSED THERMAL POWER (MWI): 3565
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1169
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223 *
7. MAXIMUM DEPENDABLE CAPACITY (NET MWo): 1169 *
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: ITEMS 6 / ND 7 CHANGED BASED ON RECAllBRATION OF UNIT WATT. HOUR METERS TO CORRECT FOR THE VOLTAGE DROP OF THE PT CIRCUlT.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 672 1416 59161
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 632.6 1376.6 51251.7
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 623.0 1367.0 50239.9
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GPOSS THERMAL ENERGY GENERATED (MWH): 2156617 4796375 168517573 17, GROSS ELEC. ENERGY GENERATED (MWH): 742817 1656195 56639157
18. NET ELEC. ENERGY GENERATED (MWH): 708217 1582665 53823957
19. REACTOR SERVICE FACTOR 94.1 % 97.2 % 86.6%
20. REACTOR AVAILABILITY FACTOR 94.1 % 97.2 % 86.6 %
21. UNIT SERVICE FACTOR: 92.7 % 96.5 % 84.9 %
22. UNIT AVAILABILITY FACTOR: 92.7 % 96.5 % 84.9% .
23. UNIT CAPACITY FACTOR (USING MDC NET): 90.2 % 95.9 % 82.8% '
24. UNIT CAPACITY FACTOR (USING DER NET): 90.2 % 95.6 % 82.1 %
25. UNIT FORCED OUTAGE RATE: 7.3% 3.5% 5.5%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A V1-2

. . ._ m . . . _ - _ .. ~ _ . -_. .. . _ .

k UNIT 1 AVERAGE DAILY DOCKET NO. 50-424

<20WER LEVEL DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 DAY Not MW 1 .... . 1186 *

2. . , .. . 207
3. . . 0
4. .. .. . . . 206 5.... . . . . 871 6 .. . . .. 1173
  • 7 .. . . 1177
  • 8 .. . . . 1173 *
9. . . . 1165
10. . . . . 1177 *
11. .. . . . . 1181*
12. . . . 1182
  • 13.. . 1179
  • 14 . . . . . . 1183
  • 15 . . . 1181 * ,
16. . . . .. . 1180
  • 17 . . . 1180
  • 18 .. ... ... 1175
  • 19 .. . . .. . 1176
  • 20 . ., . . 1174
  • 21 . . . . .. . 1175 *
22. . . .. 1174
  • 23.......... 1170
  • 24 .. .. . .. . . 1179 *
25. . . . . 1182
  • 2 6 '. . . . . .. ... 1181 *
27. . . . 1185
  • 28 ... . . . 1183
  • h
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 7 e -r

. . _. - - ~ _

W

. . , , .4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 424 DATE: MARCH 1,1994 UNIT NAME: VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 REPORT MONTH FEBRUARY 1994 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE 94-1 2/2 F 49.0 B,G 3 1-94-1 JE PT SEE BELOW

_ ._._._m..._...____ m._ _

F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE '

S: SCHEDULED A-EOUIPMENT FAILURE (EXPLAIN) 1 MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 OTHER(EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

EVENT.94d CAUSE: THE DIRECT CAUSE OF THIS EVENT WAS THE INADVERTENT DEPRESSURIZATION OF THE 1PT-0457 AND 1PT 0458 COMMON REFERENCE LEG DURING MAINTENANCE, WHEN THE 1PT-0457 TRANSMITTER SWUNG INTO A TUBING ISOLATION VALVE AND CAUSED IT TO OPEN. THE ROOT CAUSE OF THIS EVENT WAS A COGNITIVE PERSONNEL ERROR ON THE PART OF THE INVOLVED l&C TECHNICIAN BY NOT SUPPORTING THE TRANSMITTER DURING REMOVAL.

CORRECTIVE ACTIONS: PRESSURIZER PRESSURE TRANSMITTER 1PT-0457 WAS REPLACED AND CALIBRATED AN ENGINEERING REVIEW OF PRESSURIZER TRANSMITTER PROBLEMS IS BEING PERFORMED. A SAFETY AND LICENSING REVIEW WILL BE PERFORMED TO EVALUATE THE POSSIBLE USE OF THE TEST lN-BYPASS SYSTEM FOR CORRECTIVE MAINTENANCE ON CERTAIN INSTRUMi N rs.

l 4  ;

)

i vi-4 'I l

4 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR FEBRUARY 1994 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 i

1 i

i l

I l

7.

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 l

1 i

FEBRUARY 01 00:00 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS. l FEBRUARY 28 23:59 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS. j j

i i

I 1

l l

I V2-1

OPERATING DATA REPORT DOCKET NO. 50425 DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 OPERATING STATUS

1. UNIT NAME: VEGP UNIT 2
2. REPORT PERIOD: FEBRUARY 1994
3. LICENSED THERMAL POWER (MWt): 3565
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1169
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223 *
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1169 *
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: ITEMS 6 AND 7 CHANGED BASED ON RECALIBRATION OF UNIT WATT-HOUR METERS TO CORRECT FOR THE VOLTAGE DROP OF THE PT CIRCUIT.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 672 1416 41905
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 672.0 1389.6 37430.0
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 - 0.0
14. HOURS GENERATOR ON-LINE: 672.0 1372.7 36899.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 2393295 4822735 121902233
17. GROSS ELEC. ENERGY GENERATED (MWH): 829473 1663330 41345367
18. NET ELEC, ENERGY GENERATED (MWH): 795223 1592300 39339777
19. REACTOR SERVICE FACTOR 100.0 % 98.1 % 89.3%
20. REACTOR AVAILABILITY FACTOR 100.0 % 98.1 % 89.3%
21. UNIT SERVICE FACTOR: 100.0 % 96.9 % 88.1 %

22 UNIT AVAILABILITY FACTOR: 100.0 % 96.9 % 88.1%

23. UNIT CAPACITY FACTOR (USING MDC NET): 101.2 % 96.5 % 84.5 %

24, UNIT CAPACITY FACTOR (USING DER NET): 101.2 % 96.2 % 84.6 %

25. UNIT FORCED OUTAGE RATE: 0.0% 3.1% 1.6%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP : NA V2-2

UNIT 2 AVERAGE DAILY DOCKET NO. 50-425- ,

POWER LEVEL DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 DAY Net MW

1. . . 1189
  • 2... . . 1187
  • 3... . .. 1183 *
4. . . 1185 *
5. . . 1185
  • 6.. . . . . . . 1185 *
7. . . . 1186 *
8. . . . . . 1180 *
9. .. ... . 1168 10 .. . 1182 *
11. . . 1188 * '

12 .. . . . . , 1188

  • 13 . .. . .. 1186 *
14. . . . 1188 *
15. .. . . . . . 1185
  • 16.. . . . . .. 1186 *
17. . . . . 1186 *
18. . . . . .. . 1183
  • 19 . . . .. . 1180
  • 20.. . . . . 1178
  • 21.. . . .. 1179
  • 22 . . . , ., 1178
  • 23 ... . . ... 1174
  • 24 ,, . .. ... 1183 *
25. , . . . 1186 *
26. . .. .. 1183 *
27. 1188
  • 28 . . . . . .. 1189 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS

.o J

V2 3 l

1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: MARCH 1,1994 UNIT NAME: VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 8264104 REPORT M,0 NTH _ FEBRUARY 1994 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA l

U ORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3. AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY REST RICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS. >

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) l l

l V2-4 u, . . _ _ _ _ _ .. . - - _ _ _ - .

.. . ~.

ENCLOSUllE 3 VOGTLE ELECTitlC GENEllATING PLANT-UNITS 1 AND 2 CIIAL.LENGES TO PoltV Olt SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE: MARCH 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 EVENT DATE TAG NO. TYPE DESCRIPTION 2/2/94 1PV-0455A A POWER OPERATED RELIEF VALVE (PORV).1PV-04SSA. OPENED MOMENTARILY DURING A TEN MINUTE INJECTION BY THE CVCS CENTRIFUGAL CHARGING PUMPS. THE SAFETY INJECTION ACTUATION WAS ASSOCIATED WITH THE AUTOMATIC REACTOR TRIP.