if Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 March 10, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 l

Monthly Operating Report February, 1994 Attached is the Monthly Operating Report for February, 1994 for the Monticello Nuclear Generating Plant.

Yf oger O Anderson Director Licensing and Management Issues cs Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment J

/j'1f

.b !

f i

\\\\

9403210261 940220 PDR ADOCK 05000263 R

PDR

l OPERATING DATA REPORT s,

DOCKET.NO.

50-263 DATE 3-1-94 COMPLETED BY H. H. Paustian.

TELEPHONE. 612/295-5151

- OPERATING STATUS

] Notes

]

1.

Unit Name :

Monticello

]

]

2. Reporting period:

February

]

]-

3. Licensed Thermal Power (MWt) :

1670

]

]

4. Nameplate Rating (Gross MWe):

'569

]

]

'5.

Design Electrical Rating (Net MWe) :

545.4

]

]

'6. Maximum Dependable Capacity (Gross MWe) :

564

-]

]

7. Maximum Dependable Capacity (Net MWe) :

536

]

]

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

.9.

Power Level To which Restricted, If Any (Net MWe) :

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE-CUMULATIVE
11. Hours In Reporting Period 672 1416 198697
12. Number Of Hours Reactor Was Critical 672.0 1416.0 160791.7.
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 672.0 1416.0 158016.7
15. Unit Reserve Shutdown Hours 0.0 0.0-0.0
16. Gross Thermal Energy Generated (MWH) 1117992 2358391 243623171
17. Grose Electrical Energy Generated (MWH) 380027 801512 82356175
18. Not Electrical Energy Generated (MWH) 366572 773152 78791945
19. Unit Service Factor 100.0%

100.0%

'79.5%

'. 20. Unit Availability Factor 100.0%

100.0%

79.5%

21. Unit Capacity Factor (Using MDC Net) 101.8%.

101.9%

74.0%

22. Unit Capacity Factor (Using DER Net) 100.0%

100,1%

72.7%.

23. Unit Forced Outage Rate 0.0%

.0.0%

3.~6%:

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of.Each)
Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved.

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

1 4

,,,,mr.

,r.-----

.r.-,-

,,w._

.,-.-,r,-

3m--

.-v.

m.,--.m.w

,,,--...--..,-,..,..,-r

,,.,,---...-.m...

-n

--g

.l-AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO.

50-263 UNIT Monticello~~~

DATE 3-1-94 COMPLETED 2Y H. H.

Paustian TELEPHONE 612/2h'-5151 4

MONTH OF February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL (MWe-Net)

(MWe-Net) 1 547.

17 545.

2 547.

18 549.

3 547.

19 547.

4 546.

20 549.

5 547.

21 546.

6

546, 22 519.

7 546.

23 536.

8

547, 24 549.

9 547.

25

546, 10 546.

26 549.

11 548.

27 546.

12 545.

28 550.

13 543.

14 546.

15 546.

16 548.

7 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

.i NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE a

l DOCKET NO, 50-263 DATE 3-1-94 COMPLETED BY H.

H.

Paustian 4

i TELEPHONE 612/295-5151-MONTH FEB 4'

02-1-94 to Power operation.

02-22-94 02-22-94 Power reduction to 80% to backwash Condensate Demineralizer.

02-23-94 Power reduction to 85% to backwash Condensate Cemineralizer.

02-23-94 to Power operation.

02-28-94 F

t f

4 1

/I Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

4

~,

UNIT NAME lonticello

[

UNIT SHUTDOWNS AND PO'ER REDUCTIONS DOCKET NO..

50-263 DATE ~ 3-01-94 COMPLETED BY 7. H. Paus uan REPORT MONTH _ February TELEPHONE. 612/295-5151 ~

l i.

l Duration Reason Method LER System Comp.

Cause & Corrective No.

Date Ty(pe (hours)

(2) of No.

Code Code Action to 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

Condensate Demineralizer. quired to backwash Power reduction to 804 re 1

02-22-94 F

0 H

4 N/A SF FDM i

i 2

02-23-94 F

0 H

4 N/A SF FDM Condensate Demineralizer. quired to backwash Power reduction to 85% re 3

)

i o

(

l s

i f

1 2

'3 4

i.

F: Forced R.eason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-A^ministrative d

~~

G-Operational Error (Explain)

H-Other (Explain) i i

-