ML20064J144
| ML20064J144 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/07/1978 |
| From: | Gilleland J TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20064J143 | List: |
| References | |
| NUDOCS 7812290117 | |
| Download: ML20064J144 (2) | |
Text
~l I
i
\\
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 830 Power Building C.
+
EC 7 IQ f
=
i co d
Ch l e i ;_;
oc pf2 Mr. James P. O'Reilly, Director N
3 '- "
Office of Inspection and Enforcement W
U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Dear Mr. O'Reilly:
/
(
SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - NRC-0IE REGION II LETTER RII:PKV 50-327/78-33, 50-328/78 INSPECTION REPORT - RESPONSE TO DEFICIENCY The subject letter dated November 16, 1978, cited TVA with one deficiency.
Enclosed is our response.
If you have any questions concerning this matter, please get in touch with M. R. Wisenburg at FTS 854-2581.
Very truly yours,
'J.
E. Gilleland Assistant Manager of Power
(
Enclosure cc:
Mr. John G. Davis, Acting Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 781229on1 I
n(iM6 i
~
ENCLOSURE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 INSPECTION REPORT 50-327/78-33 AND.50-328/78-24 RESPONSE TO DEFICIENCY DEFICIENCY 327/78-33-02 AND 328/78-24-01 Criterion XVII of Appendix B to 10 CFR 50, as implemented by the FSAR, Paragraph 17.lA.17, requires in part, " Sufficient records shall be maintained to furnish evidence of activities affecting quality.
TVA procedure SNP-CP-No. W-1, Rev.
O, Paragraph 7 requires "A daily log of holding oven temperatures shall be maintained.
Temperatures shall be recorded at the beginning and at the mid-point of each shift during which material is issued from the oven."
Contrary to the above requirements, the following was observed:
On October 26, 1978, during inspection of the turbine building rod issue station, the inspector noted that only one rod oven
. temperature chech was logged on October 20, 1978, October 21, 1978 and October 25, 1978.
In addition, no oven temperature check had yet been logged on October 26, 1978, at the time of the inspection which was 1:50 p.m.
Temperatures logged on either side of the missed entrees were listed as satisfactory and a check on October 26,1978, at 1:55 p.m. was satisfactory.
CORRECTIVE STEPS WIIICII liAVE BEEN TAKEN AND T!!E RESULTS ACl!IEVED:
Examination of the turbin[ building rod issue station logs on October 26, 1978, for a period of a month preceding that date showed that the rod ovens had been checked and documented in accordance with SNP Construction Procedure No. W-1 except for the dates cited.
Through interviews with the lead inspector in charge of the rod issue station and others who were assigned to this station on October 20, 21, 25, and 26, 1978, it was determined that the weld rod ovens were working properly during this period.
Therefore, it was concluded that these were
(
isolated cases of noncompliance with SNP Construction Procedure No. W-1.
The lead inspector in charge of the turbine building rod issue station was reinstructed in the requirements of SNP Construction Procedure No. U-1.
Weld rod oven temperature checking and documenting is now being performed in accordance with SNP
. Construction Procedure No. W-1.
CORRECTIVE STEPS Ul!ICl! S!!ALL BE TAKE!!
TO AVOID FURTliER NONCOMPLIANCE:
The lead inspectors in charge of the weld rod g'f'tHM ssug stAtionr Will exercise closer surveillance over maintenanceha oVeh""
temperature logs.
DATE WIIEN FULL COMPLIANCE WILL BE ACIIIEVED:
' ',0 'b -
We are now in full compliance.
-