ML20064J505
| ML20064J505 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/28/1994 |
| From: | Feigenbaum T, Nardone P NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-94027, NUDOCS 9403210267 | |
| Download: ML20064J505 (5) | |
Text
.
Seab k NH 03874 Telephone (603)474 9521
~
AfI$
[C Facsirnile (603)474 2987
=
Energy Service Corporation Ted C. Feigenbaum Senior Vice President and Chief Nuclear Officer 1
NYN. 94027 March 11,1994 United States Nuclear Regulatory Commission Washington, DC 20555
- Attention:
Document Control Desk
Reference:
Facility Operating 1.icense NPF-86, Docket No. 50-443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please Gnd Monthly Operating Report 94-02. This report addresses the operating and shutdown experience relating to Seabrook Station Unit i for the month 'of February,1994 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 11 Very ly yours, d' < dub Ted C. Feigenbaum Enclosure cc:
Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate 1-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 QV l
Qv 9403210267 940228 a member of the Northeast Utilities system PDR ADOCK 05000443 M
OPERATING DATA REPORT 1
DOCKET NO. 50-443 UNIT Seabrook 1 DATE 03/11/94 COMPLETED BY P. E Nardone TELEPHONE 1603) 474-9521 Ext. 4074 OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
FEBRUARY 1994 3.
Licensed Thermal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe;:
'1148 6.
Maximum Dependable Capacity (Gross MWe):
1200 7.
Maximum Dependable Capacity (Net MWe):
1150 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report. Give Reasons:
Not Applicable 9.
Power Level To Which Restricted. If Any:
None
- 10. Reasons 'For Restrictions, If Any:
Not ADDlicable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672.0 1416.0 64609.0
- 12. Number Of Hours Reactor Was Critical 310.8 896.4-28603.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 953.3
- 14. Hours Generator On-Line 277.1 862.7 26539.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 907870
?905635 86338081
- 17. Gross Elec. Energy Generated (MWH) 313685 1010749 29984492
- 18. Net Electrical Energy Generated (MWH) 301048 971135 28794753
- 19. Unit Service Factor 41.2 60.9 81.3
- 20. Unit Availability Factor 41.2 60.9 81.3
- 21. Unit Capacity Factor (Using MDC Net) 39.0 59.6 78.0 i
- 22. Unit Capacity Factor (Using DER Net) 39.0 59.7 78.1
- 23. Unit Forced Outage Rate 58.8 39.1 7.9 24, Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
REFUELING. 04/16/94. 57 DAYS
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Annlicable
- NOTE.
" Cumulative" values based on total hours starting 08/19/90, date Regular Full Power Operation began.
1 of 4
... = -. -
- - - -. - - -,. - _..,. ~.
s.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT Seabrook 1 DATE 03/11/94 COMPLETED BY P. E. Nardone
~ TELEPHONE (603) 474-9521
' Ext. 4074
' MONTH FEBRilARY. 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net)
(MWe-Net) 1 0
17 141 I
2 0
18 903 3
0 19 1147 1
l 4
0 20-1152 i
.5 0
21 1152
.! ~
6 0
22 1151 i
j 7
0 23 1150
}
8 0
24 1150 l
9 0
25
'1150 i
10 0
26 1149
{
11 0
27 1149 l
1 i
12 0
28 1149 13 0
14 0
16 0
16 0
i INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
2 of 4
=..~,---w-~n.,
~p
,wr,--.-..w-1.n----,
w-..-
,, m mer r.mwww.-m-.-,,,,,
,,----,w-wme,,,,,.w,,,.,,-mngws e wr
,,m,-, m,
,w.
ww -o ww w s n - w
ji;lll!
- ll lll!li l1iililili!;
l i
- !I e
1 1
e 2 Vl n 5 f
GI at o 9 o
SS o
i Mt o 1
d n
r r w
4 4
1 i f a k
4 a
7 7
o 9
N 4
0 e
opn l
o 3
o
/
4 g
ee%
4 r
1
)
a 4
b 1
E 3
P v r0 n a
/
0 t
eu1 io l
s 0
e 3
. 6 x
5 S
0 P
(
E oyt gl l a
.TE E
ncr m i
er OI T Y N sl t o NNABO UD H
al rf T
DP euan rf ui E
EE c
q K
T L C
EE e,
r O
L T d weo D
P oh f f l t M
O os 1
f 0 n C
t eo0 o l h i
ut e4 t s
c9 c eyn a
rb aR mE e ad rL v e
e eo i
i c
s sf et v
n a ur ec t
e a eS e m
n
)
c r
pcp r
amh o) n eor i
r r ot i0i rt u r 's e
.o mcr nt a
r c
t ah t c aSf oc -
l one wt s r
mu p
C oR c
ed ccd d nx i
i s gt n Si es eoE
&t t t i n a
t uuR i (
cn ah i e
l l a no t
eA e mT rk e
- aa miir a r s
v o
uos d uuot v er e S
u e
t
.d r u on nt newuh N
a r
u t a h a a uor oDt O
C P
AAA s c t MMA C pP( O I
4 e - - - -
T 9
M1 234 5
9 C
9 3
U 1
DE R
V R
R A
E U
W R
O B
e P
E et 4
t F
s n r f
D n e o o
N e v p 1
A cE e 0
3 H
i R
0 S
T L
N N
n W
O 4
o O
M 9
i D
t T
T a
3 n
U R
r H
O i
o m
S P
f gt a
E on c x
T R
i ea E
I d t N
ot R 4
)
e
)
U h u n
s n
t h n i
n i
eS w a
e a
M o
l c
l D
p ni p
x oL x
E E
i
( t t&
(
s c
"n ee i g r
o rT r n o
s A
u t i r) a
/
l r
s ner n e
B i o eivE i
R a
R ai a
F e rt l l c
yT aap t n gr r n x n
na n ort oE o )s enit osi(
mel at i t i
r 9
- pt el a n a r t
u nin u uri r e ar o 4
ouif gemeh uH 9
s qaeepd pt D(
3 aE MRROAOO e - - - - - - - -
RABCDEFGH 2
'e p
F y
T 49
/
d e
1 e
t 0
l a
/
d u D
2 ed 0
ce rh oc F S 1
0 o
N 4
FS 9
1 i'
ll;'
I
i DOCKET NO. 50-443 UNIT Seabrook 1 DATE 03/11/94 COMPLETED BY P. E. Nardone TEl.EPHONE (603) 474-9521 Ext. 4074 REFUELING INFORMATION REQUFST -
- 1. Name of facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
Refueling Outage 3. 04/16/94 3.
Scheduled date for restart following refueling:
Refueling Outage 3, 06/11/94 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
No
- 5. Scheduled date(s) for submitting licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling. e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:
193 (b) 136 l
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 j
No increase in storage capacity requested or planned.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core of fload capability.
The current licensed capacity is adequate until at least the year 2010.
4 of 4
-