Monthly Operating Repts for Feb 1994 for Calvert Cliffs Nuclear Power Plant
ML20064J492
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/28/1994
From: Cruse C, Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403210255
Download: ML20064J492 (11)


Text

-.

I

.t g DALTIMORE . l GAS AND ELECTRIC

\

CALVERT CUFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY

  • t.USBY. MARYLAND 20657 4702 CHARLES H. CRUSE PLANT GENf HAL MANAGER ]

CALVEhT CUF FS March 15,1994 i

U. S. Nuclear Regulatory Commission Washington, DC 20555 >

A'ITENTION: Docurnent Control Desk SUlUECT: Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50 317 & 50-318 '

February 1994 OncratingData Reports __

The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours.

, , lh '

^

CilC/FP/bjd Attachments cc: D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC .

T. T. Martin, NRC P. R. Wilson, NRC R. A. Ilartlield, NRC R. I. McLean, DNR J. II. Walter, PSC '

P. Lewis, INPO K. Larson, ANI ,

s

r2A8aanZe88Ha7 x # ei

, coo *************************************************************************

UNIT l' OPERATING DATA REPORT -

oco*****s*******************************************************************

Docket No. 50-317 March 15, 1994 Prepared'by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 1., UNIT NAME Calvert Cliffs Unit 1

2. REPORTING PERIOD FEBRUARY 1994
3. LICENSED THERMAL POWER (MWT) 2700' 4., NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative
This month Year-to-Date to Date 1 11. HOURS IN REPORTING PERIOD 672 1,416 164,917
12. NUMBER OF HOURS REACTOR WAS CRITICAL 173.2 734.6 117,703.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. liOURS GENERATOR ON LINE 159.3 720 7 115,299.1 15.~ UNIT RESERVE SHUTDCWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 391,806 1,903,731 292,218,550
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 129,848 637,493 97,111,039 -
18. NET ELECTRICAL ENERGY GENERATED (MWH) 123,413 606,906 92,411,188
19. UNIT SERVICE FACTOR: 23.7 50.9 69.9
20. UNIT AVAILABILITY FACTOR 23,7 50.9 69.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 22.1 51.6 67.9 22.- UNIT CAPACITY FACTOR (USING DER NET) 21.7 50.7 66.3
23. UNIT FORCED OUTAGE RATE 17.9 23.2 8.8
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling, February 8, 1994, 90 Days ,

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

May 6, .1994 1

1 I

l

UNIT SilUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-317 UNIT NAME Calwrt Cliffs.UI ' '

DATE March 15.1994 COMPLETED BY Frank Piana TELEPHONE (410) 260-3821 REPORTMONTII February 1994 METIIOD OF StIUTflNG LICENSEE CAUSE & CORRECHVE DURAllON DOWN LYENT SYSlT.M COMPONENT ACTION TO NO. DATE TYPEl (IIOURS) REASON 2 REACf0R3 REPORT # CODE 4 CODES PREVENT RECURRENCE I

94-01 940124 F 34.8 A 4 317S4-01 ED INVT The unit automatically shutdown on 1/24/94 at 0926 due to a loss of the 120 Vac Vital Panel 1YO2.

94-02 940209 S 477.9 C 1 N/A N/A N/A Unit shutdown for planned refueling outage.

I f

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A- Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C- Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Administrative 9 - Other G - Operational Error H - Other

4 AVERAGE DAILY UNIT POWER LEVEL oco*********************************************************************

Docket No. 50-317 Calvert Cliffs Unit No. 1 March 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 FEBRUARY 1994

                              • r Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 0 17 0 2 92 18 0 3 781 19 0 4 862 20 0 5 862 21 0 6 863 22 0 7 862 23 0 8 819 24 0 9 0 25 0 10 0 26 0 l

11 0 27 0 12 0 28 0 13 0 14 0 15 0  !

1 16 0 i

l l

l i

j l

l

DOCKLT NO. 50-317 CALVERT CLIFFS - UNIT 1 Mareh 15,1994 1

SUMMARY

OF OPERATING EXPERIENCE February 1994 l The unit began the month shutdown in mode 3 due to a unit trip occurring late January due to a lor,s of the 120 Vac Vital Panel 1YO2. The unit was returned to power and paralleled to the grid on 2/2/94 at 1048.

On 2/8/94 at 1942 the unit commenced shutting down for a planned refueling outage. The unit was removed from the grid at 0206 on 2/9/94. The unit ended the month shutdown and defueled in mode

6.
  • T P

l r

1 F 0 t i

l l

l i

March 4,1994 Page 1 of 2 REFUELINS INFORMATION REQUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: Unit is currenuy shutdown for refueling.

Next shutdown for refueling will be March,1996.

3. Scheduled date for restart following refueling: May 6,1994. *
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Operation after refueling will require either " Core Operating Limits Report" or will require a change to Technical Specification 3/4.2.2, " Linear Heat Rate".

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

Submitted September 1993 for Core Operating Limits Report.

6. Important licensing considerations associated with the refueling.

None identified at this time.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a)O. (b) 1643. (Note 2)

  • Spent fuel pools are common to Units 1 and 2.
8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710. (NOTE 1) (b) 0.

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

March 2014 -

NOTE 1: 4710 totailleensed site storage capacity. I (1830 pool + 2880lSFSI) l 4

l NOTE 2: 72 Spent Fuel Assembiles in the ISFSt.

Entry has changed since last reported.

r

o***************************************************************************

UNIT 2 OPERATING DATA REPORT occ*************************************************************************

Docket No. 50-318 March 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD FEBRUARY 1994
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. . MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 672 1,416 148,272
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,243.2 107,280.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 672.0 1,240.0 105,763.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,787,166 3,296,932 270,162,475
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 603,487 1,109,784 89,265,653 y
18. NET ELECTRICAL ENERGY GENERATED (MWH) S80,228 1,063,837 85,306,971
19. UNIT SERVICE FACTOR 100.0 87.6 71.3
20. UNIT AVAILABILITY FACTOR 100.0 87.6 71.3
21. UNIT CAPACITY FACTOR (USING MDC NET) 104.0 90.5 69.7
22. UNIT CAPACITY FACTOR (USING DER NET) 102.'2 88.9 68.1 4 23. UNIT FORCED OUTAGE RATE 0.0 12.4 5.8
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX-MONTHS (TYPE, DATE AND DURATION):

N/A

25. IF. UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A 1

y

  • a l 2 t a t e g. e e 3 U 4 nD r a nm r eem u 1

- 9 2 i i a 4 8 fs 9 r 9 t

a 8 ad t s u 8 f

Mn s bi x p 1 n uo or f 1

3- s he 9 -

r a il r C 1 5, i P

a 0 6 og d ed p t

nt e a e 5 1

- A 3

t 2 f ni ee p k h n 8

e r h k E E 0 nh eft oa oi t 0 0 v c 1

1 C w e. 8 8 ch e r n 0 0 at r 3- l a a r a 1 V I N 0legAno 2 t b t dr dr 0

5 C M F (4 T E c n 5 s r a di e sr n a a C R a xri2 ra whe t

EOR oc ei a sd d d 4 bou o) t r t

l epn e n n RT U SrDf 7f u a a RNC 6 e e2 u eicae.

d r S t

S t

v4 gs ckl OOE OE EBN YE 0. a t rsl 1 d

- e pv E E NMT TAADO CI T R

&CT 2WiavVc 0 a pf n g, eieRd .

u n aael i wb r av t

if gd e E

E E

E ENDEH EAN E on rl e2 -r esl r nebi e f I I KT CI TP EF S

U V E

d es i

t mr c eteeeapws pwr

( si asia cl r plaie l l 4 5 L1 A ON PF C R P dut eytshd is r we r eed e ey v nlvl DU MT sv gv!2aas e vS rlancbeewev et ca l t

O sVo a i n uof af ef nf w f

C a rweinTP b

ns er . oliieiee t

i t ei u nt n e gt e e l ri pl en r r s r a m a

wr qi ai7ee e eh .

r d ouc aet 7TTtyT PTAmHli f 6 hh phi w

t mc aS a

o s

r I

ccd L S T Sied l

t aunce r N

O N

ES NE laamiu uu d nn ot nd he I

OD V oaa uoet t

T C 4 PO MC R hMMACRO t

e - - - - - -

U 9 O M1 23459

- D 9 C E 1 y 3 R r Md R a Ei u TD J E r S  ! S b

W e YtC S

O F P l n D T i E # o N N ETT i t

a

. A S O 1 MENR VPO /

A i n

N M C EE N m I a W T L R x O R E _

D O e s

P F n T E OGN 3 R e O D1 NO c l R OrWF i

I S nL o

I I TOC 5 t i&

T I

TUDA EI I

E ee s t c

i g r N MS R rT u t r n o r

U r si l

ioa n ei e E r -

2 Fe c Rav ril N y a eagorrTtar no t

O S

nn t A A m nnt i at it osi -

E pt elel anar _

R :inu n uif gemehr e uri oqa e e pd pt -

N)

OS sEMRROA a

e - - - - - - - -

OO _

I T R RABCDEFGH AU 0 RO 2 UII D(

I -

E P _

. Y F T _

d _

le E 6 2 du _

T 2 ed _

A 0 4

ce -

D rh 9

FS oc _

O 2

0 FS -

N 4 1

9 -

^

l i

l I

AVERAGE DAILY UNIT POWER LEVEL

  • oo***'******************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 March 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 FEBRUARY 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Not) Day (MWe-Net) 1 867 17 870 2 867 18 871 3 872 19 872 4 872 20 869 5 872 27 873 6 873 22 871 7 872 23 870 8 872 24 872 9

9 867 25 871 10 869 26 710 11 870 27 836 12 870 28 869 13 870 14 368 r

15 870 16 870

!. f ,

?

POCNET NO. 50-318 CALVERT CLIFFS - UNIT 2 March 15,1994

SUMMARY

OFOPERATING EXPERIENCE February 1994 The unit began the month at 100% reactor power (865 MWe).

, On 2/20S4 at 0015 while a Surveillance Test was being performed on the Control Element Assembly (CEA), one CEA dropped causin;; the power to decrease to approximately 97?o. The problem was corrected and the power was restored to 100fc at 0420. ,

On 2/26/94 at 0200 power was reduced to approximately 750 MWe for Main Turbine Valve testing, e Water Box cleaning, Data Acquisition System (DAS) repairs and repair of the Intercept and Reheat Valves. Power was further reduced during the maintenance to approximately 76% to repair the 25A Feedwater Ileater Tube Side Relief Valve (2-RV-1427) which was lifting due to a broken f.,nring.

s. The relief valve was repaired and the power was restored to 100Tc at 09(H)on 2/27/94. The unit remained at 100% power (870 MWe) for the remainder of the month.

Io P

6 1

3

,-, y_, g , , ,-py,

l

  • 1

' March 4,1994 l Page 2 of 2 l

REFUELING INFORMATION REQUESI

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
2. Scheduled date for next refueling shutdown: March 3,1995.
3. Scheduled date for restart following refueling: May 17,1995.
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Unknown.

G. Scheduled date(s) for submitting proposed licensing action and supporting information.

Unknown.

6. Important licensing considerations associated with the refueling.

None identified at this time.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217. (b) 1643. (Note 2)

  • Spent fuel pools are common to Units 1 and 2.

1

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710. (NOTE 1) (b) O.

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

March 2016.

NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 72 Spent Fuel Assemb!!es in the ISFSt.

Entry has changed since last reported.

l

)

,