Text
'
if Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 March 10, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 l
Monthly Operating Report February, 1994 Attached is the Monthly Operating Report for February, 1994 for the Monticello Nuclear Generating Plant.
Yf oger O Anderson Director Licensing and Management Issues cs Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment J
/j'1f
.b !
f i
\\\\
9403210261 940220 PDR ADOCK 05000263 R
l OPERATING DATA REPORT s,
DOCKET.NO.
50-263 DATE 3-1-94 COMPLETED BY H. H. Paustian.
TELEPHONE. 612/295-5151
- OPERATING STATUS
] Notes
]
1.
Unit Name :
Monticello
]
]
- 2. Reporting period:
February
]
]-
- 3. Licensed Thermal Power (MWt) :
1670
]
]
- 4. Nameplate Rating (Gross MWe):
'569
]
]
'5.
Design Electrical Rating (Net MWe) :
545.4
]
]
'6. Maximum Dependable Capacity (Gross MWe) :
564
-]
]
- 7. Maximum Dependable Capacity (Net MWe) :
536
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
.9.
Power Level To which Restricted, If Any (Net MWe) :
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE-CUMULATIVE
- 11. Hours In Reporting Period 672 1416 198697
- 12. Number Of Hours Reactor Was Critical 672.0 1416.0 160791.7.
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 672.0 1416.0 158016.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0-0.0
- 16. Gross Thermal Energy Generated (MWH) 1117992 2358391 243623171
- 17. Grose Electrical Energy Generated (MWH) 380027 801512 82356175
- 18. Not Electrical Energy Generated (MWH) 366572 773152 78791945
- 19. Unit Service Factor 100.0%
100.0%
'79.5%
'. 20. Unit Availability Factor 100.0%
100.0%
79.5%
- 21. Unit Capacity Factor (Using MDC Net) 101.8%.
101.9%
74.0%
- 22. Unit Capacity Factor (Using DER Net) 100.0%
100,1%
72.7%.
- 23. Unit Forced Outage Rate 0.0%
.0.0%
3.~6%:
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of.Each)
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
1 4
,,,,mr.
,r.-----
.r.-,-
,,w._
.,-.-,r,-
3m--
.-v.
m.,--.m.w
,,,--...--..,-,..,..,-r
,,.,,---...-.m...
-n
--g
.l-AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO.
50-263 UNIT Monticello~~~
DATE 3-1-94 COMPLETED 2Y H. H.
Paustian TELEPHONE 612/2h'-5151 4
MONTH OF February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL (MWe-Net)
(MWe-Net) 1 547.
17 545.
2 547.
18 549.
3 547.
19 547.
4 546.
20 549.
5 547.
21 546.
6
- 546, 22 519.
7 546.
23 536.
8
- 547, 24 549.
9 547.
25
- 546, 10 546.
26 549.
11 548.
27 546.
12 545.
28 550.
13 543.
14 546.
15 546.
16 548.
7 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
.i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE a
l DOCKET NO, 50-263 DATE 3-1-94 COMPLETED BY H.
H.
Paustian 4
i TELEPHONE 612/295-5151-MONTH FEB 4'
02-1-94 to Power operation.
02-22-94 02-22-94 Power reduction to 80% to backwash Condensate Demineralizer.
02-23-94 Power reduction to 85% to backwash Condensate Cemineralizer.
02-23-94 to Power operation.
02-28-94 F
t f
4 1
/I Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
4
~,
UNIT NAME lonticello
[
UNIT SHUTDOWNS AND PO'ER REDUCTIONS DOCKET NO..
50-263 DATE ~ 3-01-94 COMPLETED BY 7. H. Paus uan REPORT MONTH _ February TELEPHONE. 612/295-5151 ~
l i.
l Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown (4)
(5)
Prevent Recurrence (3)
Condensate Demineralizer. quired to backwash Power reduction to 804 re 1
02-22-94 F
0 H
4 N/A SF FDM i
i 2
02-23-94 F
0 H
4 N/A SF FDM Condensate Demineralizer. quired to backwash Power reduction to 85% re 3
)
i o
(
l s
i f
1 2
'3 4
i.
F: Forced R.eason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-A^ministrative d
~~
G-Operational Error (Explain)
H-Other (Explain) i i
-