Forwards Response to NRC Questions Re Proposed Changes by Util to Tech Spec 4.2.2.2.e.2 Involving Fxy Limits
ML20064J157
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/21/1978
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7812290127
Download: ML20064J157 (2)


Text

Aiacama Rwer Ccmmy

., * *

  • 600 Nom 18:9 5 rse est Cece Boa 2641 Sergaam. Atatra 35291 Te ecnone 205 323-5341 F. L CtAYTON. JR AlabamaPower Senect %ce Pesicent tre swem eectnc ustem

. December 21, 1978 Docket No. 50-348 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission flashington, D.C.

20555 Attn:

Mr. Albert Schwencer

Dear Mr. Schwencer:

Re: Changes to Operating License No. NPF-2 Technical Specifications Alabama Power Company proposed changes to the Joseph M. Farley Nuclear Plant Operating License No. NPF-2 Technical Specification 4.2.2.2.e.2 in-volving Fxy limits. Enclosed is the response to an NRC question asked during review of the subject changes.

If you have questions, please advise.

Yours very truly, Y

s.,

F. L. Clayt

, Jr. 05 i

FLCJr/TNE:bhj cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge f

7N.2?.9OM p

}[

I

.u~

ENCLOSURE FARLEY UNIT 1 Fxy CHANGE NRC OUESTION:

The bases for the proposed Fxy change state that bounding values of the power factor F (Z)X (Relative Power) were g

calculated as a function of elevation by assuming various load follow transients on the reactor through insertion and removal of control rod banks C and D.

Describe the

'l calculations that were performed and discuss the load follow transients that were assumed.

RESPONSE

The methods of WCAP-8385, Ropical Report: Power Distribution Control and Load Following Procedures)were employed utilizing the PEAKING FACIOR subcase analysis. The analysis was justified in the letter NS-CE-1749 of April 6,1978 from C. E. Eicheidinger of Westingouse to J. F. Stoltz, LWR Branch Chief of the NRC Division of Project

~

Management.

.