Interim Deficiency Rept Re Gamma Plug Installations. Initially Reported on 820804.Walkdown of Accessible Installed Plugs Continuing to Document All Nonconforming Conditions.Next Rept Due by 830331
ML20064J423
Person / Time
Site: Zimmer
Issue date: 01/05/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2197, NUDOCS 8301180069
Download: ML20064J423 (2)


Text

.

Till! CINCINNATI GAS & ELECTRIC COhfPANY cyl WM. H. ZIMMER NUCLEAR POWER STATION clNCINN ATI. OHIO 45 Pol P. O.

BOX 201 January 5, 1983 MOSCOW, OH 45153 QA-2197 E' A DORGM ANN SE N#OR V*C E P#f %iDE NT U. S. Nuclear Regulatory Conatission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50. 55(e) ITEM M DEFICIENCIES IN GAMMA PLUG INSTALLATIONS DOCKET No. 50-358 CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300 JOB E-55<30 FILE NO. MRC-8, M-56 Gentlemen:

This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on August 4, 1982 as a potentially reportable deficiency under 10CFR50.55(e).

Sargent & Lundy (S&L) and CG&E have completed preliminary evaluations of this condition and have concluded that the minimum allowable thread engagement for plugs in the pipe wall or weld boss is b;" for pipe systems with desien pressures less than 1350 psig; plugs not completely engaged in systems with pressures greater than 1350 psig must be individually evaluated.

Task III of the Zimmer Quality confirmation (QCP) is continuing its walkdown of accessible installed plugs and will document all nonconforming conditions on Nonconformance Reports (NR). Upon completion of the walkdown, the associated NRs will be evaluated; the significance of this deficiency will be determined and a report describing a schedule for completion of action on this item will be submitted by March 31, 1983.

8301100069 830105 PDR ADOCK 050003S8 S

PDR

-.y g M'

'JAN 13 sg3

O U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 January 5, 1983 - QA-2197 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI CAS & ELECTRIC COMPANY E. A. BORGMANN SENIOR VICE PRESIDENT FKP:as cc: NRC Office of Inspection & Enforcement Washington, D.C.